Get laying list from the office. laying list must
be follow Check the slope and purlins spacing if complying in CSC Standards. LTGL must be 3” to 4” Use nylon string as a guide line for the alignment of panel Make partial screw and make full tecksrew after all panel was laid. All sidelap and first purlins must be full screw. See screw lay-out of screw per profile.
TEKSCREW PATTERN FOR CS SUPREME TEKSCREW PATTERN FOR CS TWIN-V50
TEKSCREW PATTERN FOR CS ORDCORR
2 ½ ORDCORR LAPPING DETIAL
2½
1 ½ ORDCORR LAPPING DETIAL
1½ Note:
1 ½ Ordcorr lapping recommended use for
under sheeting roof and 2 ½ for primary roof.
DETAIL-A
Note:
Use 2” Lapping if 24” gutter width and 4” if 24”
above width. Use blind rivets 5/32 x ½ spaced @ 1 ½ “ for fixing of gutter joinst. Note:
Use Type-S spaced @ 0.60m to fasten the flashing
with roofing panel. The lapping of flashing should be 4”min Fix the lapping of flashing by Blind rivets 5/32 x ½ spaced @ 1 ½ “
DETAIL-B
Note:
Use Type-S spaced every rib to fasten the Ridge
Roll with roofing panel. The lapping of Ridge Roll should be 4”min Fix the lapping of Ridge Roll by Blind rivets 5/32 x ½ spaced @ 1 ½ “