SAT.= CHECK AND CLEAN GRINDER HAMMER MILL AND CLEAN FILTER. CHECKING AND CLEAN MAIN
MIXER.CHECK AND CLEAN ABOVE FACTORY. ARRANGE MOTOR GEARBOX SCREW CONVEYOR
SOYA SILO 5 AND INSTALLATION. WELDING ALBAYAD BLKR AND AMARAJ BLKR.INSTALLATION
DIESEL TANK BLKR #2.ADJUST MOTOR GEARBOX CORN CHAIN CONVEYOR DAWNSIDE AREA
SUN.= CHECK AND CLEAN GRINDER HAMMER MILL. CHECKING BCKT ELEVETOR GRINDER AND
CUANGE
DAMAGE BCKT.CHECKING BCKT ELEVETOR STORAGE. CHECK AND CLEAN ABOVE FACTORY.
WELDING
AND FABRICATE COVER WATER WASTE DRAINAGE BOILER AREA CHECKING CHAIN CONVEYOR
SOYA
WELDING BLKR AMARAJ AND WELDING BRACKET HOLDER AIR TANK TRUCK ABRAHIM DRIVER.
MON.= CHECK AND CLEAN GRINDER HAMMER MILL. CHECK AND CLEAN ABOVE FACTORY. ARRANGE
SCALE WEIGHT TANK FOR SOYA OIL BEAN.REMOVE FOR WASTE WATER FOR STORAGE TANK
BOILER
MOTOR CORN SILO 2.CHANGE BELT MOTOR EXHAUST FAN WAREHOUSE STORAGE. TRANSFER
SOYA OIL
TUE.= CHECK AND CLEAN GRINDER HAMMER MILL. CHECK AND CLEAN ABOVE FACTORY. CHECKING
CHAIN
CONVEYOR CORN DAWNSIDE AREA. CHECKING CHAIN CONVEYOR ABOVE SOYA SILO5/6 AND
FINAL
AND FABRICATE COVER WATER WASTE DRAINAGE BOILER AREA CHANGE AIR REGULATOR
TRAP .
WED.= CHECK AND CLEAN GRINDER HAMMER MILL. CHECK AND CLEAN ABOVE FACTORY. CHECKING
CHAIN
CONVEYOR DAWNSIDE GRINDER HAMMER MILL. WELDING HOLE SILO 8 BLKR LOADING AREA.
PUT COVER
ROFFSHEET STORAGE MATERIALS HOPPER CONCENTRATE BCKT ELEVETOR AREA.CEMENT
POST FOR PERI-
METER FENCE.WELDING AND FABRICATE COVER WATER WASTE DRAINAGE BOILER AREA.
THU.= CHECK AND CLEAN GRINDER HAMMER MILL. CHECK AND CLEAN ABOVE FACTORY. CHECKING
BCKT