CONSTRUCTION PLANNING
AND SCHEDULING
MODULE 1
Introduction
Construction Planning and Scheduling
Time
A plan is valueless if not prepared at the right
time. It must be prepared well in advance of
the operation prior to implementation
Elements of Planning
Information
The collection and analysis of data to be
used
Study of documents
Meetings with the team
Applying own knowledge and experience
Elements of Planning
Resources
A good plan will always take into account
available resources of
Labour
Material
Equipment
Money
Obstacles to Effective Planning
Time Span
Unpredictability of Events
Mental Ability
Lack of information
Obstacles to Effective Planning
Time Span
Unpredictability of Events
Mental Ability
Lack of information
Obstacles to Effective Planning
Time Span
Short term plans can be detailed and exact,
longer term plans can should be more
general with provision to build in details as
the need becomes evident.
Obstacles to Effective Planning
Unpredictability of Events
Bad weather
may cancel a concrete pour
Equipment failure
may break down at a critical time
Be prepared and be ready to take corrective
action.
Obstacles to Effective Planning
Mental Ability
Failure on the part of the planner to take into
account the factors bearing on the problem
Consider all available information.
Obstacles to Effective Planning
Lack of Information
If vital information is lacking, the success of
the planning process will be endangered
Thorough and careful collection and analysis of
data is vital and must be done before any plan is
prepared.