Professional Documents
Culture Documents
NORTH
MAKKAH
N
TRUE PLANT
NORTH NORTH
MAKKAH
N
PLANT
NORTH
DN
DN
DN
DN
U
G
G
A
KEY PLAN
GENERAL NOTES:
1. DO NOT SCALE FROM THIS DRAWING.
2. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS.
3. CONTRACTOR MUST REPORT ANY DISCREPANCIES PRIOR TO EXECUTION OF ANY WORKS.
4. ALL DIMENSIONS MUST BE VERIFIED ON SITE PRIOR TO ORDER OR MANUFACTURE OF
MATERIALS OR PRODUCTION OF SITE DRAWINGS.
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH STRUCTURAL, MEP AND ALL OTHER
RELEVANT DRAWINGS.
LIST OF DRAWINGS1
Current ISSUED FOR CONSTRUCTION (IFC)
DRAWING NO. Sheet Name SCALE Revision Project Field Engineer Date:
Name:
7200040907-JWWF-14X-ED-001 NEUTRALIZATION TANK AND INTERMEDIATE PUMPING STATION ELECTRICAL LIST OF DRAWINGS NTS 0 Contractor Date:
Name:
7200040907-JWWF-14X-ED-060 NEUTRALIZATION TANK AND INTERMEDIATE PUMPING STATION PANEL AND DB'S SCHEDULE OF POINTS AND SCHEMATIC DIAGRAMS NTS 0
7200040907-JWWF-14X-ED-100 NEUTRALIZATION TANK AND INTERMEDIATE PUMPING STATION GROUND FLOOR PLAN POWER LAYOUT 1:100 0
7200040907-JWWF-14X-ED-110 NEUTRALIZATION TANK AND INTERMEDIATE PUMPING STATION GROUND FLOOR PLAN LIGHTING LAYOUT 1:100 0
7200040907-JWWF-14X-ED-140 NEUTRALIZATION TANK AND INTERMEDIATE PUMPING STATION GROUND FLOOR PLAN EARTHING LAYOUT 1:100 0
0 23.08.2022 ISSUED FOR CONSTRUCTION BAP AMA RAJ MTT BAM KSP
02 30.05.2022 ISSUED FOR APPROVAL BAP AMA RAJ MTT BAM KSP
01 24.03.2022 ISSUED FOR APPROVAL BAP AMA RAJ MTT BAM KSP
00 13.01.2022 ISSUED FOR APPROVAL BAP AMA RAJ MTT BAM KSP
.ﻣراﺟﻌﺔ رﻗم ﺗﺎرﯾﺦ
ﻋﺗﻣﺎدD
ED
D
ﺣﻘﻖD
E
ﺟﻌﺔD
WE
NE
N
ITT
KE
OV
RE ﻣرا
CH اﻟ
ﺗ
ا
AW
ﺻﻣﯾم
رﺳم
SU ﺗﻘد
ﺗ
SIG
VIE
EC
BM
PR
ﯾم
DR
DE
اﻟﺗﻧﻘﯾﺣﺎت
AP
REV. No. DATE REVISIONS
Owner:
Contractor:
Consultants:
middle east
Project: :ﻣﺷروع
D SIZE