PFKSB PIT STOP 2012

MECHANICAL WORK LIST


SUMMARY OF MECHANICAL STATIC WORK LIST
FOR AMMONIA PLANT
NO.

TAG NO.

EQPT. NAME

H-13-01

Primary Reformer

R-13-01

Secondary Reformer

E-14-02 C & D

BFW Preheater No.1

E-15-03

Process Gas/DFW Exchanger

E-15-01

LP Boiler

E-15-01

LP Boiler

C-15-02 & C-15-01

8
9
10
11

E-17-01A & B
H-18-01
E-18-02 A
E-18-02 B & C

CO2 Regenerator & CO2


Absorber
HP Methanator Exchanger
Start Up Heater
BFW Preheater A
BFW Preheater B & C

WORK LIST

CURRENT PROBLEMS/JUSTIFICATIONS
1) Hotspot at various location, temperature exceed limit at certain locations. Only can be rectified during
shutdown.
1) Check valve process air - frequent hissing sound. To replace bolt and nut. Only can be rectified during
shutdown.

1) Channel head is leaking - Sparger is on. Suggest to replace gasket. Only can be done during shutdown.

1) Rectify defect at gasket seat. Defect from last TA.


1) Channel head is leaking - Sparger is on. Suggest to replace gasket. Repair bottom nozzle.
1) Thick, hard deposit at internal shell based on history. Suggest to clean it.
1) To take opportunity inspect tray condition and repair any defect found.
1) Bottom manhole is leaking - Sparger is on. Suggest to replace gasket.
1) Replacement.
1) Replacement of E-18-02A leak. Bad actor registered by RIM.
1) Suggest to perform intrusive inspection by Inspection Section.

TAG NO.

EQPT. NAME

H-13-01
Primary Reformer
R-13-01
Secondary Reformer
E-14-02 C & D
BFW Preheater No.1
E-15-03
Process Gas/DFW Exchanger
E-15-01
LP Boiler
E-15-01
LP Boiler
C-15-02 & C-15-01 CO2 Regenerator & CO2 Absorber
E-17-01A & B
HP Methanator Exchanger
H-18-01
Start Up Heater
E-18-02 A
BFW Preheater A
E-18-02 B & C
BFW Preheater B & C
E-20-03
Stripper Feed Exchanger

MANPOWER COST

MATERIAL COST

EQPT. COST

LUMP SUMP
COST

1OOOOOO.00

TAG.NO
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03

No
Activity Description
Int. insp./cleaning, Remove Chn Head, open shell nozzle-B1, air blow tube int, VI, Vide
HTW@ chn. head.
Erect external scaffolding @ both channel heads
1
Remove insulation @ both channel heads (For UTFD)
2
Prepare and install temporary lifting device
3
Remove both channel heads and open nozzle B1 for
3
videoscope
Pre Inspection and deposit sampling (BY PFK)
5
Preparation for machining defected nozzle
6
Machining defected nozzle
7
Preparation for machining defected nozzle
8
Machining defected tube sheet flange
9
Inspection (NDT)
10
Blow dry tube internal and clean/wipe cloth tubesheet
11

E-15-03

12

E-15-03

13

E-15-03

14

E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03
E-15-03

15
16
17
18
19
20
21
22

C-15-01

Channel head internal cleaning; power brush @ all internal


weldment areas and clear any nozzle blockage
Clean gasket seating surface @channel head, flanges- power
brush & scrapper
Wire brush all bolts (full length) apply antiseize compound replace defective bolts
Post Inspection as per SOE (BY PFK)
DOSH Inspection (BY PFK)
Final inspection prior to box up ( by PFK)
Reinstall channel head and JIT ( witness BY PFK )
Hydraulic Torque@ channel head bolting
Refit Insulation
Remove external scaffolding
Housekeeping

Int. insp. Open MHs(7) & tray manways, erect int.scaffold @ bottom, vacuum demister, VI and UTTM, inspec

C-15-01

Erect external scaffolding @ bottom column drain nozzle- B5

C-15-01

Remove insulation @ manhole M1 to M7

C-15-01

Fit isolation as per EIS for C-15-01, remove pump suction


strainers @P-15-02A/B

C-15-01

Open all m/holes - M1~M7

C-15-01

Fit ventilator c/w plywood cover @ manhole M1, M3, M5 and


M7

C-15-01

Prepare for entry - cooling down (BY PFK)

C-15-01

Provide int. lighting @ m/holes and expandable ladder @ M2,


M4, M6 and M7

C-15-01

Pre inspection and deposit sampling (By PFK)

C-15-01

Erect int. scaffold for cleaning and insp @ M6 and M7

C-15-01

10

C-15-01

11

C-15-01

12

C-15-01

13

Demister measurement By PFK ENG

C-15-01

14

Demister cleaning; water jet/air blow and tie up any loose


demister with SS tie wire.

C-15-01

15

Internal Cleaning; wire brush/wipe cloth internal

Remove m/way of ballast tray # 1,2 and 3 @ M1


Chimney tray leak test @ M4 and M5 - drop level rate =
0.5cm/min (witness By PFK)
Identify/Marking, and remove internal demister and put to the
ground level

Internal Cleaning; power brush circ. weld., long weld seams,


nozzle to shell weldment where feasible as per SOE. Power
brush weldment at reinforcement pad of last defect @bottominternal.
Dismantle column internals@ bed limiter, distributor, internal
piping at locations as instructed by PFK OPS
Clean gasket seating surface @ m/holes, flanges - power
brush, & scrapper
Wire brush all stud bolt (full length) and apply antiseize
compound - replace defective stud bolt
Contigency: Repair Work @ redistributor pipe, chimney
trays@M4, trays. Replace chimney tray gasket after chimney
tray leak test.

C-15-01

16

C-15-01

17

C-15-01

18

C-15-01

19

C-15-01

20

C-15-01

21

C-15-01

22

Post Inspection as per SOE (By PFK)

C-15-01

23

DOSH Inspection (By PFK)

C-15-01

24

Packing Inspection By PFK OPS - Top up new SS packings(as


instructed by OPR )

C-15-01

25

Refit column internals and tighten all boltings

C-15-01

26

Lift up and refit demister - Tighten all demister boltings

C-15-01

27

Refit ballast tray m/way #1,2 and 3 and retigthen tray clamps
where accessable, replace missing bolt & nuts for all
trays(bolts tightening inspection BY PFK;ENG,OPR)

C-15-01

28

Remove internal scaffold

C-15-01

29

Remove int. ventilator, lighting and expandable ladder

C-15-01

30

Final Inspection prior to Box-up (By PFK)

C-15-01

31

Close all m/holes & JIT (Witness By PFK)

C-15-01

32

Remove isolation/reinstatement & JIT

C-15-01

33

Clean and re-instate suction strainer @ P-15-02A/B

C-15-01

34

Refit insulation

C-15-01

35

Remove external scaffolding

C-15-01

36

Housekeeping
TOTAL

C-15-02

Int. inspection: Open MHs(6) & tray manways, erect internal scaffold, vacuum demister,VI and UTTM, insp. V

C-15-02

Remove insulation @ m/hole M1 to M6

C-15-02

Fit isolation as per EIS for C-15-02

C-15-02

Remove suction strainer of pump P-15-01A/B and full open


suction line drain valve

C-15-02

Remove all manholes. M1~M6

C-15-02

Fit ventilator c/w plywood cover @ m/hole M1,M3 and M5

C-15-02

Prepare for entry - cooling down (By PFK)

C-15-02

Provide int. lighting @ m/hole M2,M4 AND M6

C-15-02

Pre Inspection and deposit sampling (By PFK)

C-15-02

Remove m/way of ballast tray # 1,2 AND 3 @ M1

C-15-02

10

Erect int. scaffold @ btm part of column, M6

C-15-02

11

Identify/Marking, and remove internal demister and put to the


ground level

C-15-02

12

Demister measurement By PFK ENG

C-15-02

13

Demister cleaning- water jet/air blow and tie up any loose


demister with SS tie wire.

C-15-02

14

Internal Cleaning; wire brush/wipe cloth internal

C-15-02

15

C-15-02

16

C-15-02

17

Contigency:Repair and replace tray distributor collector @


nozzle A2, A3
Clean gasket seating surface @ m/holes, flanges - power
brush, scrapper
Wire brush all stud bolt (full length) and apply antiseize
compound - replace defective stud bolt

C-15-02

18

Post inspection as per SOE (BY PFK)

C-15-02

19

Dosh inspection (BY PFK)

C-15-02

20

Lift up and refit demister - Tighten all demister boltings

C-15-02

21

Refit ballast tray m/way #1,2 and 3 and retighten tray clamps
where accessible(bolt tightening inspection By PFK;ENG,OPR)

C-15-02

22

Remove int. scaffold

C-15-02

23

Remove int. ventilator, lighting AND expandable ladder

C-15-02

24

Final inspection prior to Box-up (By PFK)

C-15-02

25

Close all m/holes & JIT (Witness By PFK)

C-15-02

26

Remove isolation/reinstatement & JIT

C-15-02

27

Clean and re-instate suction strainer @ P-15-01A/B

C-15-02

28

Refit insulation

C-15-02

29

Housekeeping
TOTAL

E-14-03

Remove OLS clamps,open manhole,machinig gasket surface

E-14-03

Erect scaffolding @ manhole

E-14-03

Fit isolation as per EIS E-14-03

E-14-03

Remove OLS clamp

E-14-03

Remove manhole cover

E-14-03

Remove Stud bolt for manhole.


cut and drill stud bolt

E-14-03

Pre inspection

E-14-03

Preparation for machining

E-14-03

Machining on gasket surface area

E-14-03

NDT

E-14-03

10

Final inspection prior to box-up

E-14-03

11

Install new stud bolt

E-14-03

12

install new gasket

E-14-03

13

Install manhole cover

E-14-03

14

HBT & JIT

E-14-03

15

Remove isolation as per EIS E-14-03

E-14-03

16

Remove scaffolding

E-14-03

17

Housekeeping

E-14-03

30

E-14-03

31

E-17-01A

Open top & bottom cover,machining , inspection

E-17-01A

Erect scaffolding

E-17-01A

Remove insulation @ Nozzles

E-17-01A

Fit isolation as per EIS E-17-01A

E-17-01A

Open bottom and top cover(HTW)

E-17-01A

Drop bottom and top cover

E-17-01A

remove stud bolt at bottom & top cover

E-17-01A

Clean all stud bolt

E-17-01A

Pre inspection

E-17-01A

Preparation for machining

E-17-01A

10

machining both cover

contigency : to

E-17-01A

11

Post inspection (NDT)

E-17-01A

12

Install stud bolt for bottom and top cover

E-17-01A

13

Final Inspection prior to Box up (By PFK)

E-17-01A

14

Install bottom and top cover

E-17-01A

15

HTW & JIT

E-17-01A

16

Remove isolation as per EIS E-17-01A

E-17-01A

17

Fit insulation

E-17-01A

18

Remove scaffolding

E-17-01A

19

Housekeeping

E-17-01B

Open top & bottom cover,machining , inspection

E-17-01B

Erect scaffolding

E-17-01B

Remove insulation @ Nozzles

E-17-01B

Fit isolation as per EIS E-17-01A

E-17-01B

Open bottom and top cover(HTW)

E-17-01B

Drop bottom and top cover

E-17-01B

remove stud bolt at bottom & top cover

E-17-01B

Clean all stud bolt

E-17-01B

Pre inspection

E-17-01B

Preparation for machining

E-17-01B

10

machining both cover

E-17-01B

11

Post inspection (NDT)

E-17-01B

12

Install stud bolt for bottom and top cover

E-17-01B

13

Final inspection

E-17-01B

14

Install bottom and top cover

E-17-01B

15

HTW & JIT

E-17-01B

16

Remove isolation as per EIS E-17-01A

E-17-01B

17

Fit insulation

E-17-01B

18

Remove scaffolding

E-17-01B

19

Housekeeping

E-17-01B

20

E-17-01B

21

E-15-01
E-15-01

Int. insp./cleaning thru manhole,remove channel head, air blow int. tubes, open shell manhole,remove hard
@ nozzle B3. 4) Remove and service gate valve.
1
Erect scaffold @ channel head & m/hole M

E-15-01

Remove Insulation @ Channel Head & Nozzle A1 pipe spool

E-15-01

Fit isolation as per EIS E-15-01

E-15-01

Support tube sheet with wooden block,jack and level block to


prevent tube sheet movement and preparation for remove
channel head.

E-15-01

Remove channel head/ pipe spool

E-15-01

Open m/hole M

E-15-01

Reinstall boltings (tubesheet to shell) to prevent tubesheet


movement

E-15-01

Fit ventilator c/w plywood @ manhole M

E-15-01

Prepare for entry (BY PFK)

E-15-01

10

Provide internal lighting & expandable ladder

E-15-01

11

Pre-inspection & deposit sampling (BY PFK)

E-15-01

12

E-15-01

13

E-15-01

14

E-15-01

Blow dry tube internal and clean/wipe cloth tubesheet


Shell internal cleaning; remove sludge/hard deposit where
accessible ( may required jack hammer)
Channel head internal cleaning; power brush @ all internal
weldment areas and clear any nozzle blockage
Defect: 1)To service 15 LG 04 2) To service 16" gate valve
@NB3
Clean gasket seating surface @channel head, flanges- power
brush & scrapper
Wire brush all bolts (full length) apply antiseize compound replace defective bolts

E-15-01

15

E-15-01

16

E-15-01

17

Post Inspection as per SOE (By PFK)

E-15-01

18

DOSH Inspection (By PFK)

E-15-01

19

Remove internal lighting & expandable ladder

E-15-01

20

Final inspection prior to box-up ( By PFK)

E-15-01

21

Close Manhole M and JIT (witness By PFK)

E-15-01

22

Reinstall channel head (new set of boltings) and pipe


spool,remove level block,jack & wooden block ( Witness By
PFK)

E-15-01

23

Hydraulic Bolt Tensioning @ channel head boltings

E-15-01

24

Remove isolation/reinstatemant & JIT

E-15-01

25

Refit Insulation

E-15-01

26

Remove external scaffolding

E-15-01

27

Remove lifting part and Housekeeping

R-13-01
R-13-01

Int. insp., remove top cover c/w burner & insp. tip, insp. air inlet check valve,catalyst change out, VI and UTT
paint, HBT@ top cover, repair any damage internal refractory, catalyst change out (by PFK vendor), Refract
erect ext.scaff. for UTFD. Body test Service 12" check valve, replace bolt & nuts.
Erect external scaffolding @ top cover,manhole M, inlet check
1
valve and reactor surrounding for painting work

R-13-01

Remove insulation @inlet pipe spool and check valve

R-13-01

Mobilized top cover support structure to the site (crane & low
loader required), position it opposite the reactor (next to the
road)

R-13-01

Fit isolation as per EIS for H-13-01 (Refer to H-13-01 EIS)

R-13-01

Remove top pipe spool and send check valve to w/shop for
service

R-13-01

Unbolt top cover boltings and open manhole M

R-13-01

Remove top cover c/w mixer & spool (crane & chain block
required) and properly place it on the support structure

R-13-01

Erect scaffolding @mixer for inspection

R-13-01

Erect scaffolding shade with canvas above reactor opening and


platform

R-13-01

10

Fit ventilator c/w plywood @ M

R-13-01

11

Prepare for entry (By PFK)

R-13-01

12

Prepare internal lighting and exandable/rope laddder

R-13-01

13

Pre inspection and deposit sampling (By PFK)

R-13-01

14

Catalyst unloading By PFK Vendor

R-13-01

15

Internal cleaning; industrial vacuum clean

R-13-01

Contigency: Erect internal scaffolding for refractory repair

R-13-01

Contigency: Repair damaged internal refractory and manhole


plug M

R-13-01

16

Cover all blasting area with canvas

R-13-01

17

R-13-01

18

R-13-01

19

Replace check valve

R-13-01

20

Post inspection as per SOE (By PFK)

Surface preparation/inspection on shell external for painting:


sweep blast
Painting thermosensitive paint @ reactor shell external
(Material By PFK)

R-13-01

21

Dosh inspection (By PFK)

R-13-01

22

Catalyst loading By PFK Vendor

R-13-01

23

Remove shade above reactor opening

R-13-01

24

Remove internal ventilator, lighting and ladder

R-13-01

25

Final inspection prior to box-up (By PFK;ENG,OPR)

R-13-01

26

Reinstall top cover [including mixer] - crane and chain block


required

R-13-01

27

Hydrolic torque @ top cover boltings

R-13-01

28

Reinstall top spool and check valve

R-13-01

29

Hydrolic torque @ at nozzle A2

R-13-01

30

Closed manhole M and JIT

R-13-01

31

Remove isolation (Info only; refer to H-13-01 JMS AND EIS for
details)

R-13-01

32

Remove scaffolding

R-13-01

33

Transport top cover support structure back to Mechanical


workshop

R-13-01

34

Housekeeping

E-18-02A

Install new exchanger


1

Erect scaffolding

Remove insulation

Installation of lifting lug at SG pipe spool

Preparation of welding jigs for fit up, backing gas, etc

Mobilize new equipment to site

Removal of control valve 18-TV-24 for isolation purpose

Venting out remaining process gas at 18-TV-24 and make


water trap at bottom E-18-02C SG line

Install jack at temporary pipe support (18-SG-18007)

Crane setup and secure SG pipe to the crane

10

Mark location to be cut (top and bottom of equipment, SG and


BFW line)

11

Installation of cold cutting machine (SG line)

12

Cold cutting works (SG line) - Cut and bevel

13

Installation of cold cutting machine (BFW line)(8-BFW-18001)

14

Cold cutting works (BFW line) - Cut and bevel

15

Jack the SG pipe (18-SG-18007) to give space for lifting

16

Remove the SG pipe spool from site

17

Remove the BFW pipe from site

18

Cut the new E-18-02A to the same length of the removed pipe,
and prepare the welding jigs for fit up

19

NDT at 18-SG-18007 pipe bevel to find crack at bevel surface

20
21

Preparation for hydrogen relieving at existing pipe 18-SG18007 and Top E-18-02B nozzle channel head
Hydrogen relieving works at both 18-SG-18007 and top E-1802B nozzle

22

Cooling down SG pipe

23

NDT at pipe and nozzle bevel after hydrogen relieving

24

Secure the new E-18-02A equipment to the crane boom


Heavy lifting work. Lifting the equipment to the required
location
Initial fit up activities, jacking works, aligning works, welding
root gap, instalation of shim plate etc
Tack weld the equipment to the pipes (SG and BFW) and
nozzles (SG).

25
26
27

28

Root welding at the 18-SG-18007 and nozzles

29

NDT at root welding

30

Full welding and complete weld capping

31

Preparation for PWHT at SG line and nozzle

32

PWHT works

33

Cooling down SG pipe

34

NDT at SG piping weldment and nozzle weldment

35

Root weld at BFW line (3 joints)

36

Full weld at BFW line (3 joints)

37

NDT at BFW line weldments

38

Install the bolting at equipment support/saddle

39

Reinstallation of control valve 18-TV-24, Removal of water trap


at E-18-02C

40

Housekeeping

41
42
43
44

E-18-02B

Intrusive inspection
1

Manhole cover opening

Grinding diaphragm gasket

Pre inspection

Partition plate removal

Install balloon

Internal inspection

Partition plate reinstall

Weld diaphragm gasket

Manhole cover closing

10

E-18-02C

Intrusive inspection

E-18-02C

Manhole cover opening

E-18-02C

Grinding diaphragm gasket

E-18-02C

Pre inspection

E-18-02C

Partition plate removal

E-18-02C

Install balloon

E-18-02C

Internal inspection

E-18-02C

Partition plate reinstall

E-18-02C

Weld diaphragm gasket

E-18-02C

Manhole cover closing

E-18-02C

10

E-20-03
E-20-03

Int. insp./cleaning: remove Chn Head, pull bundle, hydrojet tubes, VI, Videoscope (5%), UTFD and UTTM, le
insulation at nozzle for UTFD.
1
CW system LT by opr.(By PFK)

E-20-03

Fit isolation as per EIS E-20-03 (for press. test)

E-20-03

Remove channel head

E-20-03

Pre inspection & deposit sampling (By PFK)

E-20-03

E-20-03

E-20-03

Install test-ring and all boltings for pressure test

E-20-03

Hydrojet and blow dry tube internal

E-20-03

Power brush tube sheet

E-20-03

11

Leak test (air at 4.0 barg) (Witness By PFK;Insp)

E-20-03

12

Contigency repair

E-20-03

13

E-20-03

14

E-20-03

15

E-20-03

16

E-20-03

17

E-20-03

18

E-20-03

19

Mobilize Channel Head from blasting yard

E-20-03

20

Post Inspection as per SOE (By PFK)

E-20-03

21

DOSH Inspection - By PFK

E-20-03

22

Final Inspection prior to Box-up (witness by PFK)

E-20-03

23

Reinstall tube bundle (Witness by PFK)

E-20-03

24

Reinstall channel head (Witness by PFK)

E-20-03

25

Remove isolation and JIT

E-20-03

26

Housekeeping

Transport channel head to designated blasting yard for


blasting / painting work
Channel head internal blasting, coating with Tar free modified
epoxy. Inspection by PFK

Hydrotest (1.25 x MAWP) subject to repair work (Witness By


PFK;Insp)
Pull tube bundle (Support bundle with wooden block if on the
ground)
Pre inspection & deposit sampling @ tube bundle and shell
internal (By PFK)
Hydrojet and blow dry @ tube bundle and shell internal (wedge
open nozzle SO)
Clean all gasket seating surface@ channel head, flangespower brush and scrapper
Wire brush all stud bolts (full length) and apply antiseize
compound - replace defective stud bolt

Mech
Pipe Fitter Semi skill
Hlpr
Rigg
Trade
Fitter
1, air blow tube int, VI, Videoscope, UTFD and UTTM, cleaning @ internal Chn Head,
Scaffolder
Insulator
Rigger
Mech Fitter
Inspection
helper
helper
helper
helper
Inspection

2
2
1

1
1

Hydro
Jetter

Welder

1
1

1
1
2
1
1
2

1
1

Mech Fitter
Mech Fitter
Semi Skill
Inspection
DOSH
Mech Fitter
Mech Fitter
HTW
Insulator

2
1
1
1
1
1
2

10

1
1
1
2
2

19

um demister, VI and UTTM, inspect weld repair at reinforcement pad of last defect. Repair and replace tray distributor collector @ nozzle A2, A3
Scaffolder
Insulator
Mech Filter

Mech Fitter

Semi skill

OPR
Semi Skill
Inspection

Scaffolder

Mech Fitter

Mech Fitter

Mech Fitter

ENG

Mech Fitter

Mech Fitter

Mech Fitter

Mech Fitter

Hlpr

Helper

Inspection

DOSH

Semi skill

Mech Fitter

Mech Fitter

Mech Fitter

Scaffolder
Helper

ENG/OPR

Mech Fitter

Mech Fitter

Mech Fitter

1
2

Insulator
Scaffolder
Helper

2
22

24

33

uum demister,VI and UTTM, insp. Vortex breaker


Insulator
Mech Fitter

Mech Fitter

Mech Fitter

Semi Skill

Operation
Semi skill
Inspection

Mech Fitter

Mech Fitter

ENG

Scaffolder

Mech Fitter

Mech Fitter

Mech Fitter

Helper

Inspection

DOSH

Mech Fitter

Mech Fitter

Scaffolder
Semi Skill
OPR/ENG

Mech Fitter

Mech Fitter

Mech Fitter

Insulator
Helper

2
30

33

26

Scaffolder
Mech Fitter

Mech Fitter

Mech Fitter

Mech Fitter

Inspection
machinist

machinist

Inspection
Opr/Mech
Mech Fitter

Mech Fitter

Mech Fitter

HBT
Mech Fitter

1
2

Scaffolder
Helper

16

13

Scaffolder
Insulator
Mech Fitter

Mech Fitter

Mech Fitter

Mech Fitter

Helper

Inspection
Machinist
Machinist

Inspection
Mech Fitter

Inspection
Mech Fitter
HTW
Mech Fitter

2
2

Insulator
Scaffolder
Helper

2
14

18

Scaffolder
Insulator
Mech Fitter

Mech Fitter

Mech Fitter

Mech Fitter

Helper

Inspection
Machinist

Machinist
Inspection
Mech Fitter

Inspection
Mech Fitter
HTW
Mech Fitter

2
2

Insulator
Scaffolder
Helper

14
0
18
4
2
0
0
open shell manhole,remove hard deposite, VI, Videoscope and UTTM. DEFECT: 1) To service 15 LG 04. 2) To repair piping header. 3) To service globe valve
Scaffolder
Insulator
Mech Fitter

Mech Fitter

1
1

Mech Fitter

Mech Fitter

Mech Fitter

Semi Skill

Opr

Semi Skill

Inspection

Semi Skill
Mech Fitter

Semi Skill

Mech Fitter

Semi Skill

Inspection
DOSH

1
1

Semi Skill

ENG/OPR

Mech Fitter

Mech Fitter

1
2
2

HBT
Mech Fitter

2
1

Insulator
Scaffolder
Helper

12
0
ve,catalyst change out, VI and UTTM, repainting with thermo sens.
ange out (by PFK vendor), Refractory repair work (by PFK vendor),
& nuts.
Scaffolder

20

19

Insulator
Rigger

Mech fitter

Mech fitter

Rigger

Scaffolder
Scaffolder
PFK Vendor
OPR
PFK Vendor
Inspector

PFK Vendor
PFK Vendor

Semi skill
Mech fitter

2
1

2
1

Painter
Semi skill
Inspector

DOSH
PFK Vendor
Scaffolder
Semi skill

ENG,OPR

Mech fitter

HTW
Mech fitter

HTW
Mech fitter

1
2

Scaffolder
Rigger

Helper

4
14

19

26

Scaffolder
Insulator
1

1
2

1
2

Operation
2

Inspection
2
1
1
1
2
1

RAWNA
Inspection
1
1

2
1

1
1

2
20

Mech Fitter

Pipe Fitter

10

12

1
1

Mech Fitter

Mech Fitter

Inspection

1
2

Welder
Mech Fitter

Inspection

Mech Fitter

33

2
1

1
2
2

10

Mech Fitter

Pipe Fitter

11

1
1

Mech Fitter

Mech Fitter

Inspection

1
2

Welder
Mech Fitter

Inspection

Mech Fitter

2
1

1
2

10
2
11
eoscope (5%), UTFD and UTTM, leak test, Chn Head internal painting, open

Opr
Mech Fitter

Mech Fitter

Inspection

Semi Skill

Blaster/ painter
Mech Fitter

Hydrojetter

Mech Fitter

Mech Fitter

Mech Fitter

Inspection

Hydrojetter

Mech Fitter

Semi Skill

Semi Skill

Inspection

DOSH

OPN/ENG

Mech Fitter

1
1

Mech Fitter

Mech Fitter

Helper

2
12

17

12

Painter

Hour

Mhr(P)

Mech
Fitter

0
0
4
5
1
1
1
2
1
0
2

2
7.5
1
1
2
2
4
6

0
0
8
37.5
1
1
2
4
4
0
12

0.00
0.00
0.00
7.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
7.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2
2
1
1
2
5
2
0
38

1.7
2
1.3
1
1.5
7.8
3

3.4
4
1.3
1
3
39
6
0
149.2

0.00
0.00
0.00
1.00
1.50
15.60
0.00
0.00
25.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0

0.00
0.00
0.00
0.00
1.50
31.20
0.00
0.00
40.2

Total Qty

53.8

Pipe Fitter Semi skill

Hlpr

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.50

10.00

5.00

0.00

5.00

0.00

7.60

30.40

15.20

0.00

15.20

0.00

1.50

3.00

0.00

0.00

1.50

1.50

0.00

0.00

0.00

0.00

0.00

0
2

2.00

4.00

0.00

0.00

2.00

2.00

1.00

2.00

1.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

1
3

1.20

3.60

1.20

0.00

1.20

1.20

6.00

18.00

6.00

0.00

6.00

6.00

2.00

8.00

2.00

0.00

2.00

4.00

0.50

1.00

0.50

0.00

0.00

0.50

6.00

18.00

0.00

0.00

6.00

12.00

61.90

371.40

0.00

0.00

123.80

247.60

1.00

2.00

1.00

0.00

0.00

1.00

3.00

12.00

3.00

0.00

3.00

6.00

3.50

14.00

0.00

0.00

7.00

7.00

2.50

5.00

0.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

1.70

3.40

1.70

0.00

0.00

1.70

1.00

1.00

1.00

0.00

0.00

0.00

6.00

24.00

0.00

0.00

6.00

12.00

3.00

12.00

3.00

0.00

3.00

6.00

4.00

20.00

8.00

0.00

4.00

4.00

1.50

3.00

1.50

0.00

1.50

0.00

0.00

0.00

0.00

0.00

0.00

2.00

4.00

0.00

0.00

2.00

2.00

2.00

6.00

2.00

0.00

0.00

4.00

9.30

37.20

18.60

0.00

18.60

0.00

2.60

5.20

2.60

0.00

2.60

0.00

1.10

2.20

1.10

0.00

1.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

2.00

0.00

0.00

0.00

2.00

81

137.40

622.40

74.40

0.00

211.50

326.50

0.00

0.00

0.00

0.00

0.00

0
8

2.15

17.20

8.60

0.00

8.60

0.00

3.00

12.00

6.00

0.00

6.00

0.00

4.50

36.00

18.00

0.00

18.00

0.00

1.50

3.00

0.00

0.00

1.50

1.50

0.00

0.00

0.00

0.00

0.00

1.50

3.00

0.00

0.00

1.50

1.50

1.00

2.00

1.00

0.00

0.00

1.00

1.20

3.60

1.20

0.00

1.20

1.20

0.00

0.00

0.00

0.00

0.00

0
5

4.00

20.00

4.00

0.00

4.00

8.00

1.00

2.00

1.00

0.00

0.00

1.00

6.00

18.00

0.00

0.00

6.00

12.00

39.50

237.00

0.00

0.00

79.00

158.00

0.00

0.00

0.00

0.00

0.00

3.00

12.00

0.00

0.00

6.00

6.00

2.50

5.00

0.00

0.00

0.00

5.00

1.70

3.40

1.70

0.00

0.00

1.70

1.00

1.00

1.00

0.00

0.00

0.00

4.00

20.00

8.00

0.00

4.00

4.00

1.50

4.50

1.50

0.00

1.50

1.50

0.00

0.00

0.00

0.00

0.00

0
4

1.50

6.00

0.00

0.00

3.00

3.00

1.70

5.10

1.70

0.00

0.00

3.40

5.00

40.00

20.00

0.00

20.00

0.00

2.50

20.00

10.00

0.00

10.00

0.00

3.30

13.20

6.60

0.00

6.60

0.00

0.00

0.00

0.00

0.00

0.00

1.00

2.00

0.00

0.00

0.00

2.00

91

94.05

486.00

90.30

0.00

176.90

210.80

0.00

0.00

0.00

0.00

0
4

16

8.00

0.00

8.00

0.00

16

8.00

0.00

8.00

0.00

4.00

0.00

2.00

0.00

24

16.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0
1

0.00

0.00

2.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

2.00

0.00

2.00

0.00

1.00

0.00

4.00

0.00

2.00

0.00

0.00

0.00

0.00

2.00

16

8.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100

54.00

0.00

45.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0
2

29

37

16

8.00

0.00

8.00

0.00

32

16.00

0.00

16.00

0.00

30

12.00

0.00

12.00

0.00

32

16.00

0.00

16.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

12

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0
2
0

0
4

0
er. 3) To service globe valve

0.00

0.00

0.00

0.00

32

16.00

0.00

16.00

0.00

0.00

0.00

0.00

0.00

30

12.00

0.00

12.00

0.00

16

0.00

0.00

16.00

0.00

16

8.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

38

61

222

88.00

0.00

106.00

16.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16

8.00

0.00

8.00

0.00

32

16.00

0.00

16.00

0.00

30

12.00

0.00

12.00

0.00

32

16.00

0.00

16.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

12

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32

16.00

0.00

16.00

0.00

0.00

0.00

0.00

0.00

30

12.00

0.00

12.00

0.00

16

0.00

0.00

16.00

0.00

16

8.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

222

88.00

0.00

106.00

16.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0
38

61

0.8

1.6

0.80

0.00

0.80

0.00

0.00

0.00

3.00

3.00

8.3

41.5

8.30

0.00

16.60

8.30

2.00

0.00

2.00

0.00

12

3.00

0.00

3.00

6.00

0.00

0.00

1.00

1.00

0.00

0.00

1.00

0.00

0.00

0.00

1.00

1.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

18

54

0.00

0.00

18.00

36.00

0.00

0.00

2.00

2.00

0.00

0.00

0.00

0.00

1.7

3.4

0.00

0.00

1.70

1.70

1.5

0.00

0.00

1.50

1.50

0.00

0.00

2.00

0.00

1.2

1.2

1.20

0.00

0.00

0.00

0.00

0.00

1.00

1.00

1.7

3.4

1.70

0.00

0.00

1.70

1.25

2.50

0.00

2.50

0.00

8.6

43

17.20

0.00

0.00

17.20

0.00

0.00

0.00

8.00

1.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

54

65.05

207.1

37.70

0.00

59.10

90.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.50

3.00

0.00

0.00

0.00

0.00

1.5

0
5

1.8

3.60

0.00

3.60

0.00

48

16.00

0.00

16.00

16.00

30

10.00

0.00

10.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.50

0.00

0.00

0.00

0.00

0.5

0
2

0.00

0.00

1.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32

0.00

0.00

16.00

16.00

2.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0
4

16

4.00

0.00

4.00

4.00

1.3

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

1.00

1.2

3.6

1.20

0.00

0.00

2.40

36

12.00

0.00

12.00

6.00

10

0.00

0.00

0.00

10.00

2.00

0.00

2.00

0.00

0.00

0.00

0.00

2.00

1.25

2.50

0.00

2.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.5

0.00

0.00

1.50

3.00

12

0.00

0.00

0.00

12.00

66

56.05

230.6

53.3

71.6

83.9

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

2.00

0.00

2.00

0.00

2.00

2.00

0.00

0.00

2.00

16

8.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0
3

4.00

0.00

0.00

2.00

10

4.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0
2

0.00

0.00

0.00

4.00

12

12

0.00

0.00

0.00

12.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

4.00

4.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

12

12

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15

6.00

0.00

0.00

6.00

20

8.00

0.00

0.00

8.00

42

12.00

0.00

12.00

12.00

2.00

0.00

0.00

2.00

0.00

3.00

0.00

0.00

0.00

144

0.00

0.00

0.00

48.00

0.00

0.00

0.00

2.00

12

12

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

12

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

16

8.00

0.00

8.00

0.00

16

8.00

0.00

8.00

0.00

16

0.00

0.00

0.00

16.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

83

125

404

66

39

161

12

6.00

0.00

6.00

0.00

0.00

3.00

0.00

3.00

0.00

0.00

1.00

0.00

16

8.00

0.00

8.00

0.00

4.00

0.00

2.00

0.00

0.00

0.00

4.00

0.00

16

8.00

0.00

8.00

0.00

0.00

3.00

0.00

0.00

12

6.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

27

27

79

32.00

6.00

35.00

3.00

12

6.00

0.00

6.00

0.00

0.00

3.00

0.00

3.00

0.00

0.00

1.00

0.00

16

8.00

0.00

8.00

0.00

4.00

0.00

2.00

0.00

0.00

0.00

4.00

0.00

16

8.00

0.00

8.00

0.00

0.00

3.00

0.00

0.00

12

6.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

27

79

32.00

6.00

35.00

3.00

0.00

0.00

0.00

0.00

1.25

2.5

1.25

0.00

1.25

0.00

0.8

2.4

0.80

0.00

0.80

0.80

0
0

0.00

0.00

24

2
0

0.00

25

0.5

0.5

0.00

0.00

0.50

0.00

0.8

1.6

0.00

0.00

0.80

0.80

0.00

0.00

0.00

0.00

1.00

0.00

1.00

1.00

0.00

0.00

0.00

2.00

0.75

1.5

0.00

0.00

0.75

0.75

12

4.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

1.00

0.00

0.5

0.5

0.00

0.00

0.50

0.00

0.00

0.00

0.00

2.00

0.8

1.6

0.00

0.00

0.80

0.80

0.00

0.00

1.00

1.00

0.8

1.6

0.00

0.00

0.80

0.80

0.8

0.8

0.00

0.00

0.80

0.00

0.5

0.5

0.50

0.00

0.00

0.00

0.8

1.6

0.80

0.00

0.00

0.80

2.00

0.00

1.00

0.00

1.00

0.00

1.00

0.00

1.5

1.50

0.00

1.50

0.00

0.5

0.00

0.00

0.00

1.00

46

23.3

55.1

14.85

0.00

21.50

11.75

Rigg

Hydro
Jetter

Welder

Painter

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

8.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21.8

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

96.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18

116

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.00

4.00

0.00

0.00