You are on page 1of 1

 34563464567trhytyhdtrhy

 The evaluation and qualification of the goffers will be in charge of the Qualifying Commission made up of
collaborators of VISION MUNDIAL BOLIVIA, which will be nominated prior to the opening of envelopes.

 2.gfhgd
 The qualification of the Administrative Documents whill consider the fulfillment or not in the presentation of
requested documents, the non-cohmpliance will determine the disqualification of the proponents, it will have a
value of 10% (ten percent) in the Final qualification.

1. 2.3 TECHNICAL PART, ENVELOPE “B”


2. The qualification of thhhhhhhhhhhghe Technical Part of the offer, will consider all the functional and technical
requirements established in the Annexes of this document, which weighted will have a value of 50% (fifty
percent) in the Final qualification.

2.4 ECONOMIC OFFER


3. The qualification of the Economic Offer will consider all the economic requirements requested by WORLD VISION
BOLIVIA and that weightdfed will have a value of 40% (Forty percent) in the Final qualification.
4. To obtain the price rating, the score for each offer (i) will be obtained using the following formula:

5. Where:
6. Pbest = Lowest price of all the offers that would have approved the qualification of envelope “B”
7. Pi = Is the price of offer i.

8. The weighting correspondibvncng to the price (40%) will be applied to the result obtained for each offer i, thus
obtaining the final score obtained by the economic offer i.

9. 2.5 FINAL QUALIncbnFICATION


10. The assessment of each of the requirements mentioned in the preceding paragraph will be the responsibility of
the Qualification Commission of VISION MUNDIAL BOLIVIA, for this pnnc24365463urpose, the following
distribution will be considered:
11. bvnbvn
12. Administrative Documents 10 points
13. Technical Aspects 50 Points
14. Econbvnbvombvnbvic Aspect 40 Points
15. Total 100 Points
16. 2.6 PENALTIESbvnbvnbv
17. The awarded bidder will be responsible for the economic damages caused to VISION MUNDIAL BOLIVIA, due to
non-compliance with the established delivery deadlines, duly verified between the parties.

18. If there are delays or non-compliance with the delivery terbvnbvnbvms, the SUPPLIER shall pay VISION MUNDIAL
BOLIVIA a penalty for each day of delay equivalent to 0.5% (Zero point Five percent) of the total Awarded amount
up to 10% (Ten percent ) of the vbvnbvnalue thereof, except in cases of force majeure or fortuitous events duly
verified and notified in writing and accepted bbvnbvnbvny VISION MUNDIAL BOLIVIA. The lack of notification will
annul the SUPPLIER's right and VISION MUNDIAL BOLIVIA will deduct the fine from the last paymenbvnbvt to be
made.

You might also like