Thermo LLC Rev: 0

Page : 1
Risk Management
KAFD Project

Risk Assessment Form

Ref. No. C71001/MS/HVAC/08 Page 1 of 2


1. Date of assessment: 28/04/2010 2. Date for review:
3. Description of activity
FLUSHING &CHEMICAL CLEANING OF CHW PIPING AND ACCESSORIES
4. Description of possible hazard(s) 5. Hazard Effect(s)
Incompetent, Slip trip and fall ,Fatigue, Access and Cuts, Broken limbs, Blindness, Fatality.
egress, Contact with Chemicals, Injury, Electric
shock.
6. People / Groups who are at risk

All Thermo Employees, All other contractors/sub-contractors/suppliers/any other party working in the
project.

7. Description of existing workplace precautions / risk control systems (RCS)


Safety induction before entering site, Designated walkways, Issued PPE e.g. Safety hat, safety boots,
safety glasses for cutting, grinding etc, dust mask, gloves, high visibility vest, toolbox talks, pre installation
checks of materials and site, clean as you go attitude, Safety lighting, All electricity to site has circuit
breakers fitted, safe access/egress,

8. Risk rating with existing workplace


precautions and RCS (High, Medium, Improbable Remote Occasional Probable Frequent
Low)
Catastrophic
Medium Sever
HIGH
9. Risk rating without existing
workplace precautions and RCS Critical MEDIUM
(High, Medium, Low)
Marginal
High LOW
Negligible
Thermo LLC Rev: 0

Page : 2
Risk Management
KAFD Project

Ref. No. C71001/MS/HVAC/08 Page 2 of 2

10. Recommended workplace precautions / RCS


Only authorized, experienced and qualified person will carry out this activity, Method statement to be
followed. All workers who involved in this activity must be trained properly.Slippery; obstructive floors shall
not be permitted on site. Ensure operatives physical fitness for undertaking strenuous works.
Foreman/Supervisors must ensure adequacy of access and egress prior to the commencement of work.
The areas to be barricaded and warning signs displayed. Empty chemical containers should be disposed
accordance with local effluent regulations. In case of leak repair work should be done only after the
system has been depressurized. Ensure the material safety data sheets will be readily available at site
stores and working area for reference of first aid procedures. Ensure suitable fuses and overloads are
fitted.
11. Risk rating with recommended workplace precautions and RCS (High, Medium, Low)

Risk LOW

12. Further Action Needed 13. Action by 14. Target Date