Please Note: The inspection is undertaken over the items listed in the sections below. Every effort was made to ascertain compliance but not all
areas were applicable at the time of inspection or available due to constraints. Therefore, although comprehensive, the inspection is not a
guarantee of 100% compliance to HSE standards or regulations.
SUMMARY
Upon first entering the site, the site looked tidy and busy with no immediate housekeeping issues. The gateman just let me enter the site without
any challenge though. Walking around the site, it looked and was found to be tidy, PPE was being worn by 99% of the people working. The
scaffolding on the 400 kV GIS room was Scaftaged and appropriate. The workers were using their PPE and generally, compliance was good.
A few items need to be addressed and they are listed below. There is enough HSE staff on the site for this site to be in perfect compliance to the
Toshiba HSE Plan. Toshiba Management must support their Line Management on site in implementing the HSE Plan successfully. HSE Staff
should meet on a regular basis with Line Management to plan for good organized HSE.
CORRECTIVE ACTIONS
No Non-conformance Action Required T/Date Action By C/Date
1 Stores area housekeeping The hazardous material must be stored separately 16/08/07 Toshiba
needs attention especially for and appropriately with adequate signs and fire
the chemicals and hazardous precautions. See check sheet below for details.
materials stored in that area.
2 Security The Security man must control access to the site 07/08/07 Toshiba
and not juts let anybody on. Even Transco staff.
3 Subcontractor was allowed to Toshiba must enforce checks on mobile cranes and 14/08/07 Toshiba
bring a mobile crane on to the their equipment before being allowed on to the site,
site with every sling damaged. even for their subcontractor staff. Record to be
kept.
4 Scaffolding on the back side of All Scaffolding must conform to the Scaftag system. 07/08/07 Toshiba
the 132kV GIS building is poor.
5 Waste area is not appropriate. The Waste needs to be segregated into Hazardous 07/08/07 Toshiba
Also plenty bits of wood with Waste and Non Hazardous Waste. See photos.
nails sticking out around the Clear wood with nails. They should be removed or
site. knocked down.
6 Labour Camp facilities are poor. Toshiba should enforce their subcontractor to 30/08/07 Toshiba
provide adequate welfare facilities for their staff
7 EM evacuation procedure The site evacuation procedure must be tested at 07/08/07 Toshiba
least once every three months. This must be done
immediatelty.
This Document is the property of TRANSCO, and cannot be used nor given to outside party without prior authorization
Rev : X Page 2 of 6
TRANSCO HSE INSPECTION CHECKLIST Issue Date XX/XX/XX
FOR CONSTRUCTION SITES Approved By
HSEQ Manager
7- ELECTRICAL C NC COMMENTS
Electrical devices have been inspected and tested? √
Electrical equipment properly maintained? √
Equipment properly grounded? √
Assured equipment grounding program established? DNC
GFCI used and tested where required? √
Fuses provided? √
Electrical dangers posted? √ Signs should be erected.
Proper fire extinguisher(s) provided? √
Are terminal boxes equipped with required covers (cover used)? DNC
Are circuits labeled in terminal boxes? DNC
This Document is the property of TRANSCO, and cannot be used nor given to outside party without prior authorization
Rev : X Page 4 of 6
TRANSCO HSE INSPECTION CHECKLIST Issue Date XX/XX/XX
FOR CONSTRUCTION SITES Approved By
HSEQ Manager
This Document is the property of TRANSCO, and cannot be used nor given to outside party without prior authorization
Rev : X Page 6 of 6
TRANSCO HSE INSPECTION CHECKLIST Issue Date XX/XX/XX
FOR CONSTRUCTION SITES Approved By
HSEQ Manager
This Document is the property of TRANSCO, and cannot be used nor given to outside party without prior authorization