You are on page 1of 6

NAME OF PROJECT : "MOSTAFA RESIDENCE"

PROPOSED 7 STOREY (3B+G+6) RESIDENTIAL BUILDING

PROJECT LOCATION : PLOT NO- 02, ROAD NO- 01, BLOCK- K, BARIDHARA, DHAKA

DRAWING TITLE : SHORE PILE DRAWING

STRUCTURAL CONSULTANT : INTER SPACE LIMITED


Structure for Safety

NAME OF PROJECT OWNER : TANVEER AHMED MOSTAFA


3-STORIED BUILDING

2200
BH-3

BH-4

8400

BORE HOLE LOACATION PLAN


BH-5
6-STORIED BUILDING

8400

3000 1500 5100 6100 1500


2-STORIED BUILDING
2200
BH-2

BH-1

6000
R

STRUCTURAL CONSULTANT DESIGN ADVISOR & CHECKED BY STRUCTURAL DESIGN ENGINEER DISCLAIMER
"MOSTAFA RESIDENCE"
S PROPOSED 7 STOREY (3B+G+6) RESIDENTIAL MD. RIFAT RAHMAN
INTER SPACE LIMITED This is to declare that
PROJECT

BUILDING AT PLOT NO -2, ROAD NO -1, DHK :Flat-A2, House - 61, Road - 8, A.A. HOSSAIN (RIZVI) PE the dedicated signatory will
BLOCK -K, BARIDHARA, DHAKA Block - F, Banani, Dhaka-1213 CAD - ABU NAYEM not be held liable for any
Tel: 01755 680 889, 01798 033 670
FIEB-6675, DMINB-CE-0020 design beyond the Rajuk/CDA
01 CTG:1000/A, CDA Avenue.East Nasirabad, ID/JOB NO: ISL/S/21/010
CDA-0124 approved drawings
CLIENT

Chittagong- 4000 Tel: 031-655730,01730 300 472


TANVEER AHMED MOSTAFA E-mail: ispacebd@gmail.com DATE: 12-12-2021
SUB SOIL INVESTIGATION REPORT

design beyond the Rajuk/CDA


the dedicated signatory will
LITHOLOGICAL DESCRIPTION

DISCLAIMER

not be held liable for any


LEVEL BORE HOLE-1 BORE HOLE-2 BORE HOLE-3 BORE HOLE-4 BORE HOLE-5

This is to declare that


Description and Soil Classification

approved drawings
E.R.L = ± 0.00mm Field SPT Field SPT Field SPT Field SPT Field SPT

8 10 8 10 8
Level=(-)1.5m

Yellowish Brown, medium stiff to

DESIGN ADVISOR & CHECKED BY STRUCTURAL DESIGN ENGINEER


23 12 13 21 17
Level=(-)3.0m very Stiff, Lean Clay, (CL)

12 15 10 18 11

ID/JOB NO: ISL/S/21/010


Level=(-)4.5m

MD. RIFAT RAHMAN

CAD - ABU NAYEM

DATE: 12-12-2021
10 12 9 14 12
Level=(-)6.0m Light Brown, loose to medium dense,
Silt (ML)
13 11 10 10 11
Level=(-)7.5m

14 10 13 26 16

A.A. HOSSAIN (RIZVI) PE


Level=(-)9.0m

FIEB-6675, DMINB-CE-0020
18900

16 14 11 16 15
Level=(-)10.5m

Brown Stiff to very stiff,


11 17 14 15 16
Lean Clay (CL)

CDA-0124
Level=(-)12.0m

10 13 16 9 13
Level=(-)13.5m

SPACE LIMITED

Chittagong- 4000 Tel: 031-655730,01730 300 472


18 13 20 18 17

STRUCTURAL CONSULTANT
Level=(-)15.0m

CTG:1000/A, CDA Avenue.East Nasirabad,


DHK :Flat-A2, House - 61, Road - 8,
24 19 25 24 19

Tel: 01755 680 889, 01798 033 670


Level=(-)16.5m

Block - F, Banani, Dhaka-1213

E-mail: ispacebd@gmail.com
37 32 34 42 23
Level=(-)18.0m

INTER
Brown to Grayish Brown,
29 27 20 22 20
Level=(-)19.5m medium dense to dense, Silt (ML)
SHORE PILE
LONG SECTION
27 23 16 19 15
Level=(-)21.0m

22 20 19 21 21
Level=(-)22.5m

PROPOSED 7 STOREY (3B+G+6) RESIDENTIAL


19 21 22 21 24

BUILDING AT PLOT NO -2, ROAD NO -1,


Level=(-)24.0m

"MOSTAFA RESIDENCE"

TANVEER AHMED MOSTAFA


Brown very stiff, Fat Clay (CH)

BLOCK -K, BARIDHARA, DHAKA


16 24 21 23 32
Level=(-)25.5m

24 25 20 26 41
Level=(-)27.0m Brown to Yellowish Brown,
medium dence, Silt, (ML)
32 24 23 25 27
Level=(-)28.5m
PROJECT CLIENT

Yellowish Brown, hart, Fat Clay, (CH) 31 36 24 28 28

02
S
Level=(-)30.0m
A
B
C
D

A'
C'
D'
21646
1450 2022 5150 6588 1550 1452 1984 1450

525
2398

600 600 60
0 600 650
650
2027 588
1b

650 650 65
0 650 650
650 650 650

525 650 650 65


0 650 650

182
650
3362

4
2768

2520

1323

891
1a

428
2084

588 588 588 588 650 650 650


1

1350

650 650 650 650 650 650 650


1c

900
2

1919

NUMBER OF SHORE PILE= 143


2a

SHORE PILE LAYOUT PLAN


1419
2b

836
2c
29217
2250
2d

5576
3

650 650 650 650 650 650 650


900
3a

1350
4

3923

4152

4319
4391

5258

5852
650 650 650 650

6674
4a

1544

14 1

650 650 65
650 9

0 650 650
650
650 650 65
526
0 650 650
650
650 650 650 687 687 687 687

650 650 65
0 594 594
158

594 594
7

2547

STRUCTURAL CONSULTANT DESIGN ADVISOR & CHECKED BY STRUCTURAL DESIGN ENGINEER DISCLAIMER
"MOSTAFA RESIDENCE"
S PROPOSED 7 STOREY (3B+G+6) RESIDENTIAL MD. RIFAT RAHMAN
INTER SPACE LIMITED This is to declare that
PROJECT

BUILDING AT PLOT NO -2, ROAD NO -1, DHK :Flat-A2, House - 61, Road - 8, A.A. HOSSAIN (RIZVI) PE the dedicated signatory will
BLOCK -K, BARIDHARA, DHAKA Block - F, Banani, Dhaka-1213 CAD - ABU NAYEM not be held liable for any
Tel: 01755 680 889, 01798 033 670
FIEB-6675, DMINB-CE-0020 design beyond the Rajuk/CDA
03 CTG:1000/A, CDA Avenue.East Nasirabad, ID/JOB NO: ISL/S/21/010
CDA-0124 approved drawings
CLIENT

Chittagong- 4000 Tel: 031-655730,01730 300 472


TANVEER AHMED MOSTAFA E-mail: ispacebd@gmail.com DATE: 12-12-2021
design beyond the Rajuk/CDA
the dedicated signatory will
DISCLAIMER

not be held liable for any


This is to declare that

approved drawings
NOTES FOR SHORE PILE CONSTRUCTION

DESIGN ADVISOR & CHECKED BY STRUCTURAL DESIGN ENGINEER

ID/JOB NO: ISL/S/21/010


MD. RIFAT RAHMAN
1. 28 days cylinder strength of concrete should be ≥3,000 psi

CAD - ABU NAYEM

DATE: 12-12-2021
2. Yield strength of steel rebars should be ≥60,000 psi

3. Piles should be cast alternately

A.A. HOSSAIN (RIZVI) PE

FIEB-6675, DMINB-CE-0020
4. Pile shall not be bored from an adjacent pile less than 48 hours

5. Shingles and coarse sand should be used for concreting

CDA-0124
6. Use potable water for concrete mixing

SPACE LIMITED
7. Slump should be in the range 150mm (6") to 200mm (8")

Chittagong- 4000 Tel: 031-655730,01730 300 472


STRUCTURAL CONSULTANT

CTG:1000/A, CDA Avenue.East Nasirabad,


8. Admixture should be used for obtaining good concrete

DHK :Flat-A2, House - 61, Road - 8,

Tel: 01755 680 889, 01798 033 670


Block - F, Banani, Dhaka-1213

E-mail: ispacebd@gmail.com
9. Vertical alignment of the piles should be strictly ensured

INTER
10. Spiral must be spot welded to main vertical alternate rebars

11. Spacer MS bar to be welded to main bar to facilitate clear cover 38mm(1.5") around the steel cage

12. After completion of bore hole, it must be washed at least 45 min with clean water received from seperate chamber

PROPOSED 7 STOREY (3B+G+6) RESIDENTIAL


BUILDING AT PLOT NO -2, ROAD NO -1,
13. All the weldings should be done by certified welders

"MOSTAFA RESIDENCE"

TANVEER AHMED MOSTAFA


BLOCK -K, BARIDHARA, DHAKA
14. Use bentonite suspension to stabilize the sides of bore hole in case of granular soil

PROJECT CLIENT

04
S
design beyond the Rajuk/CDA
the dedicated signatory will
DISCLAIMER
NOTE:- FERROCEMENT CONSTRUCTION TO BE CARRIED OUT STEP BY STEP ALONG WITH THE EARTH EXCAVATION WORKS

not be held liable for any


This is to declare that

approved drawings
Indicator bar
Earth Side Excavation Side Existing road level, L = ± 0.00mm Earth Side Excavation Side
500

900
900

DESIGN ADVISOR & CHECKED BY STRUCTURAL DESIGN ENGINEER


10mmØspiral@200c/c
LEGEND:
3-20mmØst 3-20mmØst
3-10mmØ@1500c/c spacer 20mmØst
20mmØext (L=12m)
38 38

ID/JOB NO: ISL/S/21/010


3-20mmØst (L=12m) 3-10mmØ@1500c/c spacer1st Bracing L= -2300mm 20mmØext (L=4m)

MD. RIFAT RAHMAN


3-20mmØst (L=12m) SECTION (1-1)

CAD - ABU NAYEM


3000
20mmØext (L=6m)

DATE: 12-12-2021
3600

10mmØspiral@200c/c
1st basement floor, L= -3000mm
20mmØext (L=8m)

4800
1 1 10mmØ
Earth Side Excavation Side
500
10mmØspiral@150c/c
4-20mmØext (L=4m) 2-20mmØext (L=12m)
650 650
2-20mmØext(L=6m) 3-20mmØst 3-20mmØst 150 150
1200

A.A. HOSSAIN (RIZVI) PE


2-20mmØext (L=6m) 3-10mmØ@1500c/c spacer Earth Side

3000
Excavation Side

FIEB-6675, DMINB-CE-0020
38 38
2 2 SECTION (2-2) Ferrocement
4-20mmØext(L=4m) 2-20mmØext(L=12m)
PILE SPACING DETAILS
12000

12000

Earth Side Excavation Side

CDA-0124
3 3 500
4000

2nd Bracing L= -7900mm Fillet Welding


10mmØspiral@150c/c

10mmØspiral@150c/c
3-10mmØ@1500c/c spacer (Both Side)
2-20mmØext (L=12m)

50
4-20mmØext (L=4m) X X
3800

2nd basement floor, L= -9000mm 3-20mmØst 3-20mmØst Fillet Welding

SPACE LIMITED
500
Both Side

50
2-20mmØext (L=6m) 2-20mmØext (L=8m)

50
18900

50

Chittagong- 4000 Tel: 031-655730,01730 300 472


7800
38 38

STRUCTURAL CONSULTANT
2-20mmØext(L=8m) SECTION (3-3) DETAIL- X SECTION X-X

CTG:1000/A, CDA Avenue.East Nasirabad,


800

DHK :Flat-A2, House - 61, Road - 8,

Tel: 01755 680 889, 01798 033 670


Block - F, Banani, Dhaka-1213
Earth Side Excavation Side

E-mail: ispacebd@gmail.com
500
Welding
4 4 500
10mmØspiral@150c/c
3000

2800

Mat Level= -12300mm 2-20mmØext (L=12m)


2-20mmØext (L=6m)

INTER
500

3-20mmØst 3-20mmØst
500

DETAIL-X
2-20mmØext(L=6m) 3-10mmØ@1500c/c spacer 2-20mmØext (L=8m) DETAIL-A (LAPPING DETAILS)
Dredging level= -13500mm
38 38
to be compacted SECTION (4-4) DETAIL-E
1400

SPACER DEVICE
75
38
10mmØspiral@200c/c

Earth Side Excavation Side

50
77
6000

6000

1000

500 50

PROPOSED 7 STOREY (3B+G+6) RESIDENTIAL


10mmØspiral@200c/c
4900

45° 135°
3-20mmØst (L=6m) 3-20mmØst (L=6m)

BUILDING AT PLOT NO -2, ROAD NO -1,


50
77
800

45°135°

"MOSTAFA RESIDENCE"

TANVEER AHMED MOSTAFA


3-20mmØst 3-20mmØst

BLOCK -K, BARIDHARA, DHAKA


50
3-10mmØ@1500c/c spacer 3-10mm Spacer

50
5 5 @ 1500 c/c 38
38 38
1700

77

SECTION (5-5) 10mm Spacer

77
500

REBAR CURTAILMENT DETAIL REBAR CURTAILMENT DETAIL 75


(Earth Side) (Excavation Side)
SECTION OF SHORE PILE
(slab & bracing level are shown for clarity ) DETAIL-E
PROJECT CLIENT

05
S

You might also like