List Pmi T1 2022 (Untul 26 Sept 2022)
List Pmi T1 2022 (Untul 26 Sept 2022)
Number of Results:37
Results Selected:37
Showing Result 1 to 37
File Document No Title RevisStatus Discipline Type Created By Date Modified Revision Date
Tower 1 : Angle Support untuk Checker PT. Putragaya
pdf PGW-STR-PMI-0307 Plate di Lt 58 Balcony 3 Issued for Construction STR-Structural Project Manager's Instruction Wahana 31/08/2022 08/08/2022
Tower 1 Campanile Beacon Top Floor PT. Putragaya
pdf PGW-STR-PMI-0365 Update 5 Issued for Construction STR-Structural Project Manager's Instruction Wahana 09/09/2022 08/09/2022
PT. Putragaya
pdf PGW-STR-PMI-0420 Tower 1 Stair ST1-15 Level 9 Modification 1 Issued for Construction STR-Structural Project Manager's Instruction Wahana 23/07/2022 18/07/2021
Perpanjangan Pemakaian TC1 dari 16
September 2021 sampai dengan 29th PT. Putragaya
PDF PGW-STR-PMI-0516 November 2021 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 03/01/2022 23/12/2021
PT. Putragaya
pdf PGW-STR-PMI-0518 Additional Access at Level 8 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 10/01/2022 05/01/2022
Tower 1 Coring Piping and Ducting PT. Putragaya
pdf PGW-STR-PMI-0520 Substation Level 1, 8, 9, 35 and 55 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 11/01/2022 06/01/2022
PT. Putragaya
pdf PGW-STR-PMI-0521 Grouting Pedestal Gondola Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 12/01/2022 11/01/2022
PT. Putragaya
pdf PGW-STR-PMI-0522 Lift P3A-P3B Structure Detail at Level 55 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 31/03/2022 11/01/2022
Close the Temporary Opening during Lift PT. Putragaya
pdf PGW-STR-PMI-0523 Installation at Level 3 and 35 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 17/01/2022 14/01/2022
PT. Putragaya
pdf PGW-STR-PMI-0524 Typical Lift Separator Beam and Column 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 25/01/2022 21/01/2022
Additional Plinth for Pump Room Level 55 PT. Putragaya
pdf PGW-STR-PMI-0525 and Level 35 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 27/01/2022 21/01/2022
Hacking and Grouting Slab GF for RWDP PT. Putragaya
pdf PGW-STR-PMI-0527 Pipe Route 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 28/01/2022 26/01/2022
Separator Column and Beam Lift HS2 PT. Putragaya
pdf PGW-STR-PMI-0531 HS3 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 03/02/2022 31/01/2022
Kolom Separator P1, P2 dan P3 Level 55 PT. Putragaya
pdf PGW-STR-PMI-0532 dan 56 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 11/02/2022 02/02/2022
Additional Plumbing Shaft and Coring PT. Putragaya
pdf PGW-STR-PMI-0536 Floor Drain Level 71 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 23/02/2022 18/02/2022
Tower 1 Penutupan Void di Slab Lantai 53 PT. Putragaya
pdf PGW-STR-PMI-0538 dan 54 dengan Cor 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 09/03/2022 04/03/2022
Additional Coring for Transfer RWDP Pipe PT. Putragaya
pdf PGW-STR-PMI-0544 at Level 56 and 56M Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 30/03/2022 22/03/2022
PT. Putragaya
pdf PGW-STR-PMI-0546 Hack dan Pasang Kembali Parapet 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 29/03/2022 29/03/2022
Podium Level 9 Coring and Grouting at PT. Putragaya
pdf PGW-STR-PMI-0551 Cooling Tower Floor 1 Issued for Construction STR-Structural Project Manager's Instruction Wahana 19/04/2022 19/04/2022
Coring/Hacking for Porous Pipe Green PT. Putragaya
pdf PGW-STR-PMI-0553 Plaza 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 19/04/2022 18/04/2022
Splice Connection WF 700x300 Level 1M PT. Putragaya
pdf PGW-STR-PMI-0554 Podium 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 19/04/2022 19/04/2022