You are on page 1of 1

A SECTION AMENDED. 06.04.

2022 BYM
10.100

10.100

10.100

10.100

10.000

10.000

10.240

10.600

10.600
PROP. PLAFORM PROP. PLAFORM

6.460
LEVEL (M) LEVEL (M)
10.070

11.106

12.153

4.451
6.651
7.721

EXISTING GROUND EXISTING GROUND


4.290

4.379
8.020

6.516

3.954

5.063

6.677

6.318

5.823

5.255

2.937

2.943

6.663

7.693

8.805

9.343

9.917
7.298

LEVEL (M) LEVEL (M)


0+010

0+020

0+030

0+040

0+050

0+060

0+070

0+080

0+090

0+100

0+010

0+020

0+030

0+040

0+050

0+060

0+070

0+080

0+090

0+100

0+110

0+120

0+130

0+140
CHAINAGE (M) CHAINAGE (M)

A
SECTION A-A SECTION B-B
Horizontal Scale 1:500, Vertical Scale 1:100 Horizontal Scale 1:500, Vertical Scale 1:100
(1) SITE PREPARATION WORKS AT
TENGAH TOWN (PHASE 4)
(2) CONSTRUCTION OF OUTLET DRAINS
AT TENGAH TOWN (PHASE 1b)

SITE PREPARATION WORKS AT


TENGAH TOWN (PHASE 4)

STAGE 1 EARTHWORKS
CROSS SECTION
(SHEET 1 OF 2)
AS SHOWN DEC 2021

PPM GT

MEINHARDT INFRASTRUCTURE
PTE LTD
168 JALAN BUKIT MERAH,
#12-01 CONNECTION ONE
SINGAPORE 150168
TEL : 63779700 FAX : 63779733

208009-01-F2110-TGT-EW-0120 A

AMENDMENT NO.1 BYM FSL