PRESUPUESTA DE OBRA 1 CALIDAD

P.B. 1P 2P TOTAL
SUP. DE CONST. 125.54 131.46 127.3
57,748.40 60,471.60 58,558.00 176,778.00

PRESUPUESTA DE OBRA 2 CALIDAD


P.B. 1P 2P TOTAL
SUP. DE CONST. 125.54 131.46 127.3
52,726.80 55,213.20 53,466.00 161,406.00

PRESUPUESTA DE OBRA 3 CALIDAD


P.B. 1P 2P TOTAL
SUP. DE CONST. 125.54 131.46 127.3
50,216.00 52,584.00 50,920.00 153,720.00