You are on page 1of 1

EL-Minieh Region Potable Water Supply PROJECT

Hammoud Establishment for trading & contracting


Pending
Material Approval Request DAHNT Action DAHNT Action
No. Date Subject Supplier BOQ Status Date Comments No. Date Subject Supplier Status Date Comments

submit of bill of laddings of the covers prior


shipment on site
-Technical specifications should be submitted inspection out came of the covers on site by
-one sampole should be provided to the Eng
istikamet casting the engineer
001 3/12/2018 Manhole cover Global Casting Resubmit 6/12/2018 -The Eng will select a sample from the stock for load test , in 1.1 13/2/2019 Manhole cover Approved as noted 14/2/2019
alocal laboratory
Jean claude yared test loading of a sample to be selected by the
-submit bill of loding and packing list of availble stock engineer on site prior to any use of these
covers. Testing should be made in a
laboratory approved by the engineer

Genenre
002 3/12/2018 Water meter Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Piere hayek
Genenre
003 3/12/2018 Y strainer Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Piere hayek

contractor to submit compliance sheet


Pressure regulating CSA
4.1 14/5/2019 valve Hydropro
Resubmit 16/5/2019 between specs and proposed material
characteristics
Genenre
004 3/12/2018 Pressure regulating valve Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Piere hayek
Pressure regulating CSA
4.2 3/6/2019 valve Hydropro
Approved as noted 7/6/2019 this submittal is approved for series VRCD only and conditional to satisfy our comments presented on the attached sheet

Genenre
005 3/12/2018 check valve Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Piere hayek
Genenre
006 3/12/2018 stop valve Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Piere hayek

contractor to submit compliance sheet


between specs and proposed material
Metalska industrijia characteristics
7.1 14/5/2019 Butterfly valve varazdin Resubmit 16/5/2019 knowing that butterfly valve for diameters
Hydropro less or equal to 100mm should be concentric
double flanged with gear box , large
diameters should be double eccentric

Genenre
007 3/12/2018 Butterfly valve Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Piere hayek
Most of the column (offered) in the
compliance sheet is copied from the
technical requirements and do not reflect the
Metalska industrijia material specifications Review and
7.2 3/6/2019 Butterfly valve varazdin Resubmit 7/6/2019 Resubmit
Hydropro Reminder Butterfly valves for diameters less
or equal to 100 mm should be concentric
double flanged with gear box , large
diameters should be double eccentric

product conformity certificate should be:


-for DI valves
Chizou sun rising
8.1 14/3/2019 Gate valve
Hydropro
Resubmit 14/3/25019 -should confirm that valves are produced
and tested according to the required
norms(CE directive is not the required norm)

Metalska industrijia contractor to submit compliance sheet


Genenre 8.2 14/5/2019 Gate valve varazdin Resubmit 16/5/2019 between specs and proposed material
008 3/12/2018 Gate valve Resubmit 4/12/2018 Plz refer to our comments on the attached sheet Hydropro characteristics
Piere hayek

Most of the column (offered) in the


Metalska industrijia compliance sheet is copied from the
8.3 3/6/2019 Gate valve varazdin Resubmit 7/6/2019 technical requirements and do not reflect the
Hydropro material specifications Review and
Resubmit with necessary justifications

Genenre
009 3/12/2018 Ball valve Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Piere hayek

contractor replied only to our request of the


Piere hayek comments given in the previous revisions
10.1 12/12/2018 Ductile iron pipe Electrotherm
Resubmit 14/12/2018
kindly resubmit, referring and replying to all the
comments previously given.

again the contractor is not replying to the previous


Piere hayek
10.2 18/12/2018 Ductile iron pipe Electrotherm
Resubmit 19/12/2018 requests of rev0 contractor is instructed to answer all
the requests or to change the supplier

Piere hayek
10.3 13/2/2019 Ductile iron pipe Electrotherm
Resubmit 15/2/2019 Plz refer to our comments on the attached sheet

Piere hayek
010 3/12/2018 Ductile iron pipe Resubmit 4/12/2018 Plz refer to our comments on the attached sheet
Electrotherm

Piere hayek
10.4 18/2/2019 Ductile iron pipe Electrotherm
Approved as noted 19/2/2019 this approval is conditional to fullfill our comments presented on the attached sheet-final approval will not be give it the attached comments have not been applied and requested. The contractor will remain the only responsible of the results of not applying this attached procedurethis conditional approval is lim

Although the supplier is approved, the


selected lining is not conform to the
requirement of the technical specs
since you submitted the first time DI pipe
with the required lining but you shipped on
Jindal Saw site another material and now you are
10.5 21/5/2019 Ductile iron pipe Hydropro
Resubmit 21/5/2019
submitting a material with the same non-
conforming , you are held the only
responsible for the delay you are causing for
the project

the submitted cocern the fiitiings and not


pipes therefore, it should be submitted under
Approved as
011 13/2/2019 HDPE PIPES Haykal plast
noted
14/2/2019 Plz refer to our comments on the attached sheet 11.1 19/2/2019 HDPE PIPES Haykal plast Resubmit 21/2/2019 a new number and not as a revision
contractor to define the selected fittings
types to be used in the project
Approved as
012 19/2/2019 Asphalt mix design Ghazzawi & Taleb 4/3/2019 Plz refer to our comments on the attached sheet
noted/Rejected
Mohammad Alouch- Aggregate base brisa mohammad
013 19/2/2019 Aggregate base course Rejected 1/3/2019 Plz refer to our comments on the attached sheet 13.1 15/4/2019 Approved as noted 2/5/2019 Plz refer to our comments on the attached sheet
Danieh course al torek
type D must be B20 and not B15, to modify as per Cement type PA-L vras 42.5 to be used for
Approved as article 3-2-A-4-2 encasement of pipes and manholes
014 26/2/2019 concrete mix design Betomix
noted/Resubmit
26/3/2019 14.1 10/4/2019 concrete mix design Betomix Approved as noted 11/4/2019
Submit datasheet for type of cement adopted cement type P42,5 RMS BTNA tobe used
submit data sheet admixture for hydraulic structures
Fundiciones y
Ductile Iron fittings for the contractor shall submit product conformity
015 14/3/2019 accesors Resubmit 22/3/2019
HDPE pipes
Hydropro certificates for the selected fittings and accessories

piere hayek
16.1 22/3/2019 shanxi solid Rejected 27/3/2019 approval is given to another supplier
industrial
Sandstein industries
016 14/3/2019 Ductile iron fittings
CO
Resubmit 14/3/2019 product conformity certificates shoule be submitted Ductile iron fittings
Hydropro
16.2 25/3/2019 jindal saw ltd
Approved as noted 27/3/2019 The submitted material is approved on condition to satisfy the required comments shown on the attached sheet

The connection between pipes shall be achieved


using but fusion welding or electro fusion fittings
HAYKAL PLAST
017 25/3/2019 fittings for HDPE pipes POLIEXT CSOVEK
Approved as
28/3/2019
the use of compression fittings shall be in
noted according with the approved shop drawings
kft
the contractor shall submit separatly the fittings
intended to be used and the corresponding usage

resubmit taking into consideration the following:


provide manufacturer profile including list of
projects
provide products conformity certificates
provide technical data sheet and location of use for
Saab construction
018 15/4/2019 Sab concrete repair Resubmit 30/4/2019 (saab white pu)
chemicals
provide certificate showing that the product to be
used inside water tanks is suitable for potable
water use, in addition to missing data
(elongation, ...)

Approved as
019 15/4/2019 Sand bedding Al sfiree-Bleit noted 2/5/2019 Plz refer to our comments on the attached sheet

plz clarify :
How the proposed material is fitted with a
stilling chamber, auxiliary float valve and
CSA contractor to submit compliance sheet between CSA
020 14/5/2019 Float valve Resubmit 16/5/2019 20.1 3/6/2019 Float valve Resubmit 7/6/2019 regulating valve,
Hydropro specs and proposed material characteristics Hydropro
are you proposing to install a pressure
reducing valve (VRCD) with each float
valve

contractor to submit compliance sheet between


specs and proposed material characteristics
knowing that:
-triple function should be used for pumping and
CSA
021 17/5/2019 Air release valve Resubmit 17/5/2019 transmission lines
Hydropro
-for distribution networks, single air valve should
be used
-for pipes diameters ≤4" and triple function for
pipe diameters>4"

022
023

You might also like