‘AL HASHEMI, PLANNERS, ARCHITECTS, ENGINEERS eatchiialnagsoo Ub ‘PROJECT: Construction, Malntonance & Guarantee of gcTACTHE LLC foo (38) Development of Pot WI8 at Dubai Alport Free Zone for ean Wis Dubal Arpt Fre Zone (DAFZA) eat ‘TECHNICAL SUBMITTAL ROUT fachnical Subntal No! RAGROATIVS-O0T8 Rav OF als Duds Aiport Free Zona (DAFZA) loate: 25.83.18 |AHesham), Pannors,Achtects, Engineers Iciassitcation: cat RAG Contacting Lic. [Prev Submita Ne: RAGIROUZTIVS-0018 Rew 0 |Sub-Contractor: foae: a2018 Mathod Statement for Casting Columns, Corea Approval Requested For preter Gaeta ‘Shearwals and Retaining Wall ao a eee contact documents copy auached: ves Jatachment [SubsGoniactors Poke Mananer. aier ane sie“) oat pet steers ae AB — ees ‘STATUS. [SSPROVED Zi oo : fapeROvED AS NOTED | 7S - Xa Pee ae aT ee cee a INOT APPROVED aca: ie eer oma i & os Stans fer insta Walten7 £ ecto 2G Gaye eyes Ae pa con siolersel i eas equ re a (COMMENTS: |xePROVED AS NOTED REVISE AND RESUBMIT | INOT APPROVED e Signature: ate _/ [atta a eT Rae ea To TT HG Wa reve do eave Hi coacorFo lcs wl aa TENET ae eta i eke eal rman ih des cet et lua corre waht nbion ren nba Ci ; (26 hye dol? | Ne“ a U Sonat eco ‘on Rene Resist SootacorRecat || 2 9 ie prepa [2.00 BY: BaP Ofte rated snes) RAG-ROUTZT-MS-C018-Rewct DATE: IRPC 2%. a 26.08.2018 METHOD STATEMENT FOR port SOSUNENT NS: CASTING COLUMNS, COREWALLS, exe) ALHASHEM ‘SHEAR WALLS AND RETAINING | | gojowflttial WALL Ms-C - 013 PROJECT NAME: PROPOSED 2B+G+2P+7+R OFFICE BUILDING. PROJECT: PROPOSED 2B+G+2P+7+R OFFICE BUILDING PLOT NO: DAFZA-W14 CLIENT: M/S DUBAI AIRPORT FREE ZONE CONSULTANT: M/S ALHASHEMI PLANNERS ARCHITECTS ENGINEERS CONTRACTOR: M/S RAQ CONTRACTING CO L.L.C Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall PROJECT NAME: DATE: PROPOSED 2B+G+2P+7+R OFFICE BUILDING IN DAFZA-W14 26.08.2018 METHOD STATEMENT FOR FREI DOCUMENT NO: CASTING COLUMNS, COREWALLS, SHEAR WALLS AND RETAINING | | yjooialil Ms. ¢ - 013 WALL Table of Contents l Revisions Status 2 Scope/Objectives a References 4. Health and Safety Hazards 5. Responsibilities 6 Procedures /Method to be Employed 7. Tolerance 8 Manpower Requirements Material Requirements 10, Equipment Requirements ee Health and Safety Provisions 12. Q.C Approvals and other Documentation 13. Site Safety Engineer’s Approval ‘Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall PROJECT NAME: PROPOSED 2B+G+2P+7+R OFFICE BUILDING IN DAFZA-W14 Dubai METHOD STATEMENT FOR Hoe CASTING COLUMNS, COREWALLS, SHEAR WALLS AND RETAINING | yu jjipléthiol WALL DOCUMENT NO: Ms-C -013 1.0 REVISIONS STATUS Revision Reviewed | Description of No. | Date _| Originator By Approved By Sabmttial 00 | 28.07.2018 on 26.08.2013} = LP hy Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall PROJECT NAME: pan PROPOSED 2B+G+2P+7+R OFFICE BUILDING IN DAFZA-W14 BA friihall RRA 26.08.2018 le METHOD STATEMENT FOR FREI BAW | pocument no: CASTING COLUMNS, COREWALLS, Freeme| ©=ALHASHEMIL SHEAR WALLS AND RETAINING | yn jgiplithiol MS-C - 013 WALL 20 3.0 4.0 5.0 SCOPE, PURPOSE & OBJECTIVE The scope of this method statement covers construction of Columns and wall. The purpose of the documentation emanating from this statement is to ensure that quality control objectives are maintained and accurate records are established for all related activities. The objective is to ensure that the construction plan is executed, controlled and documented in compliance with the contract drawings and specifications. REFERENCES Contract Specifications (Section 03 11 00, 03 20 00, 03 30 00) Contract Drawings Program of Works Material & Drawings Submittal Schedule HEALTH AND SAFETY HAZARDS Specific safety measures have to be followed as applicable. All safety measures are covered separately in the project safety plan, RESPONSIBILITIES 5.1 Project Manager should ensure: ‘© The Columns and wall works activities are carried out according to specifications and drawings. © Work progress is carried out according to the planned program and all the equipment required to execute the works are available as per the project planning and are in good condition. © Coordination with the Consultant, Site Engineer, Safety Engineer and Subcontractors for the safe and proper execution of the work. * Specific attention is paid to all safety measures and quality control in coordination with. Safety Engineer and QC Engineer and in line with HSE plan and Quality plan. 5.2. Project Engineer should ensure: © The Columns and wall works activities are carried out according to the specifications and crawings. © Provision of all necessary information and distribution of responsibilities to his construction team. ‘© ‘The work progress is monitored in accordance with the required program and reports the same to the Project Manager. Method Statement for Casting Columns, Corewalls, shear walls and retai ng Wall PROJECT NAME: DATE: PROPOSED 2B+-G+2P+7+R OFFICE BUILDING IN DAFZA-W14 { IRA 26.08.2018 iil METHOD STATEMENT FOR BSW | pocunent no CASTING COLUMNS, COREWALLS, ALHASH=MI SHEAR WALLS AND RETAINING — | 2/boi; Ms-C-013 WALL © Coordination with the Safety Engineer to ensure that the works are carried out in a safe ‘working atmosphere. © Coordination with the QC Engineer for tests to be carried out and initiate for the inspection for the finished works. The implementation of any request that might be raised by the Consultant. Efficient daily progress has been obtained from all the equipment and manpower ‘engaged in the work and check the same against the daily report received from the Foremen. ‘© The passage of all the revised information to the Foremen and ensure that it's being carried out properly. © Coordination with the surveyor and plan the survey works in advance as per the work sequence. 5.3 QA Engineer should ensure: © The carrying out of the works as per the specifications and the related quality procedures. ‘© Inspection of the completed works and requesting for the Consultant's approval © Maintenance of complete inspection and test records for any further reference, 5.4 Safety Engineer should ensure: © The implementation of all safety measures in accordance with the HSE plan and that the whole work force is aware of its proper implementation. ‘© The implementation of safety measures is adequate to maintain a safe working environment on the site. ‘© Inspection of all the site activities and training personnel in accident prevention and its proper reporting to the Project Manager and the Consultant. © The site is maintained in a clean and tidy manner. 5.5 Forman should ensure: © The carrying-out the work and the proper distribution of all the available resources in coordination with the Site Engineering on a daily basis. ‘© Daily reports of the works are achieved and coordinated for the future planning with the site Engineer. Incorporate all the QC and Safety requirements as requested by the concerned Engineer. Meeting with any type of unforeseen incident or requirement and reporting the same to the Site Engineer immediately. ‘Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall PROJECT NAME: DAT) PROPOSED 2B+G+2P+7+R OFFICE BUILDING IN DAFZA-W14 26.08.2018 METHOD STATEMENT FOR DOCUMENT NO: CASTING COLUMNS, COREWALLS, ‘SHEAR WALLS AND RETAINING WALL Ms. C- 013 6.0 PROCEDURE / METHOD TO BE EMPLOYE! Setting out and Preparatory Works ‘© All the work will be set (or) positioned by the Surveyor as per the design drawings for consultant's approval. ‘© The coordinates shall be measured from grid lines by RAQ and then approved from consultant to proceed fixation of steel. © The concrete area around column shall be chipped and the loose particles must be blown away from compressor. ‘© Old concrete deposited on the rebars shall be removed completely and the concrete junction shall be treated with the bonding agent. ‘© Scaffolding shall be provided around the columns with the planks were necessary for the steel fixers to install and fabricate bars. Steel reinforcement installation Reinforcement to be Inspected and approved by consultants. Reinforcement bars shall be tested for Tensile, Bend, Rebend and Chemical test with a frequency of 10 test minimum prior to 1* steel fixing then as per engineer but not less than 2 samples from each bar Dia. © Tying wire shall be 0.8mm dia GI steel wire and shall be double layered © All reinforcement Steel bars shall be Placed 150mm above the ground level and shall be protected from wind blow dust, sand and sea salls. ‘© Reinforcements will be cut and Bent as per approved shop drawings and bar bending schedules should comply with BS8666:2000 and BS 4466-1989 © The cut and Bent Steel Reinforcement will then be fixed directly from stock yard with approved tying wires © Extend the wall starter bar rebar with proper lap length and shall be staggered as per typical details © The diameter, Length and Splicing of Main reinforcement and, spacing and arrangement of stirrups/ties/links will be as per column schedule and design drawings. © Splicing of rebar’s will be done with lapping of approved size for rebar and above mid- height of the floor and lapping will be done for other diameters with a lap length of 50d. sufficient lap length will be provided for continuation at upper floor. © For Columns Concrete Spacer blocks will be provided to retain the reinforcement at proper distance from the forms in order to maintain clear cover of 45mm for external exposed and 25mm internal as per mentioned shop drawings. © For Shearwall Concrete Spacer blocks will be provided to retain the reinforcement at proper distance from the forms in order to maintain clear cover of 75mm for external exposed and 25mm internal as per mentioned shop drawings. ¢ Intermediate supports will be propped to avoid swaying of rebars until the distribution 6 Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall DOCUMENT NO: PROJECT NAME: DATE: PROPOSED 2B+G+2P+7+R OFFICE BUILDING IN DAFZA-W14 { | IRA 26.08.2018 Heitilii METHOD STATEMENT FOR CASTING COLUMNS, COREWALLS, ALHASHEM SHEAR WALLS AND RETAINING Ms-C-013 WALL rebars in place, For all walls Horizontal distribution bars shall be tied to vertical with proper spacing As the distribution rebars are fixed props will be removed MEP subcontractor will install all applicable embedded items and they will be supported and aligned using spacers and tying to the reinforcement, this activity will be co- ordinated with the installation of reinforcement. © MEP works will be completed as per the approved drawings, inspected by MEP Contractor and approved by consultants to proceed with the casting, © Fabricated reinforcement bars to confirm to required shapes and dimensions, with fabrication tolerances complying with BS 8666. Bend all concrete reinforcement cold, heating of bars or wire fabric is prohibited. ‘© Where the reinforcement bars end in columns, beams and slabs the shall be hooked with 290 degree or 180 degree hook with a straight end of 12 bar Dia and 5 bar Dia respectively. ‘* Where steel is not Specified or missed in the steel schedules the following minimum quantity to be considered to engineers approval Column 150-300Kg/ M*. * The actual concrete cover to all stecl reinforcement shall not be less than the required nominal minimum cover minus Smm. © Where reinforcement is located in relation to only one face of a member (e.g. a straight bar in a slab) the actual concrete cover shall be not more than the required nominal cover plus: © Smm on bars up to and including 12mm size. * 10mm on bars over 12mm up to and including 25mm size, * 15mm on bars over 25mm size. © Cover shall be maintained to all embedded fixings, conduits, etc., and at all chases and pockets. * Rebar cage and the wall base shall be completely cleaned using compressed air jet for removing all tying wire wastes prior to closing formwork Until other Specified plain dowel bars will be used as slip dowels in Concrete. ‘© Where welding of concrete reinforcement is shown on Approved drawings shall be done Accordance with AWS D 1.1 ‘* Ifthe Steel does develop any rust or declaration due to delay in casting shall grit blasted or as directed by Engineers. All Mill test certificates shall be submitted for Engineer’s approval prior to placing. The average bond stress on deboned bars cast into concrete specimen and subjected to pull out tests at 7 days shall not exceed 1.4MNisq. m ‘© The rebars will be offered for consultant inspection, upon the approval the shutter panel formwork will commence Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall PROJECT NAME: DATE: PROPOSED 2B+G+2P+7+R OFFICE | )UBL BUILDING IN DAFZA-W14 IRP(2ai f ital RU 26.08.2018 Hol METHOD STATEMENT FOR FEL BX | bocument no: CASTING COLUMNS, COREWALLS, Freame} ALHASHEMI ‘SHEAR WALLS AND RETAINING | | yajby5si Ms. ¢ - 013 WALL Construction joint in retaining wall Horizontal and Vertical construction joint Horizontal Construction Joints shall be made from floor to floor * Vertical Construction joints were made as per approved shop drawings © Where possible joints shall be positioned at least 2m away from comers © PVC water stopper shall be installed as per the types and locations indicated on the approved workshop drawings. * Jointing of the water stopper is carried out using the manufacturer's welding equipment. ‘The ends to be joined are cut square and held in alignment in a special jig then pressed cither side of a special heated blade until an even molten bead of PVC appears around the section, the heated blade is then removed and the molten ends are then pressed fully and firmly together until the molten PVC sets © The centre line of the water stopper shall coincide with the construction joint line and shall be correctly positioned and secured. water stopper shall be securely installed in position by means of galvanised tie wires fixed through the brass eyelets and tied to the reinforcing steel, Avich glued all GeV SiN * Care shall be taken while placing/vibrating the conerete in the vicinity of water stopp: to ensure the following: > No air pockets/honeycombing are inchided/formed. > The correct alignment of the water stopper is maintained without any wrinkles/twisting, > No damage is caused to the water stopper. ‘Specified concrete cover to reinforcement is maintained around the water stopper Formwork * Formwork to be Inspected and Approved from Consultant/Client representative. © Formwork system will be designed by approved sub-contractor ‘© The Shuttering sets will be assembled at site using girders and plywood ‘© Approved Concrete release Formwork will be constructed with approved Material and shop drawing ‘* 18mmplywood shall be used for form-face vertical bracing will be done with girders and Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall horizontal bracing with walers at bottom top, and middle, Hook straps shall be used to fasten the waler to girders to form a shutter. Shutter will be held together using 16mm tie rods through PVC sleeves, adjacent Shutters shall be connected by comer tie using pin-locking system. Form work for Kickers shall not be less than 70mm high and not more than 200mm high and shall be cast monolithically with the base. The pre-formed shutter set will be lifted and placed in position using mobile crane or tower crane depending on the accessibility. As the shutter panel remain hooked to the crane, one end of the top push-pull props will be clamped to the shutter at designated locations and the other ends will be inserted in 10 PROJECT NAME: DATE PROPOSED 28+G+2P+7+R OFFICE | )UBI BUILDING IN DARZA-W14 IRP CO 26.08.2018 METHOD STATEMENT FOR | EppI/ (Ot DOCUMENT NO: CASTING COLUMNS, COREWALLS, Freee | | ALHASHEMI SHEAR WALLS AND RETAINING | | up jbyiplitiel MS-C -013 WALL the base plate on the conerete blocks or on raft top. Then the crane shall release the shutter and continue erection of adjacent panels Meanwhile the bottom props will also be fixed between shutter and blocks Upon the completion of the Rebar Work, MEP Works and Installation of waterproofing Injection System the works will be offered for consultant inspection prior to closing the external shutter. These Panels will be Spaced against the concrete Spacers fixed on rebars ‘As the Shutter panel remain hooked to the crane, Tie rods will be passed through the internal and extemal shutters at designated locations © These tie rods are passing through PVC Sleeves for easy retrieval after the Pour Forms shall be cleaned from all other contaminations and shall be applied with one coat of Approved form releasing agent. © Shutters shall be fixed either by precast concrete blocks on either side and by fixing irectly to casted foundation «All formwork shall be closely fitted such that ther will be no loss of concrete Ingredients. © Approved Concrete level will be marked by nails on the side of shutter or the formwork. plywood shall be cut to the required level. Formwork shall be in comply with the requirements of BS $975 and BS 8110. Submit to Engineer for general review plan layout for all columns and Beams. © A Period of not less than 24 HRS notice shall be given to the engineer to allow for the inspection and approval prior to placing concrete. ‘© Necessary construction, expansion, erack control and transverse joints shall be provided as per Project approved drawings. ‘© Necessary water stops shall be installed at necessary locations or as per Engineer Approval ¢ of formwork ‘* Removal of formwork shall comply with BS 8110-Part 1 © Minimum of 24 HRS Shall be given before striking any vertical form work Concrete Works Trail mix for concrete mix design for approved grade shall be as per BS 5328, 28 Days Compressive Strength results, Water permeability 30 Mns water Absorption, Chloride Permeability, Initial Surface absorption test shall be performed on the Mix Design and the same should be approved from the consultant prior to placing, © Concrete of Approved Mix Shall be ordered after getting approval from Consultant shall be placed using Conerete pump. Trained concrete crew shall be used to pour concrete columns For columns conereting, conerete pouring shall be done using Bucket/Pump/Specially fabricated chute as per convenient © Stages of concreting for Columns and shearwall and retainingwall will be casted floor to floor and shall not be casted more than 3.5 Mtr height. Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall DATE ]| PROJECT NAME: PROPOSED 28+G+2P+74R OFFICE | )UB/ BUILDING IN DAFZA-W14 TRPCO ( | RY 26.08.2018 METHOD STATEMENT FOR Aipot | leiiiln DOCUMENT No: castine co.umns, conewauts, | FRElFeare| ALHASH=Mml SHEAR WALLS AND RETAINING ‘gn Jboyfyalédoig a Ms- C013 @ Free fall of concrete shall be restricted to 1.0 m and Vibrators shall be used such that it should be capable of transmitting vibrations to the concrete such a frequency of not less than 100 Hertz were operating submerged in concrete. © Concrete shall be delivered within 75 minutes from the time of water adding to site and shall be placed and compacted within 45 minutes Fresh Concrete temperature shall not be more than 30°C and cannot be proceed if the ambient temperatures Exceeding 40°C ‘© The concrete in each section between joints or comers shall be placed in successive pours working away in both directions from the centremost panel of that section, The minimum interval between placing adjacent panels shall be 3 days unless directed otherwise. ‘© Concrete slump shall be checked for every batch and Sampling, making test cubes and curing of cubes shall be in accordance with BS 1881: Parts 101, 108 and 111 respectively «Freshly Place Concrete shall be protected fiom rain, Dust and sun rays by covering with, polyethylene sheets and to be cured for 7 Days or as directed by Engineer. * Polytheen sheet shall be replaced with wet Hessian cloth within 3 hours of concrete placement * Chemical curing compound shall not be used unless authorized by Engineer in writing * Water shall be clean and free from salt and other impurities or harmful matter be in accordance with BS 8110: Part Minimum of 6(@for 7 Days+3 for 28 Days) No of Cubes shall be taken on each of concreting or for each 100m? of concrete for Compressive strength (Total of 300 Moulds to be made available in site ) Compliance with the strength shall be determined if: - 1. The average strength of each group of 4 consecutive test results for each mix exceeds the specified characteristic strength by not less than 3.0 N/sq.mm. 2. Each individual result exceeds 95% of the specified characteristic strength. Durability Requirements SNO | Description Test method frequency 01 | Rapid chloride permeability | ASTM C1202 Four tests every month for the first three “| fest (RCPT) months of production starting from raft casting Date and then every three months @ _| Waler penetration Din 1048 ‘Three tests every month for the first three ae months of production starting from raft casting Date and then every three months 03 _ | Chloride permeability ‘AASHTO T259___| Three tests every month for the first three ae months of production starting from raft = casting Date and then every three months 04 _| Water absorption ‘ASTM C642 Three tests every month for the fist three aa months of production starting from raft casting Date and then every three months Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall (12 +12 ) cubes shall be taken for durability requirements as mentioned above 10 PROJECT NAM. DATE PROPOSED 2B+G+2P+7+R OFFICE BUILDING IN DAFZA-W14 IRP(2: 26.08.2018 METHOD STATEMENT FOR FREI DOCUMENT NO: CASTING COLUMNS, COREWALLS, Freee} ALHASH! ‘SHEAR WALLS AND RETAINING \gosbojiplidcial Ms-C - 013 WALL © Compliance-with-the strength shall be determined 1.-The average strength-of each group-of 4-consecutive-test results for each mix exceeds the specified characteristic strengthr by not less than-3.0-N/sq.mm, 2, Each-individual result exceeds 95% of the specified- characteristic strength. © The action to be taken in the event of non-compliance shall be determined by the Project Manager! Engineer, and may range from qualified acceptance to rejection and removal of all or part of the concrete cast between the previous set of 4 cubes and the next set of cubes. 7.0 TOLERANCE: ‘All construction tolerance as per as Per Project Specifications otherwise ACI 117 is followed * Permissible deviation from the normal length of reinforcement is +/- 10mm(BS4449) © Tolerance for the clear cover of reinforcement shall not Exceed 1/3rd of the specified cover (ACI 117-10). «Spacing tolerance for the reinforcement must not exceed +/- Smm and shall not be less than total number of bars (ACI 117-10) « Tolerance for the deviation from plumb in Story height #/- Smm (Section 03 30 00-3.3 A) © Tolerance for the space between columns and walls adjacent to each other is +/-10mm (Section 03 30 00-3.3 A) © Tolerance for the position of Embedded Items +/- Smm (Section 03 30 00-3.3 A) # Deviation of position in the plan with respective nearest grid line is +/- 12mm (BS 5606) 8.0 | MANPOWER REQUIREMENTS: Site Engineers QC Engineer Foreman surveyor Charge hands Carpenters Steel Fixers Unskilled labors 9.0 MATERIAL REQUIREMENTS: © Formwork # Steel Reinforcement Bars Spacers and supports for concrete «Binding wire Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall PROJECT NAME: a PROPOSED 2B+G+2P+7+R OFFICE BUILDING IN DAFZA-WI4 { | RY 26.08.2018 heiiilin METHOD STATEMENT FOR CASTING COLUMNS, COREWALLS, ALHASHEMI SHEAR WALLS AND RETAINING MS- C - 013 WALL DOCUMENT NO: Polythene sheets Ready-mix Concrete Form releasing agent Absorptive mat fabric (Hessian cloth) for curing 10.0 | EQUIPMENT REQUIREMENT: Concrete transit mixers Vibrators Carpenter tools Light projectors Water tank and pumps Stand-by generator 11.0 HEALTH AND SAFETY PROVISIONS © All the safe practices will be adopted during the column and wall works activities. © Special work permits, wherever required, shall be obtained before commencing work. # All necessary personal protective equipment must be used. * Full body harness shall be provided for the labors on working platforms above 2m in height. Proper access for the labor and equipment shall be provided for the works. All machinery shall be checked for maintenance records. ‘The site shall be cleaned from all the debris, steel waste, nails ete 12.0 Q.C. APPROVAL AND OTHER DOCUMENTARY REQUIREMENTS © All the quality control documentation related to the Column and wall works should be approved before commencing the work. And as follows: QCP for Column and wall Construction works ITP for Column and wall Construction works Project Quality Plan Project HSE plan Cheek list sheets for concrete works All material approval vvvvvVY Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall PROJECT NAMI DATE: FRorost weecupak omice | \BI BUILDING IN DAFZA-W14 IRPC(' ‘Dubai 26.08.2018 METHOD STATEMENT FOR FREI DOCUMENT NO: CASTING COLUMNS, COREWALLS, Freezone SHEAR WALLS AND RETAINING — | yojay/plitiol MS-C - 013 WALL 13.0 SITE SAFETY ENGINEER'S APPORVAL, Oo Approved oO Approved Subject to compliance with the following notes/comments Not Approved - Reasons Signed: Dated: 13 Method Statement for Casting Columns, Corewalls, shear walls and retaining Wall com many SEs 300 i 2 PLAN VIEW WALL (14 Nos. Maximum Gone. Pressure 83 kNim2 PLAN VIEW WALL (1 No, Maximum Cone. Pressure 83 kNin2 swieswa PUN IEWWACL (122 Now Maseru Cor, Pressue 85 hina Wyse Sena “om oh Ht emt lal ms -74 i nist? sass | ‘si13. Si4, SW5, SW, SW (45454649272 Noe) PLAN VIEW WALL Maxum Cone. Pressure SOkNIn2 i 1 i sewn r oretery 4 srar_| ood 8 eS le S rag a Pe cases cto PLAN VIEW WALL (7+4=11Nos) PLAN VIEW WALL (3 Nos. Maximum Gone, Pressure 83 kNim2 Maximum Conc, Pressure 63 kNim2 on cose PLAN VIEW WALL (2+3=5 Nos. ‘Maximum Conc, Pressure 83 kNIm2 ELEVATION FOR TYPICAL COLUMN (Pressure 83 Ana) “TYPICAL SECTION FOR WALLS (Pressure Sok? Maxim) ‘ees ciaialon gins eo comancind coctc| Sai || AAA Tr TPT RR ane LEVEL ane ae BL TETETEETE(A AEE

You might also like