. Report No: GRMD-21389-
aaly BLASTING REPORT on
Riyadah
“GRMD Project No: | 20380
‘GRID Project Name: | INSTALLATION OF VIBRATOR (WELDING BLASTING AND PAINTING)
Ca Metalock Procedure No: | GRC.13.60P.03
Painting System: [selon | petore& after Blasting
ining en TUN Opto ater ating
Drang / acne ie [ parse Gondion Prt Det | Vator
Tass nem | Pm | Wa [ane | vow | sues | sue | oarng
pact | secrmon | 2%, | fl | iy | Pom |Temtwe| ote | mtr Dra
s2.00em| vibrator | abe | aoe | a2 | oe | ase | - Garnet
c2aona| irate | aye | ave ‘gc [ sna | some
“Surface Profile Gauge ‘allration on “alration Due on
YF 280 _ 8 Dec 2021 | OF done 2022
Comments ian)
Suh
Checked BY Reviwed & Approved By
[GRCLAQC.AIsue-Rev:1.0- Dat-0505 202 PageReport No: GRMD-23100 =
aalyy PAINTING REPORT vo
Higadak: Date:09.02.2022
{Gao Projet No: | 21380
‘GRO Project Name: | INSTALLATION OF VIBRATOR (WELDING BLASTING ANO PAINTING)
te 0 Reeren: Mtalok ProcediweWo| GRCI3.6OR8
Painting Sten: [JOTUN ning sae | cot
‘aig acumen | A or St Canon Prec sta [ Wor
=— tem Dry | Wet | etatve | Dew ‘Surface | Actual
ome | esc | UB | Bu | amy | Pont |empetue | oer | Patmos
e200 ,
pm | Miter Tove fia | me lage | Be | -
45
599 , al vo
om | mow owe Jig | ase | Bz | se te
to
%
‘vera Fal OF two _jamhig. DF a5
ont |pece rie
ial ang Wickes eB Calan on Calraton Bue on
FS 2b2b01 08 DEC 2021 OF Son 2022
commer fan
Revd pero y
{GRCLA.0C.06 sue Rev: 30- Date. 05.2021, Page (1Riyadah
aly PAINTING REPORT Lashes
Report No: Grtao-21180
“Gro Prec: | 20180
“GRO Project Name: | INSTAUATION OF VIBRATOR [WELDING BLASTING AND PAINTING)
{austomer /PO Reference: | Metaock
Procedure Wo: | GRCLB.GOP3
Painting Syste: | JOTUN
Coating Stage | Intermediate coat
Dring / Document Ret | Aspe Ss Condion Proc etl | Viator.
Fainté hem] PY | WE [netaive | ew | suoce | actual
Owe | ecm | 2% | Ma | ey | pot | Tempest |r| att Mate Dea
x00
Viator
pm ate | me |4oe | Wee | ase [10
a
00 e
ra | Mbrator Jone | ge | Asc | We] ase |
Mo
iN
He _|Hmc Reg DPF - Bo
Rest [ncasiehy
Dit Cotng Thies Gage libration on Clteation Deon
Fs 2b2b01 os DEC 2001 | OF Sov 2029
commenti ay
5 ae
‘Checked By
Reviewed & Approved By
{GRCL4.0€.06 sue Rv: 3.0-Date08.08 2021
Page (2)Report Ne: GRM.21180-
Lay PAINTING REPORT pron
Riyadah aes
ro Project Ne: | 280
‘GOD Project Nae | STAWATION OF VIBRATOR WELDING BLASTING AND PAINTING)
{Customer PO Raerence: | Matalock ocd No: | GRE1B.GOPR
[Painting Sse: |3or0N coating Stage | Final coat
‘rang / Document et | As pert Conion Prot Dts | Vbrtor
Paintig wy | wet
tem relate | ew | sutace | Aca!
Dies bulb | but Paint Material Deas
8 | owsataton | 28 | PME amy | Pom | Tempestre| OFT
ivator .
23 | Wwe | doe | qe | 27% — |maho
to
i we
wibeawor [pyc | We | 3 | qe | 28 ley
4
tia
—___ Avera Fira OFT Hom neadF- bs
sot cD
Dia Contin Tiekess Gage Gaibrationon Catan Doon
FS 26201 08 Déc dal | oF Sw maa
comments ay
Sa
Cheeked ay — Reviewed & proved 37
GRCUA.0C06 sue Rev: 30- Date-05. 05.2021 Pago (3)