DAMVIEW COLLAGE

TOILET BLOCKS
Item Column1 Qty Rate Amount

SUBSTRUCTURE ( PROVISIONAL )

River sand
m3 1 26.00 26.00

Pit sand
m3 4 0.00 0.00
2.2
20 mm Stone aggregate
m³ 10 40.00 400.00

Hardcore
m3 27.75 2.50 69.38

Cement
bags 15 13.00 195.00
42
Termite treatment
litre 20 1.50 30.00

Setting out
m2 50 0.80 40.32

150 Micron black polythene sheeting


( 2 440 mm wide roll)
m 34 2.50 85.00

Load bearing bricks


no 558 0.07 39.06

Blinding
m3 5 0.00 0.00

Grano 40mm
m3 3 26.00 83.20

Brickforce for one brick wall (22 metre rolls) Ref C2


rolls 14 6.00 84.00
Total Material Cost $ 1,051.96
add labor 262.99
Garnd Total 1,314.94