COMMERCIAL BOULEVARD DEVELOPMENT - BP18A

DAILY HSE INSPECTION REPORT (HSE-DIR)


Project Title: Commercial Boulevard Development - BP18A2 Date: April 19, 2021
PMCM: Ellisdon Consultant: Shift: Day
Location: C1/ 12 & C1/ 13 Package: Package Package 3 Contractor: Redco Al mana
Accompanied
Inspected by: Albert Ulob REDCO HSE
by:

(Compliance to LREDC HSEMS and QCS: 2014 1=Not meet; 2=Partially met; 3=Meets; 4= Exceeds)
Expected
Sr No HSEMS Elements Rating Inspector's Observations Contractor Actions Date Closed
Close Out
23 Asbestos, lead
Photo No.: 1
Plot No.: C1/ 12
Observation: Electrical panel was observed lifted from GF to roof
top using a shallow material basket. It was also noted that the panel
Lifting Equipment, gears and was not secured during the process of lifting.
1 2 Immediate
operations
Recommendation: Redco HSEO to use a proper material basket
that can secure the size of panel.

Photo No.: 2
Plot No.: C1/ 13
Observation: An operative was found using a grinder to cut rebar
with improvised handle made of rebar. It was also observed the
overall poor condition of the grinder (using tie-wire to secure the
tightness of the disc guard)
2 Others (Power tools) 2 Immediate
Recommendation: Redco to conduct thorough inspection of all
power tools inside the Redco store. All power tools with missing
parts shall be removed and not to be issue.

Photo No.: 3
Plot No.: C1/ 13
Observation: Vertical opening such as ducts, garbage shute, etc
were observed not properly covered.
3 Unsafe act/condition 2 Immediate
Recommendation: Redco to conduct safety walk-through and
identify the openings. Coordinate with concern group to provide
suitable cover and signages.

Photo No.: 4
Plot No.: C1/ 13
Observation: Threading machine was operated by non-trained
workers.

HSE Induction/ Recommendation: Redco to strict implement the procedures to the


4 2 Immediate
Training/certifications subcontractor. Coordinate with Voltas HSEO to include the raised
issue on the toolbox talk.

Photo No.: 5
Plot No.: C1/13
Observation: repeatedly observed. On-going hotwork activity
without issuing HW permit including STARRT card.
5 PTW/ NOC/ Permits 2 Immediate
Recommendation: Redco HSEO to monitor by verifying the permit
and control measures of all hotwork activity.
.
Photo No.: 6
Plot No.: C1/13
Observation: Mobile scaffold was utilized by 2 operatives without
scaffold tag. Missing top rail also noticed.
Work at height, Ladders,
6 2 Immediate
Scaffolding
Recommendation: Redco to ensure all scaffold structure must be
inspected by competent scaffold inspector.
.

(Insert New Row Here)

Note: The issues were referred to a REDCO HSE Incharge/Lead stationed in the area and advised to coordinate with the Engineers assigned in the area to fix the issues observed immediately.

Reported by: Albert Ulob Date: 04/19/2021 Received by Contractor: Date:

Signature: Signature:

Closed by
Date: Reviewed by PMCM/Consultant Date:
Contractor:

Signature: Signature:

1 of 3
COMMERCIAL BOULEVARD DEVELOPMENT - BP18A

DAILY HSE INSPECTION PHOTO

Photo No.: 01 Plot No.: C1/ 12 Photo No.: 02 Plot No.: C1/ 13

Photo No.: 03 Plot No.: C1/ 13 Photo No.: 04 Plot No.: C1/ 13

Photo No.: 05 Plot No.: C1/ 13 Photo No.: 06 Plot No.: C1/ 13