You are on page 1of 1

Clean room disinfection:

1. GMP clean rooms, lock systems,


isolators, safety cabinets etc. ... Choose relevant Diosol /
2. Problematic germs, viruses or Diosol PURE concentration
spores / Level of contamination? Determine relevant
(3-19% H2O2) + chemical
3. Time frame? environmental parameters:
indicators / test sticks (100
4. Protec, Tube or Pharma
Generator? ppm)
1. Rel. humidity in %
2. Temperature
3. Room volume in m3
Prepare environment according to parameters:

1. Turn off ventilation technology + use smoke


detector covers
2. Use gastight seal for openings (> Diosol 6)
3. Place chemical indicators in room on
surfaces Clean room area can be
4. In case of validation: Use bioindicators + QM re-entered and used again!
papers
5. Place DiosolGenerator
6. Use door labels

Consider ventilation Clean room follow-up work:


time:
Start H2O2 clean room In case of Diosol 19 - Collect all used
decontamination (Fogging about 45 minutes after indicators
time + exposure time 90 exposure time (e.g. - Remove gastight tape
minutes from start) turning on ventilation
system)

You might also like