You are on page 1of 1

PLINTH BEAM REINFORCEMENT DETAILS

ID MID END BAR BENDING


SECTION BEAM REINFORCEMENT BEAM REINFORCEMENT
SECTION SCHEDULE

0'-9.0" T- 2 nos of 12mm dia bars-S 0'-9.0"


T-2 nos of 12mm dia bars-S
T-1 nos of 12mm dia bars-C
PB1 B-2 nos of 12mm dia bars-S
1'

1'
B-1 nos of 12mm dia bars-C B-2 nos of 12mm dia bars-S
0'-9.0"
T-2 nos of 12mm dia bars-S 0'-9.0"
T-2 nos of 12mm dia bars-S
T-2 nos of 12mm dia bars-C
1'-3.0"

1'-3.0"
PB2 B-2 nos of 12mm dia bars-S
B-2 nos of 12mm dia bars-C B-2 nos of 12mm dia bar-S
0'-9.0" 0'-9.0"

T-2 nos of 12mm dia bars-S T-2 nos of 12mm dia bars-S
1'

1'
PB3 B-2 nos of 12mm dia bars-S
B-2 nos of 12mm dia bars-S
0'-9.0" 0'-9.0"
T-3 nos of 12mm dia bars-S T-2 nos of 12mm dia bars-S
PB4
1'-3.0"

1'-3.0"
B-3 nos of 16mm dia bars-S B-3 nos of 16mm dia bars-S

NOTE: NOTE:
Stirrups: 8mm dia @ 8" C/C Stirrups: 8mm dia @ 6" C/C

T-TOP B-BOTTOM S-STRAIGHT BAR C-CURTAILMENT BAR COVER TK 25 MM

DECENTERING CURING

OCEAN ARC
09-Jan-20 5:59 AM
9487202215
GSPublisherVersion 0.0.100.100

You might also like