You are on page 1of 3
No. Date: June 22, 2022. To From :IN/MEMO/22/05 : HSE TEAM : MAHMOUD ABDELRAHIM / DY/ HSE MANAGER & Information & Filing Oo _ Urgent OD Study & Report © Discussion Necessary Action Sub: WEEKLY TOOLBOX TALK TRAINING FROM JULY TO DECEMBER 2022 Dear. Reference to the subject above, as per QHSE policy, safety regulation, and QCS 2014 Section 11. Herewith attached is the Topic & schedule of HSE Weekly toolbox talks (TBT). S.NO WEEK PATE TOPIC REMARKS FROM [TO 1 [Week (1) July or | o7m [Heat Stress ‘According, As Per Site Requirements Training 2 [Week (2) July 09% | 14% Accident / incident | According. As Per Site Reporting Requirements Training 3 |Week (3) July 16" | 4x [Personal Protective . As Per Site Equipment irements Training 4 [Week (4) July 230 | om [Storage & Handling | According. As Per Site lof Chemicals Requirements Training 5 [Week (1) Aug a | gg [Heavy Equipment | According. As Per Site Requirements Training 6 |Week (2) Aug ove | age [Falling Objects ‘According. As Per Site Requirements Training 7 [Week (3) Aug ya | 29m [Loading Equipment | According. As Per Site Requirements Training 8 ‘Week (4) Aug ‘Walking /working —_| According. As Per Site 21" | 28" |around equipment |Requirements Training Ivehicles 9 |Week (1) Sep safety procedures | According. As Per Site ‘Aug | Sep |during demolition. |Requirements Training 29 | 01* |dismantling 10 |Week (2) Sep o3¢ | og site Conditions ‘According. As Per Site Requirements Training 11 |Week (3) Sep Compressed Gas | According. As Per Site to* 17 | cylinders (Gas Requirements Training Cutting and Welding)| Building a Legacy of Excellence INTERNAL MEMO S.No WEEK DATE TOPIC REMARKS FROM [TO { 12 |Week (4) Sep Fire Fighting, According. As Per Site 1s® | 24% [principles of Requirements Training ‘Combustion 13 [Week (5) Sep 25m | gon [Confined Space According. As Per Site Entry Requirements Training 14 |Week (1) Oct a | ogn |Workingatheight | According, As Per Site Requirements Training 15 |Week (2) Oct 7 in [Safety in Hot Work | According. As Per Site oo | a5 Sa a fe Activities Requirements Training 16 |Week (3) Oct Hole Watcher & | According. As Per Site 16” | 22" |Excavation Requirements Training 17 |Week (4) Oct 23% | 29 [Hazardous Materials | According. As Per Site spill Control Requirements Training 18 |Week (1) Nov Electrical safety- | According. As Per Site 01* | 07% |isolation by Lockout /Requirements Training land Tagout 19 |Week (2) Nov a in| Rigging & Slinging- | According, As Per Site os® | 14 : fst Cranes Requirements Training 20 [Week (3) Nov ‘Scaffolding Erection | According. As Per Site as | 21% Jand Dismantling /Requirements Training 21 [Week (4) Nov ‘Workplace Traffic | According. As Per Site a 30t |Accidents & Requirements Training Banksman 22 |Week (1) Dec Hand Tools & Power | According. As Per Site out ost | Tools &machine Requirements Training Guarding 23 |Week (2) Dec Mobile Elevating | According. As Per Site oom | agm [Working Platforms [Requirements Trai ‘&Working around Cranes [24 |Week (3) Dec Protection Against | According. As Per Site i ¢ |Accident Fall Requirements Training 17 23 Prevention & Slips, Trips, 25 |Week (4) Dec Material Handling | According. As Per Site aan | gx [Equipment & Requirements Training |General Construction Safety Building a Legacy of Excellence INTERNAL MEMO Note: The Contractor & Subcontractors should include heat /Cold stress, symptoms, a precaution in daily STARRT briefing before work commences on daily basis, and ensure compliance with COVID -19 spread mitigation prevention (Social distance) during T8T/Campaign Dy/HSE Manager Building a Legacy of Excellence

You might also like