Professional Documents
Culture Documents
Bow Ict 10 - CSS
Bow Ict 10 - CSS
BUDGET OF WORK
PERFORMANCE
WEEK # CONTENT CONTENT STANDARD LEARNING COMPETENCIES CODE
STANDARD
FIRST QUARTER:
WEEK 1 Types and parts of computers The learners demonstrate The learners shall be able 1.1 Plan unit assembly to ensure OHS policies and TLE_IACSS9-
Computer operating systems an understanding of to install and configure procedures are followed in accordance with 12ICCS-Ia-e-
Windows / MAC OS X /Linux concepts and principles in computer systems based systems requirements 28
Peripheral devices installing configuring on established procedures 1.2 Prepare unit assembly to ensure OHS policies and
Computer systems design computer systems. and system requirements. procedures are followed in accordance with
WEEK 2 & 3 Computer assembly systems requirements
procedures 1.3 Identify materials necessary to complete the work in
Power ON self-test and basic- accordance with established procedures and check
input-output-system (BIOS) against system requirements
configuration procedures 1.4 Obtain materials necessary to complete the work in
WEEK 4 CMOS accordance with established procedures and check
Motherboards against system requirements
WEEK 5 Multimedia storage devices: 1.5 Obtain tools, equipment and testing devices needed
o Video cards to carry out installation work in accordance with
o Sound cards established procedures and check for correct
Graphical user interface operation and safety
1.6 Assemble computer hardware in accordance with
established procedures and system requirements
1.7 Perform BIOS configuration in accordance with
hardware requirements
WEEK 6 Installers preparation and OS The learners demonstrate The learners shall be able 2.1 Create portable bootable devices in accordance TLE_IACSS9-
installation procedures an understanding of to install and configure with software manufacturer instruction 12ICCS-If-j-29
WEEK 7 Application and devices/drivers concepts and principles in computer systems based 2.2 Prepare customized installers in accordance with
installation procedures installing configuring on established procedures software utilization guide and end user agreement
WEEK 8 Desktop PC interface/ hook up computer systems. and system requirements. 2.3 Carry out installation of portable applications in
procedures accordance with software user guide and software
WEEK 9 Application packages and use license
of application programs
WEEK 10 Bootable devices
o CD/DVD bootable
o USB bootable using Rufus
software
o USB bootable using
diskpart/CMD
Software installers
SECOND QUARTER:
WEEK 1 – 5 Installation of Operating System The learners demonstrate The learners shall be able 3.1 Install Operating System (OS) in accordance with TLE_IACSS9-
o Windows Server an understanding of to install and configure established installation procedures and to comply 12ICCS-IIa-j-
2008/higher version concepts and principles in computer systems based with end-user requirements 30
o Windows XP/7/8/10 installing configuring on established procedures 3.2 Install peripherals/ devices in accordance with
computer systems. and system requirements. manufacturer’s instructions and/ or OS installation
WEEK 6 – 7 Install and configure of procedures
peripherals devices 3.3 Configure peripherals/ devices in accordance with
manufacturer’s instructions and/ or OS installation
WEEK 8 – 9 Install /Update Operating system procedures
3.4 Access OS and drivers updates/ patches in
WEEK 10 Checking of work accordance with manufacturer’s recommendations
and requirements
3.5 Install OS and drivers updates/ patches in
accordance with manufacturer’s recommendations
and requirements
3.6 Check the quality of the work undertaken in
accordance with established procedures
THIRD QUARTER:
WEEK 1 Installation of applications The learners demonstrate The learners shall be able 4.1 Install Application Software based on software TLE_IACSS9-
software with different variations an understanding of to install and configure installation guides, end-user requirements and 12ICCS-IIIa-e-
concepts and principles in computer systems based software license agreement 31
WEEK 2 Software updates installing configuring on established procedures 4.2 Carry out variation to application software in
computer systems. and system requirements. accordance to customer/ client requirements
WEEK 3 Virtualization software 4.3 Access software updates in accordance with
Disk management software manufacturer’s recommendations and
requirements
WEEK 4 Antivirus / diagnostic software 4.4 Install software updates in accordance with
manufacturer’s recommendations and
requirements
WEEK 5 Device drivers
Drivers/Software update
procedures
o Application software license
agreements
o Stress-testing procedures
- 5S and 3Rs environmental
policies
WEEK 6 & 7 Burning or testing installed 5.1 Test devices/ systems and/or installation to TLE_IACSS9-
equipment/devices determine whether it conforms to requirements 12ICCS-IIIf-
5.2 Conduct stress test to ensure reliability of j-32
WEEK 8 Stress test equipment in accordance with manufacturer’s
o Processor instructions and system requirements
o Memory 5.3 Follow 5S and 3Rs according to environmental
o Hard Disk policies
o Video Card 5.4 Follow procedures in forwarding documentation to
appropriate personnel and/or authority on the test
WEEK 9 5S and 3Rs environmental conducted.
policies
Prepared by:
MARICHU J. MAMON
Teacher I
Marbel 7 National High School