Rencana Anggaran Biaya Proyek Jalan 24 KM Amp 58 KM Awang Bangkal Item Pekerjaan Satuan Harga Satuan Material
Rencana Anggaran Biaya Proyek Jalan 24 KM Amp 58 KM Awang Bangkal Item Pekerjaan Satuan Harga Satuan Material
24 km amp
58 km awang bangkal
MATERIAL
LPB Ton 87,500.00 471.25
ANGKUTAN
Angkutan LPB Ton 58,000.00 471.25
BIAYA PENYIRAMAN
Penyiraman Ls 1,000,000.00 1.00
SEWA ALAT
Motor Grader Jam 252,500.00 49.00
Combination Roller Jam 162,500.00 49.00
MOBILISASI ALAT
Motor Grader LS 1,000,000.00 2.00
Combination Roller LS 1,000,000.00 2.00
Total
Jumlah Harga
41,234,648.44
27,332,681.25
1,000,000.00
12,372,500.00
7,962,500.00
2,000,000.00
2,000,000.00
93,902,329.69
Back Up Timbunan LPB
Total 208.75
rekap hasil survey elevasi
0.26