You are on page 1of 2
awe" UNIFIED WANDERER ENGINEERING SDN BHD 73; Jalan Pendamar 27/90, Seksyen 27, 40400 Shah Alam, Selangor, Malaysia (co. 615511) Timur Tol :1700 814 666 Fax: +603 5879 9611 email unifiedwanderer@gmall.com Sonya Teoge Reid - eh ow Temi eles ub tin eeupmetadng= aon «olor -rsttnanes «per inlostaton «mb = mace ren ans poe fr alan afin wes QUOTATION ois TWADAN PENGURUSAN BERSAMA ARTE SUBANG WEST four ner [assoena2 MANAGEMENT OFFICE, [Dae [anraaz2 Jlan Boling Padang, Scksyen 13 [Page @ [OF dt is as) 40100 Shah Alam [Drawing No. [ni ‘Tel: 03~5480 8300 [Doc ref [Autention Mr. Steven Cho Me O17.614 2381 RE: Electrical Installation- Ventilation Fan $B-FAK, SBSSH-1, SB-SSF2, SBSSH3, SB-SST-4 Reference made to above mentioned subject, pleased find below as pe ur proposed quotation for your reference and persal= tem Dese ‘Qty [YOM] Unie Price | Total Prise 1 [To dismantle existing defects unit and supply new components with ‘unit [4,120.00 4,120.00 lprovide manpower to replace at existing SB-FAF, consist of- LL |Ix LS ABS203e 150A 37kA 3Pole MCB elw 240V Shunt tip 12 [5x LS ABS60e 100A 18kA 3Pole MCCB 13 |x Mikro NX202A Barth Fault Relay 14 [2x SKL Fuse Canter cw 6A Fuse Link 1 |Lx intemal wiring ew acessories 2 |To dismantle existing defects unit and supply new components with | 4 |unis] 9,035.00 36,140.00 [provide manpower to replace at existing SB-SSEI,2,344, consist of 21 |4x IIKW 240VAC Auto-transformer 22 |Ix LO0A 18kA 3Pole MCCB 23 [20x 32A AC-3 Contactor e/w Aux. Contact 2a [4x 20-32A TOR 25 |4x 32A 6kA 3Pole MCB 26 [ax HBIA-8C AC220-240 5M Timer 2.7 [3x SKL Fuse Carver elw 6A Fuse Link 28 [ax MK3P L1Pin 240 Relay ohv elay base 29 |x 24Hirs Time Switeh 0] 16x LED Pilot Lamp 2.11]16x Pushibutton 2.12 |tx 168 3P AlONM Selector Switeh 2.13 fx Internal witing ch accessories Total Amount: RM | 40,260.00 ‘Terms and conditions 1 Remasks + Total price subject to final quantity lengths or scope of works been competed and subjest to change 2 Purchase order ‘We require an official purlase order before we proce 3 Delivery time Approx. | to 2 weeks for completion of works. 4 Temof Payment: Within 30 days upon completion of works. 5 Validity 14 days fom date hereon otherwise reconfim with us ‘We look forwacd to receive your favorable respond and eontirmation Please de not hesitate to contact us or the undersigned should you required any furnee information. Thank You Regards, Unified Wanderer Engineering Sdn Bhd ‘Sam Lim (11/P: 012-382 1666) email: uwesb.sam@gmail.com /samlin1666@xmail.com Location Damages: ayy: Source of Damages: “Type of Damage: Before Repair After Repair Basement B1, 82, B3, 84 Ventilation Fan Panel- S8-FAF, SB-SSF-1, SB-SSF-2, SB-SSF-3, SB-SSF-4 Sunits Primarily Flood Water depth (in feet) 10 feats Major Based on the damages, the equipment is currently Unusable Contents: Inspection on 1 no x Sub-Board Ventilation Fan and 4 nos x Ventilation Fan Control Panel found water mark at whole panels of insulation frame. The internal parts such as circuit breaker, protective relays, MCCB's, timers, contactor autetrans, auxiliary switch, counter and all internal wiring with signage and ‘evidence from flooding, Whole panels covered with mud, sand, water & dust.

You might also like