You are on page 1of 19

P

FOR SQUARE FOOTING


Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box

Thickness - - -
Width - -
No. of bars - one way only 0.25
0

THICKNESS
No. of footing 0
on this size - -

Materials needed: WIDTH


Cement - bags
Sand - cu.m.
Gravel - cu.m.
bars - pcs. specify diameter
Tie wire - klg.

Footing total - cu.m.


FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box

COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING SIDE 1


###
v
###
t Height col. - Number of column

SIDE 2
###
t Side 1 col. - this size -
###
s Side 2 col. -
###
s Thickness of footing (TF)
###
s Number of for this column -
###
s vertical bars - Stirrup - rest
###
r
NOTE:If stirrups

Height up to bottom of 2nd floor slab only


###
n Confinement of stirrups: spaced uniformly, type
###
n No. of stirrups S1 0 S1 Spaced at - "0" zero on "no. of
No. of stirrups S2 0 S2 Spaced at - stirrups" yellow box
No. of stirrups S3 0 S3 Spaced at - Stirrup - S3
rest spaced at -

Materials needed: Stirrup - S2


Cement - bags
Sand - cu.m.
Stirrup - S1
Gravel - cu.m.
Vertical bars - pcs. specify diameter
Stirrups #DIV/0! pcs. specify diameter
Tie wire #DIV/0! klg. Thickness
Footing (TF)
he yellow box

stirrups
uniformly, type
on "no. of
yellow box

Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box
COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
SIDE 1
###
V Height col. - Number of column
###
###
T Side 1 col. - this size -

SIDE 2
###
S Side 2 col. -
###
S SLAB 2ND FLOOR
###
S Number of
###R vertical bars -
###R
###
N Confinement of stirrups:

Height from ground floor line to ceiling of preceeding


###
S No. of stirrups S1 0 S1 Spaced at - STIRRUP - REST
###
T No. of stirrups S2 0 S2 Spaced at -
###
T No. of stirrups S3 0 S3 Spaced at - NOTE:If stirrups
spaced uniformly, type
rest spaced at - "0" zero on "no. of
stirrups" yellow box
Materials needed:
Cement - bags STIRRUP - S3

Sand - cu.m.
Gravel - cu.m.
STIRRUP - S2
Vertical bar - pcs. specify diameter
Stirrups #DIV/0! pcs. specify diameter STIRRUP - S1

floor
Tie wire #DIV/0! klg.
GROUND FLOOR SLAB
he yellow box

SLAB 2ND FLOOR

stirrups
uniformly, type
on "no. of
yellow box

P - S2

GROUND FLOOR SLAB


FOR CONCRETE COLUMN
### Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box
###
r
### COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING DIAMETER
###
v
###
t Height col. 5.00 Number of column
###
t Diameter 10.00 this size 4
###
s
###
s Thickness of footing (TF)
###
s Number of for this column -
###
s vertical bars - Stirrup - rest
###
r
NOTE:If stirrups spaced

Height up to bottom of 2nd floor slab only


###
n Confinement of stirrups: uniformly, type "0" zero on
###
n No. of stirrups S1 0 S1 Spaced at - "no. of stirrups" yellow
No. of stirrups S2 0 S2 Spaced at - box
No. of stirrups S3 0 S3 Spaced at - Stirrup - S3
rest spaced at -

Materials needed: Stirrup - S2


Cement 16,257.78 bags
Sand 903.21 cu.m.
Stirrup - S1
Gravel 1,806.42 cu.m.
Vertical bars - pcs. specify diameter
Stirrups #DIV/0! pcs. specify diameter
Tie wire #DIV/0! klg. Thickness
Footing (TF)
he yellow box

stirrups spaced
, type "0" zero on
irrups" yellow

Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box
###
r COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
### DIAMETER
###
V Height col. Number of column
###
###
T Diameter this size
###
S
###
S SLAB 2ND FLOOR
###
S Number of
###
R vertical bars
###

Height from ground floor line to ceiling of preceeding floor


R
###
N Confinement of stirrups:
###
S No. of stirrups S1 S1 Spaced at
STIRRUP - REST
###
T No. of stirrups S2 S2 Spaced at
###
T No. of stirrups S3 S3 Spaced at NOTE:If stirrups spaced
uniformly, type "0" zero
rest spaced at on "no. of stirrups" yellow
box
Materials needed:
Cement bags STIRRUP - S3

Sand cu.m.
Gravel cu.m.
STIRRUP - S2
Vertical bars pcs. specify diameter
Stirrups pcs. specify diameter STIRRUP - S1
Tie wire klg.
GROUND FLOOR SLAB
e yellow box

SLAB 2ND FLOOR

stirrups spaced
y, type "0" zero
of stirrups" yellow

GROUND FLOOR SLAB


FOR ZOCALLO
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box

Width -
Thickness -
Length -
Natural ground
No. of Longitudinal bars -
Spacing of Transverse bars -

CHB

Materials needed:
Cement - bags Longitudinal bars
Sand - cu.m. Transverse bars
Gravel - cu.m.
Def. Bars #DIV/0! pcs.
Thickness
Tie wire #DIV/0! klg.
vol
### Width
long
0
trans
###
###
on the yellow box

Natural ground

Longitudinal bars
Transverse bars
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box
STIRRUPS - S1
STIRRUPS - S2
STIRRUPS - S3
STIRRUPS - REST
###
v
###
m
HEIGHT

###
L
###
s
###
s
###
s
###
r WIDTH L/2 L/4 L/2
###
s
###
t
###
t
LENGTH O.C. OF COLUMN
###
j
###
t

Height -
Width -
Length -

No. of beams Confinement of stirrups:


this size - No. of stirrups S1 0 S1 Spaced at - Materials needed:
No. of stirrups S2 0 S2 Spaced at - Cement - bags
Number of No. of stirrups S3 0 S3 Spaced at - Sand - cu.m.
main bars - rest spaced at - Gravel - cu.m.
Main bars - pcs.
Stirrups #DIV/0! pcs.
Tie wire #DIV/0! klg.

Beam total 0.00 cu.m.


FOR CHB WALLING/PARTITION
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box
you may include height from zocallo to ceiling CEILING LINE
D
Total length 2.40 W

HEIGHT just for a single floor


Height 0.80 1 floor T
LESS OPENNINGS OF A
WINDOWS & DOORS
TO DESIGNATE WHAT SIZE OF CHB N
YOU'RE USING, TYPE " 1" ONE ON THE 4"
YELLOW BOX BELOW c
Using 4"x8"x16" 1 m
Using 6"x8"x16" - FLOOR LINE c
s
TOTAL LENGTH s
FOR PLASTERING (class "B") METHOD,
CHOOSE BY TYPING " 1 " ONE ON Less: OPENNINGS on one floor only, CHB quantity for another floor must be done sep
YELLOW BOX BELOW Description Area No. of units Description Area No. of units c
Plastering 1 side only - Door 1 - - Window 1 - - s
Plastering 2 sides 1 Door 2 - - Window 2 - -
Door 3 - - Window 3 - - c
Materials needed: Door 4 - - Window 4 - - c
Cement 2.54 bags Door 5 - - Window 5 - - v
Sand 0.25 cu.m. Door 6 - - Window 6 - - h
Def. Bars 1.51 pcs. specify diameter
C.H.B. 24.96 pcs. specify size (thickness) Total window opennings
Tie wire 0.15 klg. for this floor only - sq.m.
Note: Steel Reinforcement for CHB; Vertical bars - dist. @ 0.60m o.c., Horizontal bars - @ every 3 layers
###
###
###
###
###
###
4"6"
###
###
###
###
###
###
###
###
###
###
floor must be done separately.
###
###
######
### ###
1 ###
2 ###
fa
######
### ###
######
### ###
### ###
###
### ###
###
###
FOR TWO WAY CONCRETE SLAB
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box

###VolumeFor bar spacing, choose by tping "1"


###Area on the yellow box below
tie
bars
wire
Bar Spacing USE SPACING OF
MAIN
###
###
###
### 0.100 m. o.c. - REINFORCEMENT
###
###
###
### 0.125 m. o.c. -

WIDTH
###
###
###
### 0.150 m. o.c. -

(m)
###
###
###
### 0.175 m. o.c. -
###
###
###
### 0.200 m. o.c. -
###
###
###
### 0.225 m. o.c. -
###
###
###
### 0.250 m. o.c. -
###
###
###
### 0.275 m. o.c. -
###
###
###
### 0.300 m. o.c. -
###
###
Length - L/2 L / 4 Spaced at ___ L/2
Width - LENGTH (m)
Thickness -
Materials needed:
No. of Slab this size Cement - bags
- Sand - cu.m.
Gravel - cu.m.
Def. Bars - pcs. specify diameter
Tie wire - klg.
FOR CONCRETE FLOORING
###vol Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow box
###
###
bar hor
###bar For
### vert ground floor only: (REINFORCED CONCRETE FLOOR)
###
t
###
###
tie Width 2.10 Reinforced bars
Length 2.10
Thickness 1.05
Note: If flooring is not reinforced,leave bar spacing blank
Bar Spacing
bothways 0.20
LENGTH
WIDTH
Note: If you are not using tiles, just leave tile size blank
Choose size of tiles you will use by
###areatyping one "1" on the box below Materials needed:
###
### 4" x 4" - Cement 47.93 bags
###
### 8" x 8" - Sand 2.66 cu.m.
###
### 12" x 12" - Gravel 5.33 cu.m.
###
### 16" x 16" - Def. Bars 8.86 pcs. specify diameter
### Tiles - pcs. specify size
Tie wire 0.64 klg.
ellow box

You might also like