3- WET RISER
SAHGA SAHGAL
Date: AREA STATEMENT
INSIDE
TOTAL PLOT AREA = 40.0X50.00 M= 2000.00 SQ.MT.
1.37
RAILING
L 2022.10.08
4- YARD HYDRANT
1.50
PERMI. G/F COVD.AREA UP TO = 450 SQ.MT. @ 60% = 270 SQ.MT.
1.00 COMP. WALL 5- AUTOMATIC SPRINKLER SYSTEMS
RAIN WATER HARVESTING TRENCH
LVL+0.60 BALANCE ON 1550.0 SQ.MT. @ 55% = 852.5 SQ.MT.
11:33:56 +05'30'
OUTSIDE
340
RAINWATER HARVESTING DETAIL
PL. LVL
6- ELECTRONIC FIRE ALARM SYSTEMS TOTAL = 1122.50 SQ.MT.
LVL+000
150
450
PERMI. F.A.R AS/ SLAB SYSTEM UP TO
300
COMPOUND WALL DETAIL 7- AUTOMATIC DETECTION ALARM SYSTEMS
150150 150
570
150
685
P.C.C 1:4:8
100 SQ.MT.@120% =120.00 SQ.MT.
900 8- UNDER- GROUND STATIC WATER ON 350 SQ.MT.@100% =350.00 SQ.MT.
STORAGE TANK CAP- 150000 LTR 1550.0 SQ.MT.@ 80% =1240.0 SQ.MT.
CULVERT DETAIL 9- TERRACE TANK CAP- 20,000 LTR TOTAL = 1710.0 SQ.MT.
FOUNDATION DETAIL
10- PUMP AT U.G. TANK- ADDITIONAL F.A.R. ALLOWED AS PER NEW BYE LAWS
TWO ELECTRIC PUMP -2280 LPM. @ 30 % OF 1710.0 SQ.MT. = 513.0 SQ.MT.
ONE DIESEL PUMP-2280 LPM. TOTAL = 2223.0 SQ.MT.
TWO 180 LPM. ELECTRIC JOCKEY PUMP
KEY PLAN PROP.COVD. AREA METER ROOM=3.46X3.46=11.97 SQ.MT.
PROP. COVD. AREA ON F/FL. =30.0 X 36.0 - (FIRE STAIR)=
= 1080.0 - (3.3 X 6.3) =
= 1080.0 - 20.79 = 1059.21 SQ.MT.
PROP. COVD. AREA ON S/FL. = SAME AS F./FL. - ( 2LIFTS+LOBBY )
= 1059.21 - (2.8X2.90+1.8X1.6+1.385X2.58 )
= 1059.21 - (8.12+2.88+3.57) =
= 1059.21 - 14.57 =1044.64 SMT.
WORKSTATION
DOOR AND WINDOW SCHEDULE
INDUSTRIAL
1. D/W = 3230 X2700 7. V = 2400X450
2. D = 1500 X2100 8. V1 = 1800X450
3. D1 = 900X2100 9. V2 = 1800X1200
4. D2 = 750X2100 10. V3 = 900X1200
STILT FOR PARKING 5. W =2400 X1800
+1500 LVL. 6. W1 =1800 X1800
PARKING DETAIL
TOTAL F.A.R. ALLOWED = 2223.0 SQ.MT.
PARKING REQUIRED= 2326.48/100 = 23.26 NOS.
SAY. = 23.26 ECS.
AREA REQUIRED FOR CAR PARKING = 30 X23.26 = 697.80 S Q.MT.
AREA AVAILABLE FOR PARKING( STILT) =
= 1080.0 SQ.MT.
NOTES:
WORKING HALL WORKING HALL 1. NOS. OF WORKER'S =20 MALE 10 FEMALE ONLY
INDUSTRIAL 2. WHERE THE LIGHT AND VENTILATION REQUIRMENTS ARE
INDUSTRIAL
NOT MET THROUGH DAY LIGHT & NATURAL VENTILATION.
THE SAME SHALL BE ENSURED THROUGH ARTIFICIAL
LIGHTING AND MECHANICAL VENTILATIONS AS PER
LATESTS PROVISIONS OF THE NATIONAL BUILDING CODE.
WATCHMAN SHELTER
ELECTRICAL INSTALLATION
+600 LVL.
+-00 LVL.