1. The document provides instructions for disinfecting clean rooms using hydrogen peroxide.
2. It outlines choosing the appropriate concentration of hydrogen peroxide solution based on the level of contamination and preparing the environment by adjusting parameters like humidity, temperature, and room volume.
3. Steps include sealing openings, placing indicators, using a hydrogen peroxide generator, and allowing adequate ventilation time before re-entry once disinfection is complete.
1. The document provides instructions for disinfecting clean rooms using hydrogen peroxide.
2. It outlines choosing the appropriate concentration of hydrogen peroxide solution based on the level of contamination and preparing the environment by adjusting parameters like humidity, temperature, and room volume.
3. Steps include sealing openings, placing indicators, using a hydrogen peroxide generator, and allowing adequate ventilation time before re-entry once disinfection is complete.
1. The document provides instructions for disinfecting clean rooms using hydrogen peroxide.
2. It outlines choosing the appropriate concentration of hydrogen peroxide solution based on the level of contamination and preparing the environment by adjusting parameters like humidity, temperature, and room volume.
3. Steps include sealing openings, placing indicators, using a hydrogen peroxide generator, and allowing adequate ventilation time before re-entry once disinfection is complete.
isolators, safety cabinets etc. ... Choose relevant Diosol / 2. Problematic germs, viruses or Diosol PURE concentration spores / Level of contamination? Determine relevant (3-19% H2O2) + chemical 3. Time frame? environmental parameters: indicators / test sticks (100 4. Protec, Tube or Pharma Generator? ppm) 1. Rel. humidity in % 2. Temperature 3. Room volume in m3 Prepare environment according to parameters:
1. Turn off ventilation technology + use smoke
detector covers 2. Use gastight seal for openings (> Diosol 6) 3. Place chemical indicators in room on surfaces Clean room area can be 4. In case of validation: Use bioindicators + QM re-entered and used again! papers 5. Place DiosolGenerator 6. Use door labels
Consider ventilation Clean room follow-up work:
time: Start H2O2 clean room In case of Diosol 19 - Collect all used decontamination (Fogging about 45 minutes after indicators time + exposure time 90 exposure time (e.g. - Remove gastight tape minutes from start) turning on ventilation system)