Discipline Work : Pile Cut-Off, Pile Cap, Tie Beam & Flat Floor Concrete
Calibration or Verification
Type of Calibration
Item Trade Name / Device Serial Identification Number
Devices Calibration By / Verification Certificate No. Device Location Remarks
No Manufacturer Number 1st 2nd 3rd Last date Next Due (ID No.)
(ext./int.) Recall Date
Calibration Calibration Calibration Calibration Date
1 Automatic Level AT-B4A Topcon WP147919 PT DUTA JAYA SURVEY External 08-Apr-22 08-Apr-23 08-Apr-24 0198/KAL/DJS/IV/22 JKT05-SAR-EQ-001 On Project VALID
2 Total Station GTS 102N Topcon 6G1268 PT DUTA JAYA SURVEY External 08-Apr-22 08-Oct-22 08-Apr-24 114/KAL/DJS/IV/22 JKT05-SAR-EQ-002 On Project VALID