Strous 25cm 0.25 20.36 10 6.00 6.00 0.79 0.20 102.00 75.33 17.79 93.11 94 kg/m3
pondasi 50x50 0.50 0.15 0.59 12 4.00 12.00 0.59 4.00 2.10 2.10 4.19 111.74 kg/m3
pondasi 70x70 0.70 0.15 0.79 12 6.00 12.00 0.79 6.00 4.21 4.21 8.42 114.50 kg/m3
pondasi 150x60x35 1.50 0.35 1.79 13 5.00 - 1.79 5.00 9.32 - 9.32 11.84 kg/m3
0.60 0.35 0.89 13 12.00 - 0.89 12.00 11.13 - 11.13 88.31 kg/m3
pondasi 60x60x35 0.60 0.35 0.89 13 5.00 13.00 0.89 5.00 4.64 4.64 9.27 73.59 kg/m3
sloof 15x20 0.15 0.20 33.33 12 4.00 8.00 0.62 0.15 223.00 118.37 54.55 172.92 173 kg/m3 0.40 4.444
sloof 15x25 0.15 0.25 26.67 12 4.00 8.00 0.72 0.15 178.00 94.69 50.57 145.26 146 kg/m3 0.50 6.667
sloof 20x30 0.20 0.30 16.67 12 6.00 8.00 0.92 0.15 112.00 88.78 40.66 129.43 130 kg/m3 0.60 5.000
sloof 12x15 0.12 0.15 55.56 10 4.00 8.00 0.46 0.15 371.00 137.00 67.34 204.34 205 kg/m3 0.30 5.556
kolom 20x25 0.20 0.25 20.00 12 6.00 8.00 0.82 0.15 134.00 106.53 43.35 149.89 150 kg/m3 0.90 9.000
kolom15x15 0.15 0.15 44.44 12 4.00 8.00 0.52 0.15 297.00 157.82 60.94 218.76 219 kg/m3 0.60 13.333
kolom12x12 0.12 0.12 69.44 12 4.00 8.00 0.40 0.15 463.00 246.60 73.07 319.67 320 kg/m3 0.24 8.333
kolom 30x30 0.30 0.30 11.11 10 6.00 8.00 1.12 0.15 75.00 41.10 33.14 74.24 75 kg/m3 1.20 6.667
kolom 15x25 0.15 0.25 26.67 12 6.00 8.00 0.72 0.15 178.00 142.04 50.57 192.61 193 kg/m3 0.80 10.667
kolom 20x20 0.30 0.30 11.11 10 4.00 8.00 1.12 0.15 75.00 27.40 33.14 60.54 61 kg/m3 1.20 6.667
balok 15x15 0.15 0.15 44.44 12 4.00 8.00 0.52 0.15 297.00 157.82 60.94 218.76 219 kg/m3 0.45 10.000
ring balok 12x15 0.12 0.15 55.56 10 4.00 8.00 0.46 0.15 371.00 137.00 67.34 204.34 205 kg/m3 0.30 5.556
latei balok 12x15 0.12 0.15 55.56 10 4.00 8.00 0.46 0.15 371.00 137.00 67.34 204.34 205 kg/m3 0.42 11.667
balok 20x40 0.20 0.40 12.50 12 6.00 8.00 1.12 0.15 84.00 66.58 37.12 103.70 104 kg/m3 1.00 12.500
balok 20x25 0.20 0.25 20.00 12 6.00 8.00 0.82 0.15 134.00 106.53 43.35 149.89 150 kg/m3 0.46 9.200
balok 15x20 0.15 0.20 33.33 12 6.00 8.00 0.62 0.15 223.00 177.55 54.55 232.10 233 kg/m3 0.55 9.167
balok 30x60 0.30 0.60 5.56 16 12.00 8.00 1.72 0.15 38.00 105.22 25.79 131.00 132 kg/m3 1.26 7.000
0.30 0.60 5.56 13 2.00 11.58 11.58 12 kg/m3
balok 30x40 0.30 0.40 8.33 16 10.00 8.00 1.32 0.15 56.00 131.52 29.17 160.69 161 kg/m3 0.86 7.167
balok 20x30 0.20 0.30 16.67 16 5.00 8.00 0.92 0.15 112.00 131.52 40.66 172.18 173 kg/m3 0.56 9.333
balok 15x25 0.15 0.25 26.67 13 6.00 8.00 0.72 0.15 178.00 166.70 50.57 217.27 218 kg/m3 0.53 14.133
plat lantai besi 10 3.50 0.12 2.25 10 10.00 10 3.50 0.15 19.00 13.87 41.00 54.87 -
2.25 6 20.00 6 3.50 20.00 9.99 15.54 25.52
0.66 10 20.00 10 0.66 38.00 8.17 15.52 23.69
104.08 124.170 kg/m3 1.00 8.333
m2 3.00 x pakai
m2 2.00 x pakai
m2 2.00 x pakai
m2 3.00 x pakai
m2 2.00 x pakai
m2 2.00 x pakai
m2 2.00 x pakai
m2 2.00 x pakai
m2 2.00 x pakai
m2 2.00 x pakai
m2 2.00 x pakai
m2 3.00 x pakai
m2 2.00 x pakai
m2 1.00 x pakai
m2 1.00 x pakai
m2 2.00 x pakai
m2 1.00 x pakai
m2 1.00 x pakai
m2 1.00 x pakai
m2 1.00 x pakai
m2 1.00 x pakai
m2 1 x pakai
SD SEPANJANG 2
WF
JUMLAH
PANJANG DUBEL / BOBOT/ BOBOT
NOMOR BATANG JUMLAH KUDA- SATUAN KODE PLAT LUASAN TEBAL BOBOT/M2
BATANG SINGGEL M' TOTAL
KUDA
batang 4.223 1.000 2.00 2.00 14.00 236.49 plendes 0.0500 10 80.90
tiang 0.328 1.000 2.00 2.00 14.00 18.37 kopel bawah 0.0246 8 64.93
voute 0.450 0.500 2.00 2.00 14.00 12.60 kopel atas 0.0257 8 64.93
voute atas 0.212 0.500 2.00 2.00 14.00 5.94 tutup wf kolom 0.0137 8 64.93
plat rip 0.0048 6 48.61
273.39 kg plat penyangga gording 0.0075 8 64.93
PANJANG
LAS NOMOR BATANG JUMLAH UKURAN
BATANG
jmlh / jmlh panjang
KODE PLAT Panjang Las SATUAN 9.660 12.00
kuda2 kuda2 total gording CNP 125.50.20.2,3
plendes 52.00 2 2 208.00 3.336 4.00 CNP 125.50.20.2,3
kopel bawah 90.00 2 2 360.00
kopel atas 90.00 2 2 360.00
dudukan gording 10.00 12 2 240.00 Trektang GORDING 1.00 60 10
1168.00 cm
DIBAGI 4 1168 10 116.80 cm Trektang KUDA-KUDA 6.95 2 16
jarum keras
angkur baut 16mm 8
Draf & Mur M10 Trekstank gording 60
Baut M12 A-325 30
JUMLAH
JUMLAH KUDA- BOBOT SAT
KUDA
2 2 16.18
2 2 6.39
2 2 6.66
2 2 3.56
10 2 4.63
12 2 11.69
49.11 kg
BOBOT/ BOBOT
SATUAN
M' TOTAL
4.51 522.80
4.51 60.18
582.98 kg
0.616 36.97
36.97 kg
1.577 21.93
21.93 kg
0.887 18.70
18.70 kg
6.00 buah
2.000 16 bh
1 60 bh
2 60 bh
PERHITUNGAN VOLUME
Nama Program : PENINGKATAN SARANA DAN PRASARANA APARATUR
Nama Kegiatan : PEMELIHARAAN RUTIN / BERKALA GEDUNG KANTOR
Nama Pekerjaan : REHAB PAGAR KANTOR & KAMAR MANDI/WC/GUDANG/R.RAPAT
Lokasi Kegiatan : KANTOR DISPORA SIDOARJO
II PEKERJAAN TANAH
1. Galihan tanah pondasi x x x = - = 7.31 m3
sepatu 250x150x30 2.50 x 1.50 x 0.35 x 2.00 = 2.63
sepatu 50x50x15 0.50 x 0.50 x 0.20 x 35.00 = 1.75
sloof pintu masuk 48.90 x 0.40 x 0.15 x 1.00 = 2.93
2. Urugan tanah kembali 7.31 x 0.25 x x = 1.83 = 1.83 m3
3. Urugan pasir bawah pondasi x x x = - = 0.81 m3
sepatu 250x150x30 2.50 x 1.50 x 0.05 x 2.00 = 0.38
sepatu 50x50x15 0.50 x 0.50 x 0.05 x 35.00 = 0.44
IV PEKERJAAN BETON
1. Beton Sloof 15/20 K-175 = 3.02 m3
sisi timur 23.55 x 0.15 x 0.20 x = 0.71
20.08 x 0.15 x 0.20 x = 0.60
lengkung 6.64 x 0.15 x 0.20 x = 0.20
sisi utara 50.40 x 0.15 x 0.20 x = 1.51
2. Beton kolom 20/20 K-175 x x x = - = 0.64 m3
utama 2.77 x 0.20 x 0.20 x 4.00 = 0.44
atas 1.21 x 0.20 x 0.20 x 4.00 = 0.19
3. Beton kolom 15/15 K-175 2.10 x 0.15 x 0.15 x 35.00 = 1.65 = 1.65 m3
4. Beton plat lantai t=10 cm x x x = - = 0.44 m3
bawah 1.03 x 2.14 x 0.10 x 2.00 = 0.44
5. Beton plat lantai t=10 cm x x x = - = 0.44 m3
atas 1.04 x 2.12 x 0.10 x 2.00 = 0.44
6. Beton ring balok 12/15 K-175 0.12 x 0.15 x 100.67 x 1.00 = 1.81 = 1.81 m3
7. Pas. Beton rabat dudukan rel pintu masuk K-100 48.90 x 0.15 x 0.15 x 1.00 = 1.10 = 1.10 m3
V PEKERJAAN PASANGAN
1. Pasangan bata Merah Gapura Utama 1PC : 5Ps
gapura utama 3.50 x 2.50 x x 2.00 = 17.50 = 15.98 m3
volume kolom dalam 0.64 x x x = 0.64
volume plat lantai dalam 0.44 + 0.44 x x = 0.88
total volume gapura utama 17.50 - 0.64 - 0.88 x = 15.98
2. Pasangan bata Merah Pilar 1PC : 5Ps
pilar 0.60 x 0.70 x x 35.00 = 14.70 = 13.05 m3
volume kolom dalam x x x = 1.65
total volume pilar 14.70 - 1.65 x x = 13.05
3. Pasangan bata Merah 1 bata 1PC : 5Ps
0.40 x 100.67 x x = 40.27 = 40.27 m2
4. Pasangan bata Merah 1/2 bata 1PC : 5Ps
pagar 0.55 x 100.67 x x = 55.37 = 61.97 m2
rong 0.15 x 0.40 x x 124.00 = 7.44
papan nama 0.70 x 2.68 x 2.00 x = 3.75
0.30 x 9.50 x x = 2.85
total volume bata 69.41 - 7.44 x x = 61.97
5. Plesteran dinding baru 1Pc : 5Ps x x = 60.40 m2
sloof 0.20 x 100.67 x x 2.00 = 40.27
list atas 0.10 x 100.67 x x 2.00 = 20.13
6. Pekerjaan Acian = 60.40 m2
7. Pasang Granite 60x60 cm = 326.93 m2
Pilar bawah 1.80 x 0.30 x x 35.00 = 18.90
list kecil atasnya 1.66 x 0.05 x x 35.00 = 2.91
1.52 x 0.05 x x 35.00 = 2.66
badan pilar 1.40 x 0.70 x x 35.00 = 34.30
list kecil atas badan pilar 1.52 x 0.05 x x 35.00 = 2.66
1.66 x 0.05 x x 35.00 = 2.91
1.80 x 0.05 x x 35.00 = 3.15
1.66 x 0.05 x x 35.00 = 2.91
topi miring 0.48 x 0.26 x 4.00 x 35.00 = 17.29
topi pilar 1.32 x 0.10 x x 35.00 = 4.62
1.20 x 0.05 x x 35.00 = 2.10
1.04 x 0.05 x x 35.00 = 1.82
NO URAIAN Panjang Lebar Tinggi Jumlah Total Volume Sat
1 2 3.00 4.00 5.00 6.00 7.00 8.00 9
Gapura bawah 2.20 x 4.80 x x 2.00 = 21.12
tengah 0.80 x 3.08 x x 2.00 = 4.93
atas 3.30 x 3.08 x x 2.00 = 20.33
bawah pagar 100.67 x 0.30 x x 2.00 = 60.40
pagar 61.97 x x x 2.00 = 123.94
8. Pasang Pintu Pagar besi hollow finishing cat isian kayu = 52.79 m2
4.50 x 2.05 x x 2.00 = 18.45
4.75 x 2.05 x x 1.00 = 9.74
3.75 x 2.05 x x 2.00 = 15.38
4.50 x 2.05 x x 1.00 = 9.23
9. Pasang rel pintu besi siku 40.40.4 15.40 + 9.50 + 15.00 + 9.00 = 48.90 = 48.90 m1
VI PEKERJAAN CAT
1. Cat dinding baru x x x = 60.40 = 60.40 m2
2. Cat Kayu x x x = - = 23.88 m2
pintu utama 1.29 x 0.15 x 2.00 x 26.00 = 10.06
pintu samping kua 0.94 x 0.15 x 2.00 x 14.00 = 3.95
pintu samping tengah 0.94 x 0.15 x 2.00 x 22.00 = 6.20
pintu paling barat 0.94 x 0.15 x 2.00 x 13.00 = 3.67
3. Cat besi hollow x x x = - = 54.67 m2
pintu utama 18.00 x 0.20 x 2.00 x = 7.20
3.90 x 0.20 x 2.00 x = 1.56
50.70 x 0.12 x 2.00 x = 12.17
pintu samping kua 18.64 x 0.20 x 1.00 x = 3.73
3.20 x 0.20 x 1.00 x = 0.64
41.60 x 0.12 x 1.00 x = 4.99
pintu samping tengah 15.00 x 0.20 x 2.00 x = 6.00
3.20 x 0.20 x 2.00 x = 1.28
33.60 x 0.12 x 2.00 x = 8.06
pintu paling barat 18.00 x 0.20 x 1.00 x = 3.60
3.20 x 0.20 x 1.00 x = 0.64
40.00 x 0.12 x 1.00 x = 4.80
VII PEKERJAAN TAMAN
1. Urugan tanah malang x x x = 1.00 = 1.00 truck
2. Penanaman pucuk merah h=100 cm x x x = 2.00 = 2.00 bh
3. Penanaman rumput gajah mini 4.65 x 1.32 x x = 6.14 = 6.14 m2
4. Perawatan dan jaminan hidup 1 bulan x x x = = 1.00 ls
5. Instalasi listrik lampu taman x x x = = 3.00 ttk
6. Pasang lampu LED Sorot 20 watt x x x = = 3.00 unit
7. Pas. Saklar ganda x x x = = 1.00 unit
KAMAR MANDI/WC/GUDANG/R.RAPAT
I PEKERJAAN PERSIAPAN
1. Pembersihan lokasi 67.90 x 1.00 x x 0.50 = 33.95 = 33.95 m2
2. Pembongkaran dinding 3.00 x 3.00 x 0.15 x 0.50 = 0.68 = 0.68 m3
II PEKERJAAN TANAH
1. Urugan sirtu bawah lantai = 27.06 m3
1 3.15 x 3.65 x 0.20 x 1.00 = 2.30
2 5.15 x 3.65 x 0.20 x 1.00 = 3.76
km/wc 3.15 x 1.50 x 0.17 x 1.00 = 0.80
depan km/wc 3.15 x 2.15 x 0.20 x 1.00 = 1.35
3 3.20 x 3.65 x 0.20 x 1.00 = 2.34
4 3.10 x 3.65 x 0.20 x 1.00 = 2.26
5 3.65 x 5.05 x 0.20 x 1.00 = 3.69
teras besar 3.13 x 14.09 x 0.20 x 1.00 = 8.82
teras kecil 8.71 x 1.00 x 0.20 x 1.00 = 1.74
IV PEKERJAAN PASANGAN
1. Pasangan bata Merah 1PC : 5Ps
depan 21.40 x 3.85 x x = 82.39 = 191.00 m2
belakang 21.40 x 1.70 x x = 36.38
horisontal 3.65 x 1.05 x 8.00 x = 30.66
sumur 17.80 x 2.39 x x = 42.54
gewel 0.50 x 3.65 x 1.42 x 8.00 = 20.73
= 212.70
p1 0.91 x 2.14 x 5.00 x = 9.74
p2 0.70 x 2.00 x 2.00 x = 2.80
p3 1.29 x 2.10 x 1.00 x = 2.71
j1 0.39 x 1.84 x 9.00 x = 6.46
= 21.70
total 212.70 - 21.70 = 191.00
2. Plesteran dinding baru 1Pc : 5Ps = 382.00 m2
dinding baru 191.00 x 2.00 = 382.00
3. Plesteran dinding lama 1Pc : 5Ps = 53.50 m2
dinding lama dalam 21.40 x 2.50 x x = 53.50
NO URAIAN Panjang Lebar Tinggi Jumlah Total Volume Sat
1 2 3.00 4.00 5.00 6.00 7.00 8.00 9
3. Pekerjaan Acian 382.00 + = 382.00 m2
V PEKERJAAN ATAP
1. Pasang rangka atap galvalume x x x = = 115.64 m2
besar 16.60 x 4.80 x x = 79.68
kecil 5.80 x 6.20 x x = 35.96
2. Pasang genteng kodok ex. Karangpilang x x x = = 130.33 m2
besar belakang 20.88 x 2.14 x x = 44.67
besar depan 18.79 x 3.06 x x = 57.48
kecil samping kiri 1.40 x 3.54 x x = 4.96
kecil samping kanan 3.75 x 3.54 x x = 13.28
kecil depan 0.50 x 5.80 x 3.43 x = 9.94
3. Pasang genteng bubung ex. Karangpilang 20.10 + 1.30 + 9.98 + 3.54 = 34.92 = 34.92 m1
4. Pasang talang seng galvalume 21.65 + 14.74 + 5.21 x = 41.60 = 41.60 m1
5. Pasang rangka canopy besi hollow 4x4 cm 2.55 x 14.09 x x = 35.93 = 35.93 m2
6. Pasang atap zincalume 2.55 x 14.09 x x = 35.93 = 35.93 m2
7. Pasang listplank Kalsiplank l=30cm 17.25 + 1.40 + 5.80 + 6.20 = 30.65 = 30.65 m1
VI PEKERJAAN PLAFOND
1. Pasang rangka plafond hollow galvalume = 105.14 m2
1 3.15 x 3.65 x x 1.00 = 11.50
2 5.15 x 3.65 x x 1.00 = 18.80
km/wc 3.15 x 1.50 x x 1.00 = 4.73
depan km/wc 3.15 x 2.15 x x 1.00 = 6.77
3 3.20 x 3.65 x x 1.00 = 11.68
4 3.10 x 3.65 x x 1.00 = 11.32
5 3.65 x 5.05 x x 1.00 = 18.43
teras besar 0.50 x 14.74 x x 1.00 = 7.37
1.00 x 3.15 x x 1.00 = 3.15
1.00 x 1.40 x x 1.00 = 1.40
teras besar 1.00 x 3.80 x x 1.00 = 3.80
1.00 x 6.20 x x 1.00 = 6.20
VIII PEKERJAAN KM / WC
1. Pasang daun pintu kamar mandi
- Pasang kusen alumunium 4" Coklat 2.00 + 2.00 + 0.60 x 2.00 = 9.20 = 9.20 m1
- daun pintu aluminium 0.60 x 2.00 x 2.00 = 2.40 = 2.40 m2
- Engsel pintu 2.00 x 2.00 x = 4.00 bh
- Pasang slot pintu 2x putar 1.00 x 2.00 x = 2.00 bh
2. Pasang Kloset jongkok = 2.00 bh
3. Pasang Floor drain = 2.00 bh
4. Pasang Kran air = 2.00 bh
5. Pasang lantai keramik 20x20cm 1.30 x 1.50 = 1.95 = 4.73 m2
1.85 x 1.50 = 2.78
6. Pasang keramik dinding 20x25cm 5.85 x 1.50 x = 8.78 = 15.98 m2
4.80 x 1.50 x = 7.20
7. Instalasi Pipa air bersih 3/4" = 8.00 m'
8. Instalasi Pipa air kotor 3" = 12.00 m'
9. Instalasi Pipa air kotor 4" = 12.00 m'
10. Pekerjaan septiktank Batu bata = 1.00 unit
11. Pekerjaan resapan buis beton Ø 80cm (3bh) = 1.00 unit
X PEKERJAAN CAT
1. Cat dinding baru = 382.00 m2
2. Cat dinding lama = 53.50 m2
3. Cat plafond = 105.14 m2
4. Cat listplank 0.35 x 30.65 = 10.73 m2
B PEKERJAAN GASEBO
1. Pasang gasebo lengkap = 1.00 unit
II PEKERJAAN CAT
1. Cat dinding lama = 1,165.09 m2
horisontal paling timur 10.80 x 3.50 x x = 37.80
7.20 x 3.50 x x = 25.20
3.00 x 3.50 x x = 10.50
3.60 x 3.50 x x = 12.60
5.60 x 3.50 x x = 19.60
7.10 x 3.50 x x = 24.85
5.60 x 3.50 x x = 19.60
5.70 x 3.50 x x = 19.95
5.75 x 3.50 x x = 20.13
15.80 x 3.50 x x = 55.30
2.00 x 3.50 x x = 7.00
7.25 x 3.50 x x = 25.38
2.00 x 3.50 x x = 7.00
paling barat 7.20 x 3.50 x x = 25.20
vertical paling utara 12.00 x 3.50 x x = 42.00
4.75 x 3.50 x x = 16.63
3.50 x 3.50 x x = 12.25
3.50 x 3.50 x x = 12.25
10.75 x 3.50 x x = 37.63
6.00 x 3.50 x x = 21.00
8.50 x 3.50 x x = 29.75
5.25 x 3.50 x x = 18.38
6.50 x 3.50 x x = 22.75
6.00 x 3.50 x x = 21.00
2.00 x 3.50 x x = 7.00
6.00 x 3.50 x x = 21.00
4.50 x 3.50 x x = 15.75
4.00 x 3.50 x x = 14.00
paling selatan 13.50 x 3.50 x x = 47.25
kolom teras 1.60 x 3.30 x 2.00 x = 10.56
gewel teras 0.50 x 7.75 x 1.41 x = 5.46
bata bawah gewel 10.75 x 0.68 x x = 7.31
= 672.06
rong kusen x x x = -
p1 1 2.00 x 2.10 x 1.00 x = 4.20
p2 16 0.90 x 2.10 x 16.00 x = 30.24
p3 1 2.00 x 2.10 x 1.00 x = 4.20
p4 3 0.80 x 2.00 x 3.00 x = 4.80
j1 2 1.00 x 2.80 x 2.00 x = 5.60
j2 6 0.42 x 2.50 x 6.00 x = 6.30
j3 10 1.78 x 1.92 x 10.00 x = 34.18
= 89.52
total 672.06 - 89.52 x x 2.00 = 1,165.09
B KANTIN
I PEKERJAAN PERSIAPAN
1. Pembersihan lokasi 27.10 x 1.00 x = 27.10 = 27.10 m2
2. Pekerjaan Bongkaran atap 3.75 x 9.80 x x 1.00 = 36.75 = 36.75 m2
II PEKERJAAN BETON
1. Beton balok latei 12/15 K-175 0.12 x 0.15 x 11.40 x 1.00 = 0.21 = 0.21 m3
2. Pas. Beton rabat bawah lantai K-100 x x x = - = 0.85 m3
4.50 x 2.50 x 0.03 x 1.00 = 0.34
2.50 x 3.75 x 0.03 x 1.00 = 0.28
2.80 x 2.80 x 0.03 x 1.00 = 0.24
III PEKERJAAN PASANGAN
1. Pasangan bata Merah 1PC : 5Ps
PENINGGIAN 0.50 x 27.10 x x = 13.55 = 13.55 m2
2. Plesteran dinding baru 1Pc : 5Ps = 27.10 m2
dinding baru 13.55 x 2.00 = 27.10
3. Pekerjaan Acian 27.10 + = 27.10 m2
IV PEKERJAAN ATAP
1. Pasang rangka atap galvalume x x x = = 56.05 m2
besar 4.75 x 11.80 x x = 56.05
2. Pasang atap zincalume x x x = - = 92.38 m2
kantin 4.75 x 11.80 x x = 56.05
canopy 1.50 x 7.15 x x = 10.73
4.50 x 4.75 x x = 21.38
1.30 x 3.25 x x = 4.23
3. Pasang rangka canopy besi hollow 3,5x3,5 cm x x x = 92.38 = 92.38 m2
V PEKERJAAN PLAFOND
1. Pasang rangka plafond hollow galvalume = 10.13 m2
kantin 2.25 x 4.50 x x 1.00 = 10.13
2. Pasang penutup plafond gypsumboard 9mm = 10.13 m2
3. List gypsum kecil = 13.50 m'
kantin 2.25 + 4.50 x 2.00 x 1.00 = 13.50
IX PEKERJAAN CAT
1. Cat dinding baru = 27.10 m2
2. Cat dinding lama = 149.68 m2
21.05 x 2.76 = 58.16
9.80 x 2.76 = 27.08
= 85.24
pintu harmonika 2.00 x 2.00 x x 1.00 = 4.00
p1 2.14 x 0.91 x x 2.00 = 3.89
p2 2.14 x 0.91 x x 1.00 = 1.95
0.66 x 0.84 x x 1.00 = 0.55
= 10.40
total cat 85.24 - 10.40 x 2.00 = 149.68
3. Cat plafond = 10.13 m2
PERHITUNGAN VOLUME
Nama Program : PENDIDIKAN DASAR
Nama Kegiatan : PEMBANGUNAN DAN REHABILITASI BANGUNAN SD
Nama Pekerjaan : REHABILITASI SD NEGERI KEMANTREN I
Lokasi Kegiatan : KEC. TULANGAN KAB. SIDOARJO
I PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi 37.36 x 1.00 x x 1.00 = 37.36 = 37.36 m2
2. Pekerjaan Bongkaran dinding 0.50 x 0.15 x 3.00 x 4.00 = 0.90 = 0.90 m3
II PEKERJAAN TANAH
1. Galian tanah untuk pondasi 0.60 x 0.60 x 0.75 x 15.00 = 4.05 = 4.05 m3
2. Urugan Tanah Kembali 0.25 x 4.05 x x = 1.01 = 1.01 m3
3. Urugan pasir bawah pondasi 0.60 x 0.60 x 0.05 x 15.00 = 0.27 = 0.27 m3
IV PEKERJAAN BETON
2. Beton Kolom K2 15/15 0.15 x 0.15 x 3.50 x 5.00 = 0.39 = 0.39 m3
3. Beton Kolom K3 20/20 0.20 x 0.20 x 3.50 x 2.00 = 0.28 = 0.28 m3
4. Beton Kolom KP 12/12 0.12 x 0.12 x 3.50 x 4.00 = 0.20 = 0.20 m3
5. Beton balok latei 12/15 0.12 x 0.15 x 12.00 x 1.00 = 0.22 = 0.56 m3
0.12 x 0.15 x 6.00 x 1.00 = 0.11
0.12 x 0.15 x 2.00 x 4.00 = 0.14
0.12 x 0.15 x 5.00 x 1.00 = 0.09
6. Beton Balok 15/15 0.15 x 0.15 x 15.00 x 1.00 = 0.34 = 0.34 m3
7. Beton plat canopy t=5 cm K-175 0.91 x 0.50 x 0.05 x 1.00 = 0.02 = 0.02 m3
8. Beton ring balok 12/15 0.12 x 0.15 x 55.85 x 1.00 = 1.01 = 1.52 m3
ring gewel 0.12 x 0.15 x 6.28 x 4.00 = 0.45
0.12 x 0.15 x 3.66 x 1.00 = 0.07
V PEKERJAAN PASANGAN
1. Pasangan Bata Merah 1pc : 6ps 0.80 x 55.85 x x = = 19.62 m2
gewel utama 0.50 x 5.00 x 1.80 x 4.00 = 18.00
gewel teras 0.50 x 2.85 x 1.14 x 1.00 = 1.62
= 19.62
2. Plesteran dinding 1pc : 6ps baru - x 2.00 x x = - = 19.62 m2
gewel utama 18.00 x 1.00 x x = 18.00
gewel teras 1.62 x 1.00 x x = 1.62
- Engsel Casement uk. 12" 4.00 + 1.00 + 2.00 x 2.00 = 14.00 = 14.00 BH
- Pasang Rambuncis 7.00 x x x = 7.00 = 7.00 bh
5. Pasang kaca Bening t=5mm = 4.18 m2
pj1 0.60 x 0.76 x 1.00 = 0.46
0.82 x 0.50 x 1.00 = 0.41
0.60 x 0.50 x 2.00 = 0.60
j1 0.60 x 0.76 x 2.00 = 0.91
0.60 x 0.50 x 3.00 x 2.00 = 0.90
bv1 0.60 x 0.50 x 3.00 x 1.00 = 0.90
IX PEKERJAAN LANTAI
1. Pasang lantai keramik 40x40 x x x = - = 89.31 m2
R. Guru 6.00 x 5.00 x x 1.00 = 30.00
R. Kepsek 3.00 x 5.00 x x 1.00 = 15.00
UKS 3.00 x 3.00 x x 1.00 = -
Pantry 2.00 x 1.75 x x 1.00 = 3.50
teras depan kepsek 1.85 x 2.85 x x 1.00 = 5.27
1.00 x 2.50 x x 1.00 = 2.50
1.00 x 2.08 x x 1.00 = 2.08
teras besar 1.50 x 12.00 x x 1.00 = 18.00
teras kecil 1.08 x 12.00 x x 1.00 = 12.96
XI PEKERJAAN CAT
1. Cat dinding baru 19.62 + 42.75 + 86.56 x = 148.93 = 148.93 m2
2. Cat listplank 0.30 x 57.96 x x = 17.39 = 17.39 m2
3. Cat plafon 113.61 x x x = 113.61 = 113.61 m2
PEMERINTAH KABUPATEN SIDOARJO
DINAS KESEHATAN
UPTD PUSKESMAS TROSOBO
Jl. Raya Trosobo Taman - Sidoarjo, Kode Pos 61257
Telp. 031-7873664 Email : pkmtrosobo@gmail.com
PROGRAM :
KEGIATAN :
E.E
( Engineer Estimate)
PEKERJAAN :
LOKASI PEKERJAAN :
TAHUN ANGGARAN :
2018
KONSULTAN PERENCANA
DAFTAR HARGA BAHAN BANGUNAN
SEBELUM PPN UNTUK TAHUN ANGGARAN 2018 SEMESTER I
I PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi Awal & Akhir Kegiatan = 1.00 Ls.
II PEKERJAAN TANAH
1. Penggalian Tanah Biasa Untuk Pondasi 0.90 x 0.90 x 1.20 x 2.00 = 1.94 = 1.94 m3
2. Pekerjaan Beton Pondasi Strous Ø(30x30)cm 0.15 x 3.14 x 2.00 x 2.00 = 1.88 = 1.88 m3
4. Beton rabat 1Pc : 3Ps : 6Kr Tebal. 10cm 1.10 x 1.10 x 0.10 x 2.00 = 0.24 = 0.24 m3
3. Penebalan Plesteran Beton 1Pc : 4Ps 4.30 x 0.60 x 2.00 = 5.16 = 28.76 m2
4.30 x 0.40 x 2.00 = 3.44
4.75 x 0.40 x 2.00 = 3.80
0.50 x 0.08 x 10.00 = 0.40
7.00 x 0.60 x 2.00 = 8.40
4.75 x 1.00 x 2.00 = 9.50
4.75 x 0.40 x 2.00 = 3.80
Pengurangan Plesteran 4.10 x 0.70 x 2.00 = - 5.74
5. Plat Beton 12cm (Untuk Penutup Saluran) 4.00 x 0.80 x 0.12 x 1.00 = 0.38 = 0.38 m3
V PEKERJAAN FINISHING
1. Font Akrilik Mirror Cutting Laser (Warna Gold) Size 12 cm = 41.00 = 41.00 bh
2. Font Akrilik Mirror Cutting Laser (Warna Gold) Size 20 cm = 20.00 = 20.00 bh
3. Font Akrilik Mirror Cutting Laser (Warna Gold) Size 8 cm = 38.00 = 38.00 bh
4. Logo Sidoarjo Bahan Akrilik Sticker = 1.00 = 1.00 bh
5. Logo UPT Puskesmas Bahan Akrilik Sticker = 1.00 = 1.00 bh
6. Pasangan Batu Alam Andesit Finishing Countting 4.75 x 1.00 x 2.00 = 9.50 = 7.56 m2
4.75 x 0.40 x 2.00 = 3.80
Pengurangan Batu Alam 4.10 x 0.70 x 2.00 = - 5.74
VI PEKERJAAN BESI
1. Pipa Bulat Stainless Steel ∅ 2" Tebal 0.8mm 1.00 x 25.00 = 25.00 = 25.00 m1
2. Plat Besi Baja Hitam Tebal 1.4 mm (Untuk Papan Nama) 7.60 x 0.70 x 2.00 = 10.64 = 10.85 m2
0.70 x 0.15 x 2.00 = 0.21
3. Rangka Hollow 40x40x1.2 mm (Untuk Papan Nama)
Vertikal 0.70 x 4.00 = 2.80 = 38.85 m1
0.70 x 7.00 = 4.90
Horisontal 7.60 x 4.00 = 30.40
0.15 x 5.00 = 0.75
4. Finishing Cat Besi = 10.85 m2
REKAPITULASI
ENGINEER ESTIMATE
#VALUE!
HARGA
NO URAIAN SAT.
JAM HARI
1 Mandor org 19,749.00 157,992.00
2 Kepala tukang org 18,499.00 147,992.00
3 Tukang org 17,124.00 136,992.00
4 Pekerja org 15,374.00 122,992.00
5 Operator org 17,124.00 136,992.00
6 Pembantu operator org 15,374.00 122,992.00
7 Sopir org 17,124.00 136,992.00
8 Pembantu sopir org 15,374.00 122,992.00
9 Mekanik org 17,124.00 136,992.00
10 Pembantu mekanik org 15,374.00 122,992.00
31 Aluminium strip m -
32 Roof light fibreglass kg -
33 Tepung Gypsum kg 4,125.00
34 Ramset bh -
35 BAHAN MENGGUNAKAN KAYU -
36 Dolken kayu Ø 8-10/400 cm bh 21,000.00
37 Kayu jati balok 8/12, 6/12 m3 -
38 Kayu jati usuk 5/7, 4/6, 3/5 m3 -
39 Kayu jati papan 2/20 x 2 m m3 -
40 Kayu jati reng 2/3, 3/5 m3 -
41 Kayu kamper (balok) m3 7,250,000.00
NO URAIAN SAT. HARGA KETERANGAN
91 Keni bh -
92 Besi pipa galvanis medium 1 1/2, 6m ljr 380,000.00
93 Besi pipa galvanis medium 1 1/4, 6m ljr 402,500.00
94 Besi pipa galvanis medium 1 , 6m ljr 305,000.00
95 Besi pipa galvanis medium 1/2, 6m ljr 160,000.00
96 Besi pipa galvanis medium 2 1/2, 6m ljr 415,000.00
97 Besi pipa galvanis medium 2, 6m ljr 476,666.67
98 Besi pipa galvanis medium 3, 6m ljr 975,000.00
99 Besi pipa galvanis medium 4, 6m ljr -
100 Besi pipa galvanis medium 5, 6m ljr -
101 Besi pipa galvanis medium 6, 6m ljr -
NO URAIAN SAT. HARGA KETERANGAN
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN (Rp) JUMLAH HARGA (Rp.)
1 2 3 4 5 6
PEMBANGUNAN GAPURA BARU PUSKESMAS TROSOBO
I PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi Awal & Akhir Kegiatan 1.00 Ls. 1,500,000.00 1,500,000.00
2. Pembongkaran Gapura Existing 1.00 Ls. 3,500,000.00 3,500,000.00
Jumlah I 5,000,000.00
II PEKERJAAN TANAH
1. Penggalian Tanah Biasa Untuk Pondasi 1.94 m3 105,813.18 205,700.82
2. Urugan Tanah Kembali 0.49 m3 76,335.16 37,098.89
3. Urugan Pasir 5cm 0.08 m3 161,125.27 13,051.15
Jumlah II 255,850.86
III PEKERJAAN PONDASI
1. Pekerjaan Pengeboran Pondasi Strous Ø(30x30)cm 4.00 m1 215,252.29 861,009.18
2. Pekerjaan Beton Pondasi Strous Ø(30x30)cm 1.88 m3 264,232,665.95 497,814,342.65
3. Plat Sepatu 100x100x20cm 0.40 m3 4,036,829.16 1,614,731.66
4. Beton rabat 1Pc : 3Ps : 6Kr Tebal. 10cm 0.24 m3 901,284.98 218,110.97
Jumlah III 500,508,194.46
IV PEKERJAAN STRUKTUR UTAMA
1. Kolom Beton 60/40 1.03 m3 264,232,665.95 272,688,111.26
2. Kolom Beton 100/40 1.04 m3 264,232,665.95 274,537,739.92
3. Penebalan Plesteran Beton 1Pc : 4Ps 28.76 m2 7,932,612.78 228,141,943.69
4. Finishing Granit Lokal 60 x 60 cm 8.60 m2 547,725.54 4,710,439.61
5. Plat Beton 12cm (Untuk Penutup Saluran) 0.38 m3 4,711,995.29 1,809,406.19
Jumlah IV 781,887,640.67
V PEKERJAAN FINISHING
1. Font Akrilik Mirror Cutting Laser (Warna Gold) Size 12 cm 41.00 buah 67,000.00 2,747,000.00
2. Font Akrilik Mirror Cutting Laser (Warna Gold) Size 20 cm 20.00 buah 80,000.00 1,600,000.00
3. Font Akrilik Mirror Cutting Laser (Warna Gold) Size 8 cm 38.00 buah 50,000.00 1,900,000.00
4. Logo Sidoarjo Bahan Akrilik Sticker 1.00 buah 500,000.00 500,000.00
5. Logo UPT Puskesmas Bahan Akrilik Sticker 1.00 buah 500,000.00 500,000.00
6. Pasangan Batu Alam Andesit Finishing Countting 7.56 m2 304,347.92 2,300,870.26
7. Lampu Sorot LED 30 Watt 2.00 buah 250,000.00 500,000.00
Jumlah V 10,047,870.26
VI PEKERJAAN BESI
1. Pipa Bulat Stainless Steel ∅ 2" Tebal 0.8mm 25.00 m1 100,445.54 2,511,138.51
2. Plat Besi Baja Hitam Tebal 1.4 mm (Untuk Papan Nama) 10.85 m2 212,482.43 2,305,434.39
3. Rangka Hollow 40x40x1.2 mm (Untuk Papan Nama) 38.85 m1 62,935.54 2,445,045.74
4. Finishing Cat Besi 10.85 m2 #VALUE! #VALUE!
Jumlah VI #VALUE!
TOTAL #VALUE!
PPn 10% #VALUE!
JUMLAH TOTAL #VALUE!
DIBULATKAN #VALUE!
ANALISA HARGA SATUAN PEKERJAAN TAHUN 2018
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.75 122,992.00 92,244.00
Mandor L.04 OH 0.03 157,992.00 3,949.80
JUMLAH TENAGA KERJA 96,193.80
B BAHAN
Jenis Pekerjaan : Pengurugan kembali 1 m3 galian tanah ( 1/3 kali koefisien pekerjaan galian)
Satuan Pembayaran : 1 m3
Referensi : AHSP PU-CK 2013; A. 2.3.1.9 ; Hal: 380
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.50 122,992.00 61,496.00
Mandor L.04 OH 0.05 157,992.00 7,899.60
JUMLAH TENAGA KERJA 69,395.60
B BAHAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 122,992.00 36,897.60
Mandor L.04 OH 0.01 157,992.00 1,579.92
JUMLAH TENAGA KERJA 38,477.52
B BAHAN
Pasir urug 1.20 90,000.00 108,000.00
JUMLAH HARGA BAHAN 108,000.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.25 122,992.00 30,748.00
Mandor L.04 OH 0.03 157,992.00 3,949.80
JUMLAH TENAGA KERJA 34,697.80
B BAHAN
Sirtu m3 1.20 187,000.00 224,400.00
JUMLAH HARGA BAHAN 224,400.00
C PERALATAN
Jenis Pekerjaan : Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2Pasir Pasang.
Satuan Pembayaran : 1 m2
Referensi : AHSP PU-CK A.4.4.2.26
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 122,992.00 36,897.60
Tukang Batu L.03 OH 0.15 136,992.00 20,548.80
Kepala Tukang L.03 OH 0.02 147,992.00 2,219.88
Mandor L.04 OH 0.02 157,992.00 2,369.88
JUMLAH TENAGA KERJA 62,036.16
B BAHAN
Semen Portland Kg 6.34 1,145.00 7,259.30
Pasir pasang m3 0.01 192,917.00 2,315.00
JUMLAH HARGA BAHAN 9,574.30
C PERALATAN
Jenis Pekerjaan
: Pengecatan 1 m2 tembok baru EXTERIOR ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Satuan Pembayaran : 1 m2
Referensi : AHSP PU-CK A.4.7.1.10
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.02 122,992.00 2,459.84
Tukang cat L.02 OH 0.06 136,992.00 8,630.50
Kepala tukang L.03 OH 0.01 147,992.00 932.35
Mandor L.04 OH 0.00 157,992.00 473.98
JUMLAH TENAGA KERJA 12,496.66
B BAHAN
Plamur tembok Kg 0.10 16,500.00 1,650.00
Cat dasar Kg 0.10 23,500.00 2,350.00
Cat tembok Kg 0.26 23,500.00 6,110.00
JUMLAH HARGA BAHAN 10,110.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A Pekerjaan
Pekerjaan Bekisting Pondasi m2 5.52 91,721.43 506,651.69
Pekerjaan Pembesian kg 165.65 14,059.27 2,328,964.70
Pekerjaan Beton K-250 m3 1.00 1,141,821.70 1,141,821.70
Pembongkaran Begesting m2 5.52 10,751.83 59,391.07
JUMLAH 4,036,829.16
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A Pekerjaan
Pekerjaan Bekisting Pondasi m2 8.00 91,721.43 733,771.41
Pekerjaan Pembesian kg 181.60 14,059.27 2,553,188.24
Pekerjaan Beton K-250 m3 1.00 1,141,821.70 1,141,821.70
Pembongkaran Begesting m2 8.00 10,751.83 86,014.65
JUMLAH 4,514,796.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A Pekerjaan
Pekerjaan Bekisting Pondasi m2 8.00 91,721.43 733,771.41
Pekerjaan Pembesian kg 182.60 14,059.27 2,567,247.50
Pekerjaan Beton K-250 m3 1.00 1,141,821.70 1,141,821.70
Pembongkaran Begesting m2 8.00 10,751.83 86,014.65
JUMLAH 4,528,855.26
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A Pekerjaan
Pekerjaan Bekisting Balok m2 10.00 164,042.84 1,640,428.36
Pekerjaan Pembesian kg 189.00 14,059.27 2,657,201.09
Pekerjaan Beton K-250 m3 1.00 1,141,821.70 1,141,821.70
Pembongkaran Begesting m2 10.00 10,751.83 107,518.31
JUMLAH 5,546,969.46
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A Pekerjaan
Pekerjaan Bekisting Kolom m2 16.67 15,543,417.84 259,056,963.93
Pekerjaan Pembesian kg 291.28 14,059.27 4,095,219.85
Pekerjaan Beton K-100 m3 1.00 901,284.98 901,284.98
Pembongkaran Begesting m2 16.67 10,751.83 179,197.19
JUMLAH 264,232,665.95
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A Pekerjaan
Pekerjaan Bekisting Lantai m2 8.33 189,617.84 1,580,148.63
Pekerjaan Pembesian kg 135.17 14,059.27 1,900,426.37
Pekerjaan Beton K-250 m3 1.00 1,141,821.70 1,141,821.70
Pembongkaran Begesting m2 8.33 10,751.83 89,598.59
JUMLAH 4,711,995.29
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.44 122,992.00 177,108.48
Mandor L.04 OH 0.07 157,992.00 11,375.42
JUMLAH TENAGA KERJA 188,483.90
B BAHAN
Jenis Pekerjaan
: Pemasangan 1m2 lantai granit ukuran lokal 60 cm x 60 cm
Satuan Pembayaran : 1 m2
Referensi : AHSP PU-CK A.4.7.1.35
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.70 122,992.00 86,094.40
Tukang batu L.02 OH 0.35 136,992.00 47,947.20
Kepala tukang L.03 OH 0.04 147,992.00 5,179.72
Mandor L.04 OH 0.04 157,992.00 5,529.72
JUMLAH TENAGA KERJA 144,751.04
B BAHAN
Granit Lokal 60 x 60 cm Doos 1.05 313,500.00 329,175.00
Semen portland (kg) Kg 10.00 1,145.00 11,450.00
Pasir pasang M3 0.05 192,917.00 8,681.27
Semen warna Kg 0.50 7,750.00 3,875.00
JUMLAH HARGA BAHAN 353,181.27
C PERALATAN
JUMLAH
D Jumlah (A+B+C) HARGA 349,965.00
ALAT
E Overhead & Profit (Contoh 10%) 10% x D (maksimum) 34,996.50
F Harga Satuan Pekerjaan (D+E) 384,961.50
JUMLAH
D Jumlah (A+B+C) HARGA 228,357.50
ALAT
E Overhead & Profit (Contoh 10%) 10% x D (maksimum) 22,835.75
F Harga Satuan Pekerjaan (D+E) 251,193.25
Pasang Usuk reng galvalume jarak 60cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 122,992.00 36,897.60
Tukang besi L.02 OH 0.150 136,992.00 20,548.80
Kepala tukang L.03 OH 0.015 147,992.00 2,219.88
Mandor L.04 OH 0.002 157,992.00 315.98
JUMLAH TENAGA KERJA 59,982.26
B BAHAN
Maintruss C 70.30.0,75 m' 2.300 13,500.00 31,050.00
Reng UK 3.2.0,45 m' 4.770 5,500.00 26,235.00
Screw 12 - 14 x 20 bh 8.000 300.00 2,400.00
Screw 12 - 14 x 16 bh 16.000 300.00 4,800.00
JUMLAH HARGA BAHAN 64,485.00
C PERALATAN
1 m1 Pasang Kansteen
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 122,992.00 18,448.80
Tukang batu L.03 OH 0.200 136,992.00 27,398.40
Kepala tukang L.11 OH 0.020 147,992.00 2,959.84
Mandor L.15 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 50,386.96
B BAHAN
Kanstin (DT 21) K 300 buah 1.660 17,250.00 28,635.00
Semen portland sak 0.120 46,000.00 5,520.00
Pasir Pasang m3 0.008 271,600.00 2,172.80
JUMLAH HARGA BAHAN 36,327.80
C PERALATAN
A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) (K100)
cm, w/c = 0,87
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 1.200 122,992.00 147,590.40
2 Tukang batu L.02 OH 0.200 136,992.00 27,398.40
3 Kepala tukang L.03 OH 0.020 147,992.00 2,959.84
4 Mandor L.04 OH 0.060 157,992.00 9,479.52
JUMLAH TENAGA KERJA 187,428.16
B BAHAN
1 Semen portland (kg) kg 230 1,150.00 264,500.00
2 Pasir Beton (kg) kg 893 223.81 199,861.69
3 koral beton (kg) kg 1027 207.41 213,007.41
4 Air Liter 200 100.00 20,000.00
JUMLAH HARGA BAHAN 697,369.10
C PERALATAN
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 1.650 122,992.00 202,936.80
2 Tukang batu L.02 OH 0.275 136,992.00 37,672.80
3 Kepala tukang L.03 OH 0.028 147,992.00 4,143.78
4 Mandor L.04 OH 0.083 157,992.00 13,113.34
JUMLAH TENAGA KERJA 257,866.71
B BAHAN
1 Semen portland (kg) kg 326 1,150.00 374,900.00
2 Pasir Beton (kg) kg 760 223.81 170,095.06
3 koral beton (kg) kg 1029 207.41 213,422.22
4 Air Liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 779,917.28
C PERALATAN
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (K350)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K-175 M3 1.000 1,141,562.39 1,141,562.39
Pekerjaan besi polos Kg 73.593 14,835.90 1,091,825.06
JUMLAH 2,233,387.46
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K-175 M3 1.000 1,141,562.39 1,141,562.39
Pekerjaan besi polos Kg 232.104 14,835.90 3,443,469.07
Begesting balok 2x pakai m2 9.167 485,142.41 4,447,138.73
JUMLAH 9,032,170.19
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, Seng galvalum 0,3 lebar 60 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 122,992.00 18,448.80
Tukang besi L.03 OH 0.300 136,992.00 41,097.60
Kepala tukang L.03 OH 0.030 147,992.00 4,439.76
Mandor L.04 OH 0.008 157,992.00 1,263.94
JUMLAH TENAGA KERJA 65,250.10
B BAHAN
Seng galvalum 0,3 lebar 60 cm m 1.050 33,500.00 35,175.00
Paku 1 cm - 2,5 cm kg 0.010 19,500.00 195.00
Besi Strip (2x3)cm kg 0.500 11,200.00 5,600.00
JUMLAH HARGA BAHAN 40,970.00
C PERALATAN
A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 122,992.00 30,748.00
Tukang besi L.02 OH 0.250 136,992.00 34,248.00
Kepala tukang L.03 OH 0.025 147,992.00 3,699.80
Mandor L.04 OH 0.013 157,992.00 2,053.90
JUMLAH TENAGA KERJA 70,749.70
B BAHAN
Besi hollow 4x4 plafon M1 3.50 8,000.00 28,000.00
Assesoris (perkuatan, las dll) Ls 100% xrangka 28,000.00 28,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.734 122,992.00 90,276.13
Tukang besi L.02 OH 0.734 136,992.00 100,552.13
Kepala tukang L.03 OH 0.073 147,992.00 10,803.42
Mandor L.04 OH 0.037 157,992.00 5,845.70
JUMLAH TENAGA KERJA 207,477.38
B BAHAN
Maintruss C 70.30.0,75 kg 3.065 13,500.00 41,377.50
JUMLAH HARGA BAHAN 41,377.50
C PERALATAN
Peralatan % 10.000 41,377.50 4,137.750
JUMLAH HARGA ALAT 4,137.750
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7604 122,992.00 93,523.12
Tukang besi L.02 OH 0.7604 136,992.00 104,168.72
Kepala tukang L.03 OH 0.076 147,992.00 11,247.39
Mandor L.04 OH 0.038 157,992.00 6,003.70
JUMLAH TENAGA KERJA 214,942.92
B BAHAN
Maintruss C 70.30.0,75 kg 4.050 13,500.00 54,675.00
JUMLAH HARGA BAHAN 54,675.00
C PERALATAN
Peralatan % 10.000 54,675.00 5,467.500
JUMLAH HARGA ALAT 5,467.500
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 122,992.00 73,795.20
Tukang batu L.02 OH 0.200 136,992.00 27,398.40
Kepala tukang L.03 OH 0.020 147,992.00 2,959.84
Mandor L.04 OH 0.030 157,992.00 4,739.76
JUMLAH TENAGA KERJA 108,893.20
B BAHAN
Bata merah buah 140.000 750.00 105,000.00
Semen portland (kg) Kg 18.500 1,150.00 21,275.00
Pasir pasang m3 0.122 271,600.00 33,135.20
JUMLAH HARGA BAHAN 159,410.20
C PERALATAN
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 122,992.00 36,897.60
Tukang batu L.02 OH 0.100 136,992.00 13,699.20
Kepala tukang L.03 OH 0.010 147,992.00 1,479.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 54,446.60
B BAHAN
Bata merah buah 70.000 750.00 52,500.00
Semen portland (kg) Kg 18.950 1,150.00 21,792.50
Pasir pasang m3 0.038 271,600.00 10,320.80
JUMLAH HARGA BAHAN 84,613.30
C PERALATAN
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 122,992.00 36,897.60
Tukang batu L.02 OH 0.100 136,992.00 13,699.20
Kepala tukang L.03 OH 0.010 147,992.00 1,479.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 54,446.60
B BAHAN
Bata merah buah 70.000 750.00 52,500.00
Semen portland (kg) Kg 11.500 1,150.00 13,225.00
Pasir pasang m3 0.043 271,600.00 11,678.80
JUMLAH HARGA BAHAN 77,403.80
C PERALATAN
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 122,992.00 36,897.60
Tukang batu L.02 OH 0.100 136,992.00 13,699.20
Kepala tukang L.03 OH 0.010 147,992.00 1,479.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 54,446.60
B BAHAN
Bata merah buah 70.000 750.00 52,500.00
Semen portland (kg) Kg 9.680 1,150.00 11,132.00
Pasir pasang m3 0.045 271,600.00 12,222.00
JUMLAH HARGA BAHAN 75,854.00
C PERALATAN
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 122,992.00 36,897.60
Tukang batu L.02 OH 0.100 136,992.00 13,699.20
Kepala tukang L.03 OH 0.010 147,992.00 1,479.92
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 54,446.60
B BAHAN
Bata merah buah 70.000 750.00 52,500.00
Semen portland (kg) Kg 6.500 1,150.00 7,475.00
Pasir pasang m3 0.050 271,600.00 13,580.00
JUMLAH HARGA BAHAN 73,555.00
C PERALATAN
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.26 122,992.00 31,977.92
Tukang batu L.02 OH 0.130 136,992.00 17,808.96
Kepala tukang L.03 OH 0.013 147,992.00 1,923.90
Mandor L.04 OH 0.0003 157,992.00 47.40
JUMLAH TENAGA KERJA 51,758.17
B BAHAN
Bata ringan tebal 10 cm m3 0.100 670,889.00 67,088.90
Mortar siap pakai (MSP) Kg 4.000 6,100.00 24,400.00
JUMLAH HARGA BAHAN 91,488.90
C PERALATAN
228 83333.3
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 122,992.00 36,897.60
Tukang batu L.03 OH 0.150 136,992.00 20,548.80
Kepala tukang L.03 OH 0.015 147,992.00 2,219.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 62,036.16
B BAHAN
Semen portland (kg) Kg 7.776 1,150.00 8,942.40
Pasir pasang m3 0.023 271,600.00 6,246.80
JUMLAH HARGA BAHAN 15,189.20
C PERALATAN
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 122,992.00 36,897.60
Tukang batu L.03 OH 0.150 136,992.00 20,548.80
Kepala tukang L.03 OH 0.015 147,992.00 2,219.88
Mandor L.04 OH 0.015 157,992.00 2,369.88
JUMLAH TENAGA KERJA 62,036.16
B BAHAN
Semen portland (kg) Kg 6.340 1,150.00 7,291.00
Pasir pasang m3 0.012 271,600.00 3,259.20
JUMLAH HARGA BAHAN 10,550.20
C PERALATAN
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 122,992.00 265,662.72
Tukang batu L.02 OH 0.720 136,992.00 98,634.24
Kepala tukang L.03 OH 0.072 147,992.00 10,655.42
Mandor L.04 OH 0.011 157,992.00 1,737.91
JUMLAH TENAGA KERJA 376,690.30
B BAHAN
Bata merah buah 40.000 750.00 30,000.00
Semen portland (kg) Kg 44.000 1,150.00 50,600.00
Pasir pasang M3 0.070 271,600.00 19,012.00
Pasir beton M3 0.060 313,333.00 18,799.98
Koral beton M3 0.070 280,000.00 19,600.00
Besi beton polos Kg 1.600 10,650.00 17,040.00
JUMLAH HARGA BAHAN 155,051.98
C PERALATAN
JUMLAH HARGA ALAT
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 122,992.00 98,393.60
Tukang kayu L.03 OH 2.400 136,992.00 328,780.80
Kepala tukang L.03 OH 0.240 147,992.00 35,518.08
Mandor L.04 OH 0.040 157,992.00 6,319.68
JUMLAH TENAGA KERJA 469,012.16
B BAHAN
Kayu kelas II m3 0.024 5,890,000.00 141,360.00
Lem kayu Kg 0.300 45,000.00 13,500.00
JUMLAH HARGA BAHAN 154,860.00
C PERALATAN
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III Bentang 6M'
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 122,992.00 491,968.00
Tukang kayu L.03 OH 12.000 136,992.00 1,643,904.00
Kepala tukang L.03 OH 1.200 147,992.00 177,590.40
Mandor L.04 OH 0.200 157,992.00 31,598.40
JUMLAH TENAGA KERJA 2,345,060.80
B BAHAN
Kayu meranti (balok) m3 1.100 4,861,111.11 5,347,222.22
Besi Strip (2x3)cm kg 15.000 11,200.00 168,000.00
Paku 5 cm - 10 cm kg 5.600 19,660.00 110,096.00
JUMLAH HARGA BAHAN 5,625,318.22
C PERALATAN
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 122,992.00 24,598.40
Tukang kayu L.03 OH 0.300 136,992.00 41,097.60
Kepala tukang L.03 OH 0.030 147,992.00 4,439.76
Mandor L.04 OH 0.010 157,992.00 1,579.92
JUMLAH TENAGA KERJA 71,715.68
B BAHAN
Kaso-kaso (5 × 7) cm kayu mera m3 0.016 3,500,000.00 57,050.00
Paku 5 cm - 10 cm kg 0.250 19,660.00 4,915.00
JUMLAH HARGA BAHAN 61,965.00
C PERALATAN
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 122,992.00 8,609.44
Tukang cat L.02 OH 0.009 136,992.00 1,232.93
Kepala tukang L.03 OH 0.006 147,992.00 887.95
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 11,204.30
B BAHAN
Cat meni Kg 0.200 41,500.00 8,300.00
Plamir kayu Kg 0.150 28,400.00 4,260.00
Cat dasar kayu Kg 0.170 56,350.00 9,579.50
Cat kayu Kg 0.260 56,350.00 14,651.00
Kuwas buah 0.010 23,000.00 230.00
Pengencer Kg 0.030 28,000.00 840.00
Ampelas Lbr 0.200 6,850.00 1,370.00
JUMLAH HARGA BAHAN 39,230.50
C PERALATAN
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 122,992.00 8,609.44
Tukang cat L.02 OH 0.105 136,992.00 14,384.16
Kepala tukang L.03 OH 0.004 147,992.00 591.97
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 24,059.54
B BAHAN
Cat meni Kg 0.200 41,500.00 8,300.00
Plamir kayu Kg 0.150 28,400.00 4,260.00
Cat dasar kayu Kg 0.170 56,350.00 9,579.50
Cat kayu Kg 0.350 56,350.00 19,722.50
Kuwas buah 0.010 23,000.00 230.00
Pengencer Kg 0.030 28,000.00 840.00
Ampelas Lbr 0.200 6,850.00 1,370.00
JUMLAH HARGA BAHAN 44,302.00
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 122,992.00 2,459.84
Tukang cat L.02 OH 0.063 136,992.00 8,630.50
Kepala tukang L.03 OH 0.006 147,992.00 932.35
Mandor L.04 OH 0.003 157,992.00 473.98
JUMLAH TENAGA KERJA 12,496.66
B BAHAN
plamir tembok Kg 0.100 15,000.00 1,500.00
Cat dasar tembok Kg 0.100 20,000.00 2,000.00
Cat tembok Kg 0.260 31,600.00 8,216.00
JUMLAH HARGA BAHAN 11,716.00
C PERALATAN