Material list

Work Materilas
No Work Item unit Work Description Materials Unit
Quantity Quantity

Cement Quntal 40.50


Sand m3 5.76
2 Concrete m3 30 Lean concrete
Aggregate (02) m3 20.16
Water lit 4,860.00
Cement Quntal 206.80
Sand m3 35.73
m3 590.85 Massonary
Water lit 12,407.85
Stone m3 679.48
3 Masoanary
Cement Quntal 55.65
Sand m3 9.62
m2 1590 Lastera bed
Lastera stone m3 304.00
Water lit 2,226.00
Cement Quntal 11.34
Sand m3 1.45
m3 3.15 Concrete
Aggregate (02) m3 5.08
4 Culvert Water lit 680.40
kg 234.78 Dia 16 Berga 370.95
kg 131.96 dia 12 Berga 117.44
Re-bar/Reinforcement
kg 468.92 dia 10 Berga 290.73
Balck wire kg 2.00
Total sum
the quantification is done with formula in the Excel
Current Total Current
market price Amount

600 24,300.00
800 4,608.00
2600 52,416.00
0.2 972.00
600 124,078.50
16 571.75
0.2 2,481.57 135.36
1000 679,477.50
600 33,390.00
800 7,693.06
600 182,400.00
0.2 445.20
600 6,804.00
800 1,161.22
2000 10,160.64
0.2 136.08
2500 927,381.00 37330.02 100.63
1300 152,677.72 20981.64
850 247,120.84 74558.28
170 340.00
2,458,615.08