Quantity Calculation:
3.08
4.01 1,100 16.90
4.02 1,100 16.90
4.03 1,100 16.00 0.20
4.04 1,100 12.00 0.15
4.05 1,100 17.00
4.06 1,100 12.00
4.07 1,100 12.00
4.08 1,100 12.00
4.09 1,100 12.00
4.1 1,100 LHS = 2 RHS = 2
4.11 1,100 1.70 2 sides
4.12 1,100 2.00
2- Woji Project:
Items Quantity Unit Rate
2
Wearing 30,600.00 m 4,000.00
Kerb 4,080.00 Lin.m 10,097.63
Interlock 2,448.00 Lin.m 11,150.00
Total
Quantity Calculation:
3- Summary:
WOJI 190,893,530.40
Amount
32,313,600.00
164,419,200.00
52,866,000.00
167,409,000.00
21,374,100.00
_
_
9,405,000.00
7,236,900.00
296,784,000.00
165,600,000.00
_
28,442,700.00
2,007,720.00
30,096,000.00
74,844,000.00
2,019,600.00
10,395,000.00
5,464,800.00
83,160,000.00
77,220,000.00
25,309,080.00
18,986,400.00
29,700,000.00
1,305,053,100.00
Quantity Unit
4488.00 m3
21120.00 m3
5874.00 m3
19580.00 m3
4749.80 m3
_
_
2200.00 Lin.m
1870.00 m2
1,832.00 Lin.m
_
18590.00 m2
18590.00 m2
3520.00 m3
1980.00 m3
18700.00 m2
13200.00 m2
13200.00 m2
13200.00 m2
13200.00 m2
1832.00 Lin.m
1172.00 m2
2200.00 m2
Amount
122,400,000.00
41,198,330.40
27,295,200.00
190,893,530.40