Check the image/conveyance – Check before procedures – Check to ensure that the "READY" screen
appears.
Check the image/conveyance – Check before procedures – Perform "Secondary Erasure" on the
spontaneous radiation and image accumulated on the IP to be used.
Check the image/conveyance – Image/Conveyance checks – Record the IP, which was exposed as
instructed in "3.1 Check Before Procedures," under the following film output conditions, and output it.
Check the image/conveyance – Image/Conveyance checks – Check the image format. Make sure that the
white blank portion is 2 mm or less, as actually measured on the IP, from the outermost edge of the
image frame of the film outputted.
Check the image/conveyance – Checking the output characters – Check the following: The character
format information that has been set is correct.
Check the image/conveyance – Checking the output characters – Check the following: There is nothing
abnormal, such as blurred or broken characters.
Checking the Feed/Load conveyor unit – Shock absorbing rollers, guides, and rubber rollers – Make sure
that the spur gears are attached in such an orientation as illustrated below.
Checking the Feed/Load conveyor unit – Guides and rubber rollers – Make sure that the spacer is
attached properly.
Checking the Feed/Load conveyor unit – Brush roller – Make sure that the brush roller assembly and
brush rollers are attached in their correct orientations.
Checking the Feed/Load conveyor unit – Reinstalling the Feed/Load conveyor unit – Check to ensure
that the screws once removed are snugly retained.
Securing the machine – Checking for improper protective grounding – Check that the parts and cables
removed for servicing purposes are connected in the same manner as for installation.
Securing the machine – Checking for improper protective grounding – Check to ensure that the screws
once removed are snugly retained.
2 years (Every two years of machine use or whenever a process count of about 120,000 is reached.)
Check the image/conveyance – Check before procedures – Check to ensure that the "READY" screen
appears.
Check the image/conveyance – Check before procedures – Perform "Secondary Erasure" on the
spontaneous radiation and image accumulated on the IP to be used.
Check the image/conveyance – Image/Conveyance checks – Record the IP, which was exposed as
instructed in "3.1 Check Before Procedures," under the following film output conditions, and output it.
Check the image/conveyance – Image/Conveyance checks – Check the image format. Make sure that the
white blank portion is 2 mm or less, as actually measured on the IP, from the outermost edge of the
image frame of the film outputted.
Check the image/conveyance – Checking the output characters – Check the following: The character
format information that has been set is correct.
Check the image/conveyance – Checking the output characters – Check the following: There is nothing
abnormal, such as blurred or broken characters.
Checking the cassette set unit – Make sure that the route of the hose is stress-free and normal.
Checking the Feed/Load conveyor unit – Shock absorbing rollers, guides, and rubber rollers – Make sure
that the spur gears are attached in such an orientation as illustrated below.
Checking the Feed/Load conveyor unit – Guides and rubber rollers – Make sure that the spacer is
attached properly.
Checking the Feed/Load conveyor unit – Brush roller – Make sure that the brush roller assembly and
brush rollers are attached in their correct orientations.
Checking the Feed/Load conveyor unit – Reinstalling the Feed/Load conveyor unit – Check to ensure
that the screws once removed are snugly retained.
Perform the removal of the Post-Reading conveyor unit (For CR-IR 362).
Securing the machine – Checking for improper protective grounding – Check that the parts and cables
removed for servicing purposes are connected in the same manner as for installation.
Securing the machine – Checking for improper protective grounding – Check to ensure that the screws
once removed are snugly retained.
3 years (Every three years of machine use or whenever a process count of about 180,000 is reached.)
Check the image/conveyance – Check before procedures – Check to ensure that the "READY" screen
appears.
Check the image/conveyance – Check before procedures – Perform "Secondary Erasure" on the
spontaneous radiation and image accumulated on the IP to be used.
Check the image/conveyance – Image/Conveyance checks – Record the IP, which was exposed as
instructed in "3.1 Check Before Procedures," under the following film output conditions, and output it.
Check the image/conveyance – Image/Conveyance checks – Check the image format. Make sure that the
white blank portion is 2 mm or less, as actually measured on the IP, from the outermost edge of the
image frame of the film outputted.
Check the image/conveyance – Checking the output characters – Check the following: The character
format information that has been set is correct.
Check the image/conveyance – Checking the output characters – Check the following: There is nothing
abnormal, such as blurred or broken characters.
Checking the Feed/Load conveyor unit – Shock absorbing rollers, guides, and rubber rollers – Make sure
that the spur gears are attached in such an orientation as illustrated below.
Checking the Feed/Load conveyor unit – Guides and rubber rollers – Make sure that the spacer is
attached properly.
Checking the Feed/Load conveyor unit – Brush roller – Make sure that the brush roller assembly and
brush rollers are attached in their correct orientations.
Checking the Feed/Load conveyor unit – Reinstalling the Feed/Load conveyor unit – Check to ensure
that the screws once removed are snugly retained.
Securing the machine – Checking for improper protective grounding – Check that the power cable and
additional protective ground wire connections are established in the same manner as for installation.
Securing the machine – Checking for improper protective grounding – Check that the parts and cables
removed for servicing purposes are connected in the same manner as for installation.
Securing the machine – Checking for improper protective grounding – Check to ensure that the screws
once removed are snugly retained.