You are on page 1of 1

ISSUE FOR CONSTRUCTION

RAMP
RAMP

R.O.W LINE
RATIO =1:12.5 RATIO =1:120 8.5M CONCRETE DRIVEWAY
PERCENTAGE = 0.83% NATURAL GAS
PERCENTAGE = 8%

LINE
9144MM (30') BUILDING
H2 GAS YARD SMOKING
SHADED

CHEMICAL
BULK TANK
AREA
BIOLOGICAL WASTE
WATER TREATMENT

8.5M CONCRETE DRIVEWAY


CUB FAB

BUS BAY
N2 GAS YARD

ROOF LINE ABOVE


GUARD
HOUSE

14 13 RAMP
RAMP RATIO =1:12.5
RAMP 8.5M CONCRETE DRIVEWAY
RATIO =1:12.5 PERCENTAGE = 7.97%
RATIO =1:12.5
PERCENTAGE = 8% PERCENTAGE = 8%

BOUNDARY LOT

SITE PLAN - LOT 1597 PLAN


NORTH
TRUE
NORTH

E
W

PERSPECTIVE FRONT VIEW PERSPECTIVE LINK BRIDGE VIEW TEXAS INSTRUMENTS


ELECTRONICS MALAYSIA SDN. BHD.
BATU BERENDAM FREE TRADE ZONE,
75350 MELAKA, MALAYSIA.

MEINHARDT EPCM SDN. BHD.


SUITE 12.01-12.07, LEVEL 12 AMODA,
22, JALAN IMBI, 55100 KUALA LUMPUR.

KCLA ARCHITECTS SDN. BHD.


NO. 10 BELL ROAD,
10350 GEORGETOWN, PENANG

MEINHARDT MALAYSIA
SDN. BHD.
SUITE 9.01-9.07, LEVEL 9 AMODA,
22, JALAN IMBI, 55100 KUALA LUMPUR.

H&H FIRST CONSULTANCY


40, 1ST FLOOR, JALAN BAWAL, TAMAN KIMSAR,
13700 PERAI, PULAU PINANG

PROPOSE 6 STOREY FACTORY AT TAMAN


PERINDUSTRIAN BATU BERENDAM, MELAKA.

FOR TEXAS INSTRUMENTS ELECTRONICS


MALAYSIA SDN. BHD.

ARCHITECTURAL LAYOUT
PRODUCTION
3D PERSPECTIVE

PERSPECTIVE RIGHT ELEVATION VIEW PERSPECTIVE LEFT ELEVATION VIEW NOTE: IMAGES ARE FOR ILLUSTRATION PURPOSE ONLY.
TI8072

TIEM2-SKE-F0-00-AARCH-001 0