You are on page 1of 1

ZAMBOANGA INTERNATIONAL AIRPORT

LEGEND
MEDIUM TERM LONG TERM MEDIUM TERM LONG TERM
APRON RUNWAY

PASSENGER TERMINAL BUILDING ACCESS ROAD

CARGO TERMINAL BUILDING WALKWAY

ADMINISTRATION BUILDING
WATER SUPPLY/WATER SUPPLY SYSTEM
MOTORPOOL AND MAINTAINANCE BUILDING

RESCUE AND FIRE FIGHTING SEWERAGE AND SANITATION SYSTEM

TAXIWAY SOLID WASTE DISPOSAL SYSTEM

GENERAL AVIATION AREA POWERPLANT

HANGARS
CARPARKING AREA

RUNWAY STRIP AIR NAVIGATION BUILDING AND CONTROL TOWER

1300
3500
SITE DEVELOPMENT PLAN
4418,91

RUNWAY STRIP RUNWAY RUNWAY STRIP APRON ADMINISTRATION BUILDING

PASSENGER TERMINAL BUILDING CARGO TERMINAL BUILDING ACCESS ROAD


901,1 137.00
CONTROL TOWER
450,55 36,04
382,97 382,97
CAR PARKING
2172,17 45,06

PLATE NO.3
GROUP NO._
RATING
PUQUIZ, AHLYKA L.
DATE GIVEN:
SHEET NO.
CRITERIA 100 75 50 25
CRITERIA
SALI, AARON TROY S.
ZAMBOANGA
INTERNATIONAL
10/16/2021 1. PROGRAMMING (40%) CROSS SECTION

1
COLLEGE OF AIRPORT DATE DUE: 10/28/2021 2. SOUNDNESS OF SDP (40%)
ARCHITECTURE
ARCH 145 DESIGN 7 DATE SUBMITTED: 3.EFFECTIVE INTERPRETATION (10%)
W.M.S.U. 10/28/2021 PRESENTATION (10%)
TATEL, MANOLO L.

You might also like