Phase 1 - Thamrin 9 Development PT. Putragaya Wahana
Search Export To Excel
ProjePhase 1 - Thamrin 9 Development
Filter Type: Project Manager's Instruction, Discipline: STR-Structural, Block / Tower: Tower 1, Date Modified: 01/01/2022 - 26/09/2022, Super Search: PGW-STR-PMI-*
GeneMr Reynald Winardi, PT. Putragaya Wahana
GeneMonday, 26 September 2022 11:06:10 AM

Number of Results:37
Results Selected:37
Showing Result 1 to 37
File Document No Title RevisStatus Discipline Type Created By Date Modified Revision Date
Tower 1 : Angle Support untuk Checker PT. Putragaya
pdf PGW-STR-PMI-0307 Plate di Lt 58 Balcony 3 Issued for Construction STR-Structural Project Manager's Instruction Wahana 31/08/2022 08/08/2022
Tower 1 Campanile Beacon Top Floor PT. Putragaya
pdf PGW-STR-PMI-0365 Update 5 Issued for Construction STR-Structural Project Manager's Instruction Wahana 09/09/2022 08/09/2022
PT. Putragaya
pdf PGW-STR-PMI-0420 Tower 1 Stair ST1-15 Level 9 Modification 1 Issued for Construction STR-Structural Project Manager's Instruction Wahana 23/07/2022 18/07/2021
Perpanjangan Pemakaian TC1 dari 16
September 2021 sampai dengan 29th PT. Putragaya
PDF PGW-STR-PMI-0516 November 2021 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 03/01/2022 23/12/2021
PT. Putragaya
pdf PGW-STR-PMI-0518 Additional Access at Level 8 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 10/01/2022 05/01/2022
Tower 1 Coring Piping and Ducting PT. Putragaya
pdf PGW-STR-PMI-0520 Substation Level 1, 8, 9, 35 and 55 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 11/01/2022 06/01/2022
PT. Putragaya
pdf PGW-STR-PMI-0521 Grouting Pedestal Gondola Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 12/01/2022 11/01/2022
PT. Putragaya
pdf PGW-STR-PMI-0522 Lift P3A-P3B Structure Detail at Level 55 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 31/03/2022 11/01/2022
Close the Temporary Opening during Lift PT. Putragaya
pdf PGW-STR-PMI-0523 Installation at Level 3 and 35 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 17/01/2022 14/01/2022
PT. Putragaya
pdf PGW-STR-PMI-0524 Typical Lift Separator Beam and Column 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 25/01/2022 21/01/2022
Additional Plinth for Pump Room Level 55 PT. Putragaya
pdf PGW-STR-PMI-0525 and Level 35 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 27/01/2022 21/01/2022
Hacking and Grouting Slab GF for RWDP PT. Putragaya
pdf PGW-STR-PMI-0527 Pipe Route 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 28/01/2022 26/01/2022
Separator Column and Beam Lift HS2 PT. Putragaya
pdf PGW-STR-PMI-0531 HS3 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 03/02/2022 31/01/2022
Kolom Separator P1, P2 dan P3 Level 55 PT. Putragaya
pdf PGW-STR-PMI-0532 dan 56 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 11/02/2022 02/02/2022
Additional Plumbing Shaft and Coring PT. Putragaya
pdf PGW-STR-PMI-0536 Floor Drain Level 71 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 23/02/2022 18/02/2022
Tower 1 Penutupan Void di Slab Lantai 53 PT. Putragaya
pdf PGW-STR-PMI-0538 dan 54 dengan Cor 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 09/03/2022 04/03/2022
Additional Coring for Transfer RWDP Pipe PT. Putragaya
pdf PGW-STR-PMI-0544 at Level 56 and 56M Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 30/03/2022 22/03/2022
PT. Putragaya
pdf PGW-STR-PMI-0546 Hack dan Pasang Kembali Parapet 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 29/03/2022 29/03/2022
Podium Level 9 Coring and Grouting at PT. Putragaya
pdf PGW-STR-PMI-0551 Cooling Tower Floor 1 Issued for Construction STR-Structural Project Manager's Instruction Wahana 19/04/2022 19/04/2022
Coring/Hacking for Porous Pipe Green PT. Putragaya
pdf PGW-STR-PMI-0553 Plaza 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 19/04/2022 18/04/2022
Splice Connection WF 700x300 Level 1M PT. Putragaya
pdf PGW-STR-PMI-0554 Podium 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 19/04/2022 19/04/2022

Additional RD and Installation for Gutter of PT. Putragaya


pdf PGW-STR-PMI-0556 Ramp 1,2 and 3 Basement 1-3 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 18/05/2022 18/05/2022
Rain Water Installation at Level 58 Tower PT. Putragaya
pdf PGW-STR-PMI-0557 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 27/05/2022 12/05/2022

Tower 1 Temporer Curb and Waterproof PT. Putragaya


pdf PGW-STR-PMI-0558 Shaft Lift 03&04 Slooping Lantai 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 24/05/2022 24/05/2022
Perubahan Arah Tangga Chiller Room di PT. Putragaya
pdf PGW-STR-PMI-0560 Lantai 9 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 03/06/2022 30/05/2022
Additional Slab level 70M1 North and PT. Putragaya
pdf PGW-STR-PMI-0563 North East 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 03/06/2022 31/05/2022
PT. Putragaya
pdf PGW-STR-PMI-0567 Penutupan Lubang Dinding Pit Lift MZ4 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 20/06/2022 20/06/2022
PT. Putragaya
pdf PGW-STR-PMI-0568 Perimeter Curb di Level 9 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 21/06/2022 17/06/2022
Tower 1: Modifikasi Link Beam LB-2 Lt. PT. Putragaya
pdf PGW-STR-PMI-0570 70M1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 22/07/2022 11/07/2022
Coring untuk Riser Fire Protection Level PT. Putragaya
pdf PGW-STR-PMI-0575 70 - 71 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 04/08/2022 01/08/2022
PT. Putragaya
pdf PGW-STR-PMI-0579 Tower 1 Campanile Vertical Fin Support 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 19/08/2022 16/08/2022

Tower 1 : Penyesuaian Pedestal Terkait PT. Putragaya


pdf PGW-STR-PMI-0580 Perubahan Rel Gondola - Level 70 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 29/08/2022 22/08/2022

Tower 1: Pekerjaan Penambahan Facade PT. Putragaya


pdf PGW-STR-PMI-0582 Support di Lt.7 (as T1.1 - T1.A ~T1.A1) 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 07/09/2022 29/08/2022
Tower 1 : Penambahana Stiffener pada
Truss W4 dan W5 di Roof TErrace, PT. Putragaya
pdf PGW-STR-PMI-P03D-0025 Skydeck dan staircase 3 Issued for Construction STR-Structural Project Manager's Instruction Wahana 31/08/2022 23/08/2022
Tower 1 Roof Terrace, Skydeck and PT. Putragaya
pdf PGW-STR-PMI-P03D-0038 Staircase Layout 1 Issued for Construction STR-Structural Project Manager's Instruction Wahana 21/04/2022 21/04/2022
Access at Level 8 Hanging at Level 9 PT. Putragaya
pdf PGW-STR-PMI-P03E-0002 Tower 1 0 Issued for Construction STR-Structural Project Manager's Instruction Wahana 16/02/2022 10/02/2022
Genset Structural Drawing Between T9 PT. Putragaya
pdf PGW-STR-PMI-P03F-0001 and Chubb Square 1 Issued for Construction STR-Structural Project Manager's Instruction Wahana 07/02/2022 03/02/2022