UPAH TUKANG
BULAN KE-1 Rp 67,800,000
BULAN KE-2 Rp 122,000,000
BULAN KE-3 Rp 79,980,000
TOTAL Rp 269,780,000
Tanggal
NO N A M A POSISI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Stanbay
1 Mandor Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
2 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
3 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
4 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
5 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Karsim Stanbay
6 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
7 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
9 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
10 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
11 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
12 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
13 Tukang Besi Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
14 Tukang Besi Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
67,800,000.00
Total
68 Kabon UM Pekan 10
Kasbon UM Pekan 13
Sisa Upah
Tanggal
NO N A M A POSISI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Stanbay
1 Mandor Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
2 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
4 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
5 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Karsim Stanbay
6 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
7 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
9 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
10 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
12 Tukang Gali Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
13 Tukang Besi Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
14 Tukang Besi Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Hari (07.00 - 22.00)
Stanbay
15 Tukang Besi Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
16 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
16
Stanbay
17 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
18 Tukang Batu Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
19 Tukang Sipil Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Hari (07.00 - 22.00)
Stanbay
20 Tukang Sipil Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
21 Tukang Sipil Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
22 Tukang Sipil Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
23 Kenek Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
24 Kenek Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
25
25 Kenek Hari (07.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 122,000,000.00
Kabon UM Pekan 10
Kasbon UM Pekan 11
Kasbon UM Pekan 12
Kasbon UM Pekan 13
Sisa Upah
Tanggal
NO N A M A POSISI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Stanbay
1 Mandor Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
2 Tukang Batu Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
4 Tukang Batu Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
5 Tukang Batu Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Karsim Stanbay
6 Tukang Batu Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
7 Tukang Gali Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
Stanbay
9 Tukang Gali Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
11 Tukang Gali Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
12 Tukang Besi Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
13 Tukang Besi Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Hari (08.00 - 22.00)
Stanbay
14 Tukang Besi Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Stanbay
15 Tukang Batu Hari (08.00 - 17.00) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
15
Total 79,980,000.00
Kabon UM Pekan 10
Kasbon UM Pekan 11
Kasbon UM Pekan 12
Kasbon UM Pekan 13
Sisa Upah