No. Item pekerjaan Sat Volume Total Inlet 1 Inlet 2 Inlet 3 Inlet 4 Inlet 5 Inlet 6
I Drain Inlet
1 Galian Tanah m3 14,756.81 1,016.37 711.71 259.13 372.16 772.24 756.57
2 Cerucuk Bambu titik 1,836.00 108.00 108.00 108.00 108.00 108.00 108.00
3 Sand Gravel Stone m3 183.60 10.80 10.80 10.80 10.80 10.80 10.80
4 Gabion 2x1x1 m3 1,632.00 96.00 96.00 96.00 96.00 96.00 96.00
5 Concrete Pile titik 3,166.08 429.68 133.28 178.96 140.80 196.08 164.16
6 Lean Concrete m3 555.41 65.92 24.93 35.45 26.25 35.78 29.18
7 Concrete K300 m3 762.73 44.36 36.21 36.56 57.38 50.03 35.94
8 Pembesian kg 106,263.32 5,715.62 4,597.62 4,631.56 7,858.95 6,742.94 4,557.81
9 Box Culvert m1 791.52 107.42 33.32 44.74 35.20 49.02 41.04
10 Sluice Gate unit 34.00 2.00 2.00 2.00 2.00 2.00 2.00
11 Valve Gate unit 34.00 2.00 2.00 2.00 2.00 2.00 2.00
II Tampungan -
1 Galian Tanah m3 404,564.78 1,741.49 1,103.62 60,649.71 17,240.45 46,265.24 1,727.68
2 Back Fill m3 12,237.27 522.45 44.47 1,962.71 820.01 1,224.77 134.63
3 Timbunan & Pemadatan m3 20,210.27 197.37 11,032.38 531.61 695.14 365.72
4 Sand 10cm m3 1,100.81 8.77 8.77 182.37 78.01 114.98 8.77
5 Stone Pitching Size 20cm-30cm m3 5,504.06 43.87 43.87 911.85 390.07 574.89 43.87
6 Stone Masonry 1:2:3 m3 42,490.44 354.45 354.45 7,367.72 3,151.76 4,645.11 354.45
7 Wheep Hole Ø 1 1/2" Distance 1,5m titik 4,050,433.71 1,388.77 1,388.77 2,142,184.15 94,030.44 227,847.33 1,388.77
8 Plestering Finishing Cement 1:3 m2 10,633.84 84.75 84.75 1,761.69 753.61 1,110.69 84.75
9 Concrete K175 (Pagar) m3 1,129.83 8.05 8.05 255.42 56.04 81.50 8.05
10 Pagar BRC m1 272,633.05 1,941.71 1,941.71 61,634.33 13,522.40 19,665.87 1,941.71
III Jalan Inspeksi Tampungan -
1 Sand m3 3,285.94 741.84 176.96 257.36
2 Stone Pitching Size 20cm-30cm m3 8,762.50 1,978.25 471.90 686.30
3 Base Coarse m3 1,095.31 247.28 58.99 85.79
Kesimpulan
Item pekerjaan Satuan Volume Total Inlet 1 Inlet 2 Inlet 3 Inlet 4 Inlet 5 Inlet 6
Tampungan
Galian Tanah m3 325,062.00 90,894.00 13,484.00 25,809.00
Back Fill m3 9,605.20 2,017.40 928.40 1,282.60
Timbunan & Pemadatan m3 77,270.00 18,340.00 4,220.00 5,830.00
Sand 10cm m3 972.10 183.40 84.40 116.60
Stone Pitching Size 20cm-30cm m3 4,860.50 917.00 422.00 583.00
Stone Masonry 1:2:3 m3 41,013.58 7,336.00 3,722.04 5,142.06
Wheep Hole Ø 1 1/2" Distance 1,5m titik 14,581.50 2,751.00 1,266.00 1,749.00
Plestering Finishing Cement 1:3 m2 9,721.00 1,834.00 844.00 1,166.00
Concrete K175 (Pagar) m3 772.70 183.40 42.20 58.30
Pagar BRC m1 15,454.00 3,668.00 844.00 1,166.00
Jalan Inspeksi Tampungan - - - -
Sand m3 3,477.15 825.30 189.90 262.35
Stone Pitching Size 20cm-30cm m3 6,954.30 1,650.60 379.80 524.70
Base Coarse m3 2,318.10 550.20 126.60 174.90
REKAPITULASI VOLUME DRAIN INLET
No. Item pekerjaan Sat Inlet 7 Inlet 8 Inlet 9 Inlet 10 Inlet 11 Inlet 12 Inlet 13
I Drain Inlet
1 Galian Tanah m3 704.17 1,094.31 1,358.30 1,194.09 916.01 857.35 922.51
2 Cerucuk Bambu titik 108.00 108.00 108.00 108.00 108.00 108.00 108.00
3 Sand Gravel Stone m3 10.80 10.80 10.80 10.80 10.80 10.80 10.80
4 Gabion 2x1x1 m3 96.00 96.00 96.00 96.00 96.00 96.00 96.00
5 Concrete Pile titik 156.32 184.00 277.12 137.76 168.56 159.28 192.80
6 Lean Concrete m3 28.25 31.95 44.79 25.62 29.85 28.63 33.22
7 Concrete K300 m3 50.47 50.93 48.86 49.06 43.29 43.51 43.39
8 Pembesian kg 7,092.21 7,106.61 6,980.06 6,856.01 6,306.31 6,364.12 6,349.36
9 Box Culvert m1 39.08 46.00 69.28 34.44 42.14 39.82 48.20
10 Sluice Gate unit 2.00 2.00 2.00 2.00 2.00 2.00 2.00
11 Valve Gate unit 2.00 2.00 2.00 2.00 2.00 2.00 2.00
II Tampungan
1 Galian Tanah m3 20,855.63 27,669.66 1,156.25 10,574.23 26,789.97 19,383.05 65,627.85
2 Back Fill m3 2,249.17 670.00 362.61 359.50 660.07 358.59 724.15
3 Timbunan & Pemadatan m3 1,377.42 874.50 345.35 214.56 844.10 459.44 927.17
4 Sand 10cm m3 208.53 64.31 36.24 34.39 61.84 34.31 67.70
5 Stone Pitching Size 20cm-30cm m3 1,042.65 321.57 181.21 171.97 309.22 171.56 338.48
6 Stone Masonry 1:2:3 m3 7,473.72 2,598.29 1,464.18 1,232.71 2,498.49 1,386.19 2,734.90
7 Wheep Hole Ø 1 1/2" Distance 1,5m titik 703,557.14 128,800.10 25,839.42 19,025.58 121,289.23 35,915.78 145,956.40
8 Plestering Finishing Cement 1:3 m2 2,014.40 621.27 350.10 332.25 597.41 331.45 653.94
9 Concrete K175 (Pagar) m3 145.12 87.19 47.19 46.78 85.90 46.67 94.24
10 Pagar BRC m1 35,017.60 21,039.86 11,387.03 11,289.41 20,727.98 11,260.83 22,740.22
III Jalan Inspeksi Tampungan
1 Sand m3 458.27 275.34 149.02 73.98 271.26 147.37 297.59
2 Stone Pitching Size 20cm-30cm m3 1,222.04 734.25 397.38 197.29 723.36 392.98 793.59
3 Base Coarse m3 152.76 91.78 49.67 24.66 90.42 49.12 99.20
Kesimpulan
Item pekerjaan Satuan Inlet 7 Inlet 8 Inlet 9 Inlet 10 Inlet 11 Inlet 12 Inlet 13
Tampungan
Galian Tanah m3 16,125.50 26,592.50 7,017.50 4,371.00 18,803.00 14,769.50 46,012.00
Back Fill m3 1,189.10 709.50 442.20 249.70 735.90 424.60 787.60
Timbunan & Pemadatan m3 10,810.00 6,450.00 4,020.00 2,270.00 6,690.00 3,860.00 7,160.00
Sand 10cm m3 108.10 64.50 40.20 45.40 66.90 38.60 71.60
Stone Pitching Size 20cm-30cm m3 540.50 322.50 201.00 227.00 334.50 193.00 358.00
Stone Masonry 1:2:3 m3 4,324.00 2,580.00 1,608.00 2,115.64 2,676.00 1,544.00 2,864.00
Wheep Hole Ø 1 1/2" Distance 1,5m titik 1,621.50 967.50 603.00 681.00 1,003.50 579.00 1,074.00
Plestering Finishing Cement 1:3 m2 1,081.00 645.00 402.00 454.00 669.00 386.00 716.00
Concrete K175 (Pagar) m3 108.10 64.50 40.20 22.70 66.90 38.60 71.60
Pagar BRC m1 2,162.00 1,290.00 804.00 454.00 1,338.00 772.00 1,432.00
Jalan Inspeksi Tampungan - - - - - - -
Sand m3 486.45 290.25 180.90 102.15 301.05 173.70 322.20
Stone Pitching Size 20cm-30cm m3 972.90 580.50 361.80 204.30 602.10 347.40 644.40
Base Coarse m3 324.30 193.50 120.60 68.10 200.70 115.80 214.80
REKAPITULASI VOLUME DRAIN INLET
Kesimpulan
Item pekerjaan Satuan Inlet 14 Inlet 15 Inlet 16 Inlet 17 Inlet 18
Tampungan
Galian Tanah m3 61,184.00
Back Fill m3 838.20
Timbunan & Pemadatan m3 7,620.00
Sand 10cm m3 152.40
Stone Pitching Size 20cm-30cm m3 762.00
Stone Masonry 1:2:3 m3 7,101.84
Wheep Hole Ø 1 1/2" Distance 1,5m titik 2,286.00
Plestering Finishing Cement 1:3 m2 1,524.00
Concrete K175 (Pagar) m3 76.20
Pagar BRC m1 1,524.00
Jalan Inspeksi Tampungan -
Sand m3 342.90
Stone Pitching Size 20cm-30cm m3 685.80
Base Coarse m3 228.60
Drain 3 Kitarung
Elevasi Luas Panjang Volume
18.00 7,206.00 22,803.00
17.00 38,400.00 43,645.50
16.00 48,891.00 24,445.50
90,894.00
Back Fill 1.10 1,834.00 2,017.40
Timbunan 10.00 1,834.00 18,340.00
Sand 10cm 0.10 1,834.00 183.40
Stone Pitching 0.50 1,834.00 917.00
Masonry 4.00 1,834.00 7,336.00
Wheep Hole 1.50 1,834.00 2,751.00
Plestering 1.00 1,834.00 1,834.00
Concrete K175 0.10 1,834.00 183.40
Pagar BRC 2.00 1,834.00 3,668.00
Drain 4 Cilangkap
Elevasi Luas Panjang Volume
21.00 236.00 638.00
20.00 1,040.00 1,486.50
19.00 1,933.00 2,296.50
18.00 2,660.00 3,054.00
17.00 3,448.00 3,866.50
16.00 4,285.00 2,142.50
13,484.00
Back Fill 2.20 422.00 928.40
Timbunan 10.00 422.00 4,220.00
Sand 10cm 0.20 422.00 84.40
Stone Pitching 1.00 422.00 422.00
Masonry 8.82 422.00 3,722.04
Wheep Hole 3.00 422.00 1,266.00
Plestering 2.00 422.00 844.00
Concrete K175 0.10 422.00 42.20
Pagar BRC 2.00 422.00 844.00
25,809.00
Back Fill 2.20 583.00 1,282.60
Timbunan 10.00 583.00 5,830.00
Sand 10cm 0.20 583.00 116.60
Stone Pitching 1.00 583.00 583.00
Masonry 8.82 583.00 5,142.06
Wheep Hole 3.00 583.00 1,749.00
Plestering 2.00 583.00 1,166.00
Concrete K175 0.10 583.00 58.30
Pagar BRC 2.00 583.00 1,166.00
16,125.50
Back Fill 1.10 1,081.00 1,189.10
Timbunan 10.00 1,081.00 10,810.00
Sand 10cm 0.10 1,081.00 108.10
Stone Pitching 0.50 1,081.00 540.50
Masonry 4.00 1,081.00 4,324.00
Wheep Hole 1.50 1,081.00 1,621.50
Plestering 1.00 1,081.00 1,081.00
Concrete K175 0.10 1,081.00 108.10
Pagar BRC 2.00 1,081.00 2,162.00
Sand 0.45 1,081.00 486.45
Stone Pitching 0.9 1,081.00 972.90
Base Coarse 0.3 1,081.00 324.30
Drain 8 Cibadak
Elevasi Luas Panjang Volume
18.00 1,181.00 3,768.00
17.00 6,355.00 13,001.00
16.00 19,647.00 9,823.50
26,592.50
Back Fill 1.10 645.00 709.50
Timbunan 10.00 645.00 6,450.00
Sand 10cm 0.10 645.00 64.50
Stone Pitching 0.50 645.00 322.50
Masonry 4.00 645.00 2,580.00
Wheep Hole 1.50 645.00 967.50
Plestering 1.00 645.00 645.00
Concrete K175 0.10 645.00 64.50
Pagar BRC 2.00 645.00 1,290.00
Drain 9 Babakan
Elevasi Luas Panjang Volume
17.00 1,619.00 2,161.50
16.00 2,704.00 3,104.00
15.00 3,504.00 1,752.00
7,017.50
Back Fill 1.10 402.00 442.20
Timbunan 10.00 402.00 4,020.00
Sand 10cm 0.10 402.00 40.20
Stone Pitching 0.50 402.00 201.00
Masonry 4.00 402.00 1,608.00
Wheep Hole 1.50 402.00 603.00
Plestering 1.00 402.00 402.00
Concrete K175 0.10 402.00 40.20
Pagar BRC 2.00 402.00 804.00
Sand 0.45 402.00 180.90
Stone Pitching 0.9 402.00 361.80
Base Coarse 0.3 402.00 120.60
4,371.00
Back Fill 1.10 227.00 249.70
Timbunan 10.00 227.00 2,270.00
Sand 10cm 0.20 227.00 45.40
Stone Pitching 1.00 227.00 227.00
Masonry 9.32 227.00 2,115.64
Wheep Hole 3.00 227.00 681.00
Plestering 2.00 227.00 454.00
Concrete K175 0.10 227.00 22.70
Pagar BRC 2.00 227.00 454.00
Drain 11 Bojongcae
Elevasi Luas Panjang Volume
18.00 334.00 675.50
17.00 1,017.00 9,318.00
16.00 17,619.00 8,809.50
18,803.00
Back Fill 1.10 669.00 735.90
Timbunan 10.00 669.00 6,690.00
Sand 10cm 0.10 669.00 66.90
Stone Pitching 0.50 669.00 334.50
Masonry 4.00 669.00 2,676.00
Wheep Hole 1.50 669.00 1,003.50
Plestering 1.00 669.00 669.00
Concrete K175 0.10 669.00 66.90
Pagar BRC 2.00 669.00 1,338.00
Sand 0.45 669.00 301.05
Stone Pitching 0.9 669.00 602.10
Base Coarse 0.3 669.00 200.70
Drain 12 Pabuaran
Elevasi Luas Panjang Volume
15.00 2,123.00 4,488.50
14.00 6,854.00 6,854.00
13.00 6,854.00 3,427.00
14,769.50
Back Fill 1.10 386.00 424.60
Timbunan 10.00 386.00 3,860.00
Sand 10cm 0.10 386.00 38.60
Stone Pitching 0.50 386.00 193.00
Masonry 4.00 386.00 1,544.00
Wheep Hole 1.50 386.00 579.00
Plestering 1.00 386.00 386.00
Concrete K175 0.10 386.00 38.60
Pagar BRC 2.00 386.00 772.00
Drain 13 Carelang
Elevasi Luas Panjang Volume
15.00 1,858.00 11,927.00
14.00 21,996.00 22,541.50
13.00 23,087.00 11,543.50
46,012.00
Back Fill 1.10 716.00 787.60
Timbunan 10.00 716.00 7,160.00
Sand 10cm 0.10 716.00 71.60
Stone Pitching 0.50 716.00 358.00
Masonry 4.00 716.00 2,864.00
Wheep Hole 1.50 716.00 1,074.00
Plestering 1.00 716.00 716.00
Concrete K175 0.10 716.00 71.60
Pagar BRC 2.00 716.00 1,432.00
Sand 0.45 716.00 322.20
Stone Pitching 0.9 716.00 644.40
Base Coarse 0.3 716.00 214.80
61,184.00
Back Fill 1.10 762.00 838.20
Timbunan 10.00 762.00 7,620.00
Sand 10cm 0.20 762.00 152.40
Stone Pitching 1.00 762.00 762.00
Masonry 9.32 762.00 7,101.84
Wheep Hole 3.00 762.00 2,286.00
Plestering 2.00 762.00 1,524.00
Concrete K175 0.10 762.00 76.20
Pagar BRC 2.00 762.00 1,524.00
DRAIN INLET
Box Culvert m' 107.42
Panjang Jumlah Volume
m' m'
53.71 2.00 107.42
Concrete m³ 44.36
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 0.99 4.90 4.87
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 1016.37
Area Panjang Volume
m² m' m³
Box culvert 8.19 53.71 439.88
Sluice gate 4.16 6.00 24.95
Valve Gate 91.92 6.00 551.53
Pintu
Sluice Gate 2
Valve Gate 2
INLET 1 CIKATAPIS CIBERANG (LEFT STA. 0+000)
TAMPUNGAN
Galian m³ 1741.49
Area Panjang Volume
m² m' m³
29.75 25.50 758.57
96.36 10.20 982.91
sand m³ 8.77
Area Panjang sisi Volume
m² m' m³
0.10 28.23 2.00 5.65
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 33.32
Panjang Jumlah Volume
m' m'
16.66 2.00 33.32
Concrete m³ 36.21
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 0.99 4.90 4.87
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 711.71
Area Panjang Volume
m² m' m³
Box culvert 8.19 16.66 136.45
Sluice gate 6.42 6.00 38.52
Valve Gate 89.46 6.00 536.74
Pintu
Sluice Gate 2
Valve Gate 2
INLET 2 CIUJUNG BARAT (RIGHT STA. 0+300)
TAMPUNGAN
Galian m³ 1103.62
Area Panjang Volume
m² m' m³
5.81 25.50 148.23
63.17 15.13 955.38
sand m³ 8.77
Area Panjang sisi Volume
m² m' m³
0.10 28.23 2.00 5.65
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 44.74
Panjang Jumlah Volume
m' m'
22.37 2.00 44.74
Concrete m³ 36.56
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 0.99 4.90 4.87
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 259.13
Area Panjang Volume
m² m' m³
Box culvert 8.19 22.37 183.21
Sluice gate 8.63 2.50 21.57
Valve Gate 9.06 6.00 54.35
Pintu
Sluice Gate 2
Valve Gate 2
INLET 3 KITARUNG (RIGHT STA. 0+800)
TAMPUNGAN
Galian m³ 60649.71
Area Tinggi Volume
m² m' m³
29999.61 2.00 59999.22
108.42 6.00 650.49
sand m³ 182.37
Area Panjang sisi Volume
m² m' m³
0.10 1792.43 179.24
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 35.20
Panjang Jumlah Volume
m' m'
17.60 2.00 35.20
Concrete m³ 57.38
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 372.16
Area Panjang Volume
m² m' m³
Box culvert 8.19 17.60 144.14
Sluice gate 5.50 7.84 43.12
Valve Gate 16.70 11.07 184.89
Pintu
Sluice Gate 2
Valve Gate 2
INLET 4 CILANGKAP (RIGHT STA. 0+400)
TAMPUNGAN
Galian m³ 17240.45
Area Tinggi Volume
m² m' m³
90.75 187.22 16990.76
22.56 11.07 249.69
sand m³ 78.01
Area Panjang Volume
m² m' m³
0.10 196.11 19.61
0.10 178.15 17.82
0.10 177.46 17.75
0.10 197.15 19.71
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 49.02
Panjang Jumlah Volume
m' m'
24.51 2.00 49.02
Concrete m³ 50.03
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 772.24
Area Panjang Volume
m² m' m³
Box culvert 8.19 24.51 200.74
Sluice gate 37.84 6.00 227.05
Valve Gate 57.41 6.00 344.46
Pintu
Sluice Gate 2
Valve Gate 2
INLET 5 KADUAGUNG TIMUR (LEFT STA. 1+450)
TAMPUNGAN
Galian m³ 46265.24
Area Tinggi Volume
m² m' m³
7710.87 6.00 46265.24
sand m³ 114.98
Area Panjang Volume
m² m' m³
0.10 193.73 19.37
0.10 197.38 19.74
0.10 352.87 35.29
0.10 374.54 37.45
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 41.04
Panjang Jumlah Volume
m' m'
20.52 2.00 41.04
Concrete m³ 35.94
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 0.99 4.90 4.87
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 756.57
Area Panjang Volume
m² m' m³
Box culvert 8.19 20.52 168.06
Sluice gate 8.63 6.00 51.77
Valve Gate 89.46 6.00 536.74
Pintu
Sluice Gate 2
Valve Gate 2
INLET 6 JL. SUNAN KALIJAGA (RIGHT STA. 2+600)
TAMPUNGAN
Galian m³ 1727.68
Area Panjang Volume
m² m' m³
17.60 25.50 448.77
84.56 15.13 1278.91
sand m³ 8.77
Area Panjang sisi Volume
m² m' m³
0.10 28.23 2.00 5.65
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 39.08
Panjang Jumlah Volume
m' m'
19.54 2.00 39.08
Concrete m³ 50.47
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 704.17
Area Panjang Volume
m² m' m³
Box culvert 8.19 19.54 160.03
Sluice gate 20.31 6.00 121.84
Valve Gate 70.38 6.00 422.29
Pintu
Sluice Gate 2
Valve Gate 2
INLET 7 ROYAL SOETA (RIGHT STA. 3+500)
TAMPUNGAN
Galian m³ 20855.63
Area Panjang Volume
m² m' m³
20.31 1027.02 20855.63
sand m³ 208.53
Area Panjang Volume
m² m' m³
0.10 515.88 51.59
0.10 508.70 50.87
0.10 519.79 51.98
0.10 509.67 50.97
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 46.00
Panjang Jumlah Volume
m' m'
23.00 2.00 46.00
Concrete m³ 50.93
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 1094.31
Area Panjang Volume
m² m' m³
Box culvert 8.19 23.00 188.37
Sluice gate 20.31 6.00 121.84
Valve Gate 130.68 6.00 784.10
Pintu
Sluice Gate 2
Valve Gate 2
INLET 8 CIBADAK (LEFT STA. 4+300)
TAMPUNGAN
Galian m³ 27669.66
Area tinggi Volume
m² m' m³
9223.22 3.00 27669.66
sand m³ 64.31
Area Panjang Volume
m² m' m³
0.10 358.46 35.85
0.10 253.42 25.34
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 69.28
Panjang Jumlah Volume
m' m'
34.64 2.00 69.28
Concrete m³ 48.86
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 1358.30
Area Panjang Volume
m² m' m³
Box culvert 8.19 34.64 283.70
Sluice gate 34.40 6.00 206.38
Valve Gate 144.70 6.00 868.22
Pintu
Sluice Gate 2
Valve Gate 2
INLET 9 BABAKAN (LEFT STA. 5+000)
TAMPUNGAN
Galian m³ 1156.25
Area tinggi Volume
m² m' m³
385.42 3.00 1156.25
sand m³ 36.24
Area Panjang Volume
m² m' m³
0.10 128.31 12.83
0.10 126.26 12.63
0.10 76.58 7.66
0.10 15.63 2.00 3.13
DRAIN INLET
Box Culvert m' 34.44
Panjang Jumlah Volume
m' m'
17.22 2.00 34.44
Concrete m³ 49.06
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 1194.09
Area Panjang Volume
m² m' m³
Box culvert 8.19 17.22 141.03
Sluice gate 38.47 6.00 230.84
Valve Gate 137.04 6.00 822.22
Pintu
Sluice Gate 2
Valve Gate 2
INLET 10 KUNCORO JAKTI (RIGHT STA. 6+800)
TAMPUNGAN
Galian m³ 10574.23
Area tinggi Volume
m² m' m³
2114.85 5.00 10574.23
sand m³ 34.39
Area Panjang Volume
m² m' m³
0.10 64.60 6.46
0.10 62.92 6.29
0.10 99.31 9.93
0.10 101.49 10.15
0.10 15.63 2.00 1.56
DRAIN INLET
Box Culvert m' 42.14
Panjang Jumlah Volume
m' m'
21.07 2.00 42.14
Concrete m³ 43.29
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 916.01
Area Panjang Volume
m² m' m³
Box culvert 8.19 21.07 172.56
Sluice gate 23.85 6.00 143.09
Valve Gate 100.06 6.00 600.36
Pintu
Sluice Gate 2
Valve Gate 2
INLET 11 BOJONGCAE (LEFT STA. 7+600)
TAMPUNGAN
Galian m³ 26789.97
Area tinggi Volume
m² m' m³
8929.99 3.00 26789.97
sand m³ 61.84
Area Panjang Volume
m² m' m³
0.10 302.76 30.28
0.10 300.04 30.00
0.10 15.63 2.00 1.56
DRAIN INLET
Box Culvert m' 39.82
Panjang Jumlah Volume
m' m'
19.91 2.00 39.82
Concrete m³ 43.51
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 857.35
Area Panjang Volume
m² m' m³
Box culvert 8.19 19.91 163.06
Sluice gate 23.85 6.00 143.09
Valve Gate 91.87 6.00 551.20
Pintu
Sluice Gate 2
Valve Gate 2
INLET 12 PABUARAN (RIGHT STA. 8+100)
TAMPUNGAN
Galian m³ 19383.05
Area tinggi Volume
m² m' m³
6461.02 3.00 19383.05
sand m³ 34.31
Area Panjang Volume
m² m' m³
0.10 165.57 16.56
0.10 161.91 16.19
0.10 15.63 2.00 1.56
DRAIN INLET
Box Culvert m' 48.20
Panjang Jumlah Volume
m' m'
24.10 2.00 48.20
Concrete m³ 43.39
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 922.51
Area Panjang Volume
m² m' m³
Box culvert 8.19 24.10 197.38
Sluice gate 31.69 6.00 190.15
Valve Gate 89.16 6.00 534.99
Pintu
Sluice Gate 2
Valve Gate 2
INLET 13 KP. CARELANG (RIGHT STA. 9+700)
TAMPUNGAN
Galian m³ 65627.85
Area tinggi Volume
m² m' m³
21875.95 3.00 65627.85
sand m³ 67.70
Area Panjang Volume
m² m' m³
0.10 333.56 33.36
0.10 327.76 32.78
0.10 15.63 2.00 1.56
DRAIN INLET
Box Culvert m' 41.78
Panjang Jumlah Volume
m' m'
20.89 2.00 41.78
Concrete m³ 43.32
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 1323.14
Area Panjang Volume
m² m' m³
Box culvert 8.19 20.89 171.09
Sluice gate 31.69 6.00 190.15
Valve Gate 160.32 6.00 961.91
Pintu
Sluice Gate 2.00
Valve Gate 2.00
INLET 14 BOJONG PANDAN (LEFT STA. 10+700)
TAMPUNGAN
Galian m³ 92036.04
Area tinggi Volume
m² m' m³
18407.21 5.00 92036.04
sand m³ 145.15
Area Panjang Volume
m² m' m³
0.10 282.66 28.27
0.10 289.22 28.92
0.10 429.55 42.95
0.10 434.47 43.45
0.10 15.63 2.00 1.56
TAMPUNGAN
Galian m³ 8331.64
Area Panjang Volume
m² m' m³
22.07 377.53 8331.64
sand m³ 24.73
Area Panjang Volume
m² m' m³
0.10 247.27 24.73
DRAIN INLET
Box Culvert m' 27.74
Panjang Jumlah Volume
m' m'
13.87 2.00 27.74
Concrete m³ 43.14
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 1084.76
Area Panjang Volume
m² m' m³
Box culvert 8.19 13.87 113.60
Sluice gate 22.28 6.00 133.67
Valve Gate 139.58 6.00 837.49
Pintu
Sluice Gate 2.00
Valve Gate 2.00
INLET 16 DESA SANGIANG (RIGHT STA. 16+800)
TAMPUNGAN
Galian m³ 1137.42
Area tinggi Volume
m² m' m³
379.14 3.00 1137.42
sand m³ 7.31
Area Panjang Volume
m² m' m³
0.10 24.89 2.00 4.98
0.10 11.64 2.00 2.33
DRAIN INLET
Box Culvert m' 34.22
Panjang Jumlah Volume
m' m'
17.11 2.00 34.22
Concrete m³ 43.14
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 780.54
Area Panjang Volume
m² m' m³
Box culvert 8.19 17.11 140.13
Sluice gate 22.28 6.00 133.67
Valve Gate 84.46 6.00 506.73
Pintu
Sluice Gate 2.00
Valve Gate 2.00
INLET 17 PAMARAYAN 1 (RIGHT STA. 18+500)
TAMPUNGAN
Galian m³ 1137.42
Area tinggi Volume
m² m' m³
379.14 3.00 1137.42
sand m³ 7.31
Area Panjang Volume
m² m' m³
0.10 24.89 2.00 4.98
0.10 11.64 2.00 2.33
DRAIN INLET
Box Culvert m' 58.08
Panjang Jumlah Volume
m' m'
29.04 2.00 58.08
Concrete m³ 43.14
Sluice gate
Area Panjang Volume
m² m' m³
Lantai 2.49 4.90 12.22
Valve gate
Area Panjang Volume
m² m' m³
Lantai 1.89 4.90 9.28
Valve gate
Panjang titik Panjang 1 Lebar titik Lebar 1 Berat Volume
m' m' m' m' m' m' kg kg/m
Lantai 12.69 24.50 310.86 4.90 63.44 310.86 1.58 982.30
Galian m³ 633.46
Area Panjang Volume
m² m' m³
Box culvert 8.19 29.04 237.84
Sluice gate 22.28 6.00 133.67
Valve Gate 43.66 6.00 261.94
Pintu
Sluice Gate 2.00
Valve Gate 2.00
INLET 18 PAMARAYAN 2 (RIGHT STA. 18+600)
TAMPUNGAN
Galian m³ 1137.42
Area tinggi Volume
m² m' m³
379.14 3.00 1137.42
sand m³ 7.31
Area Panjang Volume
m² m' m³
0.10 24.89 2.00 4.98