Professional Documents
Culture Documents
ACI Estimates 11111-REVISE
ACI Estimates 11111-REVISE
doors
2.1
0.9
1.89 2 2 2 15.12 25 0.6048 1.25
facia
5.54
5.54
4.996
4.996
8.4
8.4
46.36
CARPENTRY WORKS
44.98
PLYWOOD 16.00 pcs
CEILING JOIST 225.00 bd.ft
CEMENT PLASTER FINISH
MAIN WALL
Length height #sets # faces AREA
7.00 2.60 1.00 1.00
7.00
9.00
3.00
GROUND
Length height #sets # faces
- 0.20 1.00 1.00
-
-
3.00
-
2.00
LESS WINDOWS
Length height #sets # faces
0.70 1.177 4.00 (2.00) (6.59)
0.70 1.177 8.00 (1.00) (6.59)
LESS DOORS
Length height #sets # faces
0.90 2.10 2.00 (2.00) (7.56)
82.56
MASONRY WORKS
MAIN WALL
length height # sets AREA
5.00 0.40 1.00
5.00 0.20
3.00 2.60
3.00 (0.25)
APEX
length height # sets
3.00 1.20 1.00 3.60
ALLEY
length height # sets
3.00 0.20 1.00
1.20 0.20
1.20
5.40 0.40 -
RAMP
length height # sets
2.00 0.20 0.50
2.00
-
4.00 0.20 -
SEPTIC VAULT
length height # sets
1.00 1.50 1.00
1.00
2.40
2.40
LESS WINDOWS #
length height # sets
1.80 1.200 (2.00) (4.32)
1.20 1.200 (2.00) (2.88)
LESS DOORS #
length height # sets 0.4 28 11.2
0.90 2.10 (1.00) (1.89)
41.71
STRUCTURAL CONCRETE
FOOTING
width length depth # sets
0.80 0.80 0.25 4.00 0.64
COLUMN
width length depth # sets
0.15 0.40 1.10 4.00
(0.25)
0.20
2.60
(0.25)
COLUMN APEX
width length depth # sets
0.15 0.40 1.50 -
BEAM
width length depth # sets
0.15 5.00 0.25 1.00
5.00
3.00
3.00
SLOPING BEAM
width length depth # sets
0.10 2.77 0.20 4.00 0.22
FLOORING SLAB
width length depth # sets
5.00 3.00 0.075 1.00 1.13
1.20 3.00 0.075 -
WALL FOOTING
width length depth # sets
0.30 5.00 0.15 1.00
5.00
3.00
3.00
RAMP
width length depth # sets
1.20 2.00 0.075 -
SEPTIC VAULT
width length depth # sets
1.00 2.40 0.10 1.00
1.00 2.40 0.08 1.00
4.12
REINFORCING STEEL BARS
1.100917 1.090909 1.071429
FOOTING 16mm 12mm 10mm TIE WIRE
Length #pcs # sets kg/m
F-1 0.90 10.00 4.00 0.888 31.97 5.60
COLUMN
Length #pcs # sets kg/m
C-1 0.20
1.10 1.6
0.20 6 6
2.60 8 4.4
0.05
4.15 76.8 1.6
4.15 6.00 4.00 0.888 88.44 237.60 121.1904 1.578 0
TIES 1.1
Length #pcs # sets kg/m 6 #VALUE!
0.80 15.00 4.00 1 1.1
0.30 18.00 20
LINTEL BEAM
Length #pcs # sets kg/m
5.40 4.00 1.00
5.40
3.40
3.40
SEPTIC VAULT
WALL FOOTING
Length #pcs # sets kg/m
5.00 2.00 1.00
5.00
3.00
3.00
TIES
0.30 16.00
(1.60)
DOWELS
Perimeter Spacing # pcs Length kg/m
VERTICALS 5.00 0.60 8.00 0.20
5.00 0.60 8.00 0.40
3.00 0.60 4.00 0.20
3.00 0.60 4.00 2.60
DOWELS
Perimeter Spacing # pcs Length kg/m
HORIZONTALS 0.40 0.60 5.00
0.20 5.00
2.60 3.00
(0.25) 3.00
#VALUE!
6.666667
6.666667
6.666667
BACKFILL
area main
inside
Length Width Depth # Sets Volume
5.00 3.00 0.125 1.00 1.88
5.00 1.20 0.125 1.00 -
cr
2.00 1.80 0.10 2.00 -
1.88
ramp
1.8 0.5
1.8
1.5
5.1 0.5 2.55
gross 2.55
window #
wid hgt
0.7 1.177 10 8.239
doors
2.1 0.9 2 3.78
2.1 0.6 1 1.26
13.279
net -10.729
septic
wid hght
1 1.5
1
2.4
2.4
6.8
6.8 1.5 10.2
-0.529
Excav
Footing
width length depth # Volume
0.80 0.80 1.10 4.00 2.82
Wall footing
width length depth
0.30 5.00 0.60
5.00
3.00
3.00
(3.20)
septc tnk
width depth height
1.00 2.40 1.40
5.12
BACK-UP COMPUTATION
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
Q = ALL Q = ALL
Q = ALL Q = ALL
PREPARED BY:
PERT / CPM
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#VALUE!
404 Reinforcing Steel Bars #VALUE! kgs. #VALUE! #VALUE!
#VALUE! #VALUE! 75
405 Structural Concrete #VALUE! cu.m. #VALUE! #VALUE!
#REF!
1010 Doors & Windows All LS 34,886.30 #REF!
#REF!
Spl.1 Masonry Works 8,218.97 sq.m. 7,825,762.88 #REF!
#REF! #REF! 50
Spl.2 Plastering Works 16,392.34 sq.m. 5,750,860.21 #REF!
#VALUE!
Spl.3 Roofing Works #VALUE! #REF! #VALUE! #VALUE!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! 25
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
file:///conversion/tmp/activity_task_scratch/621624254.xls
BREAKDOWN OF ESTIMATE EXPENDITURE TOTAL AMOUNT
(%) (PESOS)
ESTIMATE COST:
a) DIRECT COST -
1. Mobilization / Demobilization
2. Materials 0.00% -
2.1 Supply/ Delivery
2.2 Testing of Materials
3. Labor ( Including fringe benefit) 0.00% -
4. Equipment Expenses 0.00% -
5. Well Development
CONTINGENCIES/ RESERVES
100.00% 31,413,228.79
This is to certify that the Preliminary Engineering has been conducted for the
Completion of Multi-Purpose Building (Brgy. Hall) , located at at Brgy. Tarectec
San Carlos City, Pangasinan
This certification was initiated to conform with the implementing rules and
regulations of R.A. 9184.
Noted:
MARIETA B. MENDOZA
OIC- District Engineer
DETAILED ESTIMATES
Item No. 803(b)
Structure Excavation (sand) QUANTITY 100.00 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 1.2926 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 56.86
PREPARED BY: 12% of total DC OCM 6.82
10% of total DC CP 5.69
12% of (total DC+OCM+CP) VAT 8.32
Total Direct & Indirect Unit Cost 77.69
Total Direct & Indirect Cost 7,769.30
DETAILED ESTIMATES
Item No. 803(c)
Structure Excavation (clay) QUANTITY 100.00 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 2.5940 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 70.84
PREPARED BY: 12% of total DC OCM 8.50
10% of total DC CP 7.08
12% of (total DC+OCM+CP) VAT 10.37
Total Direct & Indirect Unit Cost 96.79
Total Direct & Indirect Cost 9,678.98
DETAILED ESTIMATES
Item No. 803(d)
Structure Excavation (rock) QUANTITY 1.00 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 0.3225 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 113.93
PREPARED BY: 12% of total DC OCM 13.67
10% of total DC CP 11.39
12% of (total DC+OCM+CP) VAT 16.68
Total Direct & Indirect Unit Cost 155.67
Total Direct & Indirect Cost 155.67
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name : CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-
STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
MATERIALS COST
LABOR COST
EQUIPMENT RENTALS
Description Rentals
Plate Compactor ……………………… 600.00
Bar Cutter (manually operated) ……………………… 350.00
Concrete Mixer (1-Bagger) ……………………… 1,390.00
Concrete Vibrator ……………………… 510.00
Welding machine ……………………… 500.00
Electric Drill ……………………… 100.00
Riveter ……………………… 100.00
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT
BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
Pay Item no. Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
Structure Excavation
803(a) cu.m. 2,280.48
(common earth)
In figures: In figures:
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT
Contract Location: BOLINGIT
MALASIQUINHS,
ANDSAN
SANCARLOS
CARLOSCITY,
CITY,PANGASINAN
PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
fourteen thousand six hundred fifty & 80/100 one hundred thirty seven thousand seven hundred
900 (a.5)
Reinforce Concrete for
cu.m 803.65
pesos seventeen & 49/100 pesos
Suspended Slab
In figures: In figures:
Php 7,568.37 Php 6,082,320.78
In words: Pesos In words: Pesos
Reinforcing Steel for seventy nine & 80/100 pesos thirty one thousand fifty two & 00/100 pesos
404 (a.6) S.Vault, Stairs & kgs. 29,944.17
Sunbreaker In figures: In figures:
Php 60.86 Php 1,822,497.79
In words: Pesos In words: Pesos
eight thousand nine hundred eighty seven & forty three thousand two hundred twenty seven &
00 /100 pesos 48/100 pesos
Reinforce Concrete for S.
900 (a.6) cu.m 232.13
Vault, Stairs & Sunbreaker
In figures: In figures:
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT
BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
Contract Name:
(Columns (1), (2), (3) and (4) are to be filled up by the
Procuring Entity) (Column (5) and (6) to be filled up by the Bidder)
In words: Pesos In words: Pesos
one hundred seventy & 94/100 pesos
sixty five thousand six hundred forty one & 73/100
pesos
1027 Cement Plaster Finish sq.m 16,392.34
In figures: In figures:
six hundred sixty five & 57/100 pesos ninety thousand two hundred ninety one & 31/100 pesos
1013 Roofing Works sq.m 1,653.00
In figures: In figures:
Php #REF! Php #REF!
In words: Pesos In words: Pesos
two thousand two hundred forty nine & fifty eight thousand ninety three& 50/100 pesos
94/100 pesos
1009 Jalousie Windows sq.m 836.23
In figures: In figures:
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT
BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
sixty four & 42/100 pesos forty nine thousand four hundred sixty & 80/100 pesos
1032 a-1 Masonry Painting sq.m 32,784.68
In figures: In figures:
Php 34.67 Php 1,136,614.24
In words: Pesos In words: Pesos
thirty nine thousand two hundred twenty one thirty nine thousand two hundred twenty one & 37 /100
1100 Electrical Works LS All
& 37 /100 pesos pesos
In figures: In figures:
Php 0.00 Php 0.00
In words: Pesos In words: Pesos
seventy three & 24/100 pesos six thousand two hundred sixty one & 63/100 pesos
Damproofing / Moisture
Spl 1 sq.m 1,445.00
Control
In figures: In figures:
Php 55.01 Php 79,482.67
In words: Pesos In words: Pesos
one thousand one hundred four & 33/100 thirty four thousand seven hundred eighty six & 41/100
pesos pesos
Spl 2 Railings L.M 884.64
In figures: In figures:
TWO MILLION ONE HUNDRED SIXTY FIVE THOUSAND NINETY NINE & 40/100 pesos.
Php #REF!
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
BAR CHART/S-CURVE
Item No. Description Unit Amount % 1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
803(a) Structure Excavation (common earth) cu.m. 685,767.15 #REF! 100
404 (a.1) Reinforcing Steel for Column Footing & FTB kgs 3,342,782.48 #REF!
900 (a.1) Reinforce Concrete Column Footing & FTB cu.m. 1,586,079.32 #REF!
404 (a.4) Reinforcing Steel for Slab on Fill kgs 143,125.81 #REF!
900 (a.4) Reinforce Concrete for Slab on Fill cu.m. 569,927.56 #REF!
404 (a.5) Reinforcing Steel for Suspended Slab kgs 4,872,012.39 #REF!
900 (a.5) Reinforce Concrete for Suspended Slab cu.m. 6,082,320.78 #REF!
404 (a.6) Reinforcing Steel for S.Vault, Stairs & Sunbreaker kgs 1,822,497.79 #REF!
900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker cu.m. 945,140.16 #REF!
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS (DPWH)
NAME OF PROJECT : CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM
CONTRACTOR BERSONS CONSTRUCTION & TRADING
CONTRACT AMOUNT : P2,183,000.00
CONTRACT TIME : 180 CD
804(d-1)
804(b) 3 CD
804(a) 2 CD
3 CD
803(a) 404(a-1) 404(a-2)
MOVE IN
11 CD 9 CD 900(a-1) 19 CD
3 CD 506(1)
27 CD
804 (b) Spreading, Tamping & Grading cu.m. 1,379.95 #REF! #REF!
804 (d-1) Gravel Fill (hand placed) cu.m. 76,119.89 #REF! #REF!
404 (a.1) Reinforcing Steel for Column Footing & FTB kgs 3,342,782.48 #REF! #REF!
900 (a.1) Reinforce Concrete Column Footing & FTB cu.m. 1,586,079.32 #REF! #REF!
404 (a.2) Reinforcing Steel for Column kgs 3,173,787.15 #REF! #REF! #REF!
404 (a.4) Reinforcing Steel for Slab on Fill kgs 143,125.81 #REF!
900 (a.4) Reinforce Concrete for Slab on Fill cu.m. 569,927.56 #REF!
404 (a.5) Reinforcing Steel for Suspended Slab kgs 4,872,012.39 #REF!
900 (a.5) Reinforce Concrete for Suspended Slab cu.m. 6,082,320.78 #REF!
404 (a.6) Reinforcing Steel for S.Vault, Stairs & Sunbreaker kgs 1,822,497.79 #REF!
900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker cu.m. 945,140.16 #REF!
404(a-5)
SPL 1 404(a-4) 900(a-4) 3 CD 1100
1 CD 2 CD 9 CD 23 CD
900(a-5)
900(a-2) 404(a-3) 900(a-3) 3 CD 1027 403(a)
12 CD 14 CD 12 CD 19 CD 34 CD 1
06(1) 404(a-6) 1002 1018 SPL 2 1
7 CD 4 CD 6 CD 6 CD
900(a-6) 4 CD 8
2 CD SPL 3 & SPL 4
180 CD
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#RE
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
CASH FLOW
CASH FLOW
75%
75%
50%
#REF! #REF!
#REF!
#REF!
#REF!
25%
#REF!
#REF!
#REF! #REF!
0%
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
APPROVED:
MARIETA B. MENDOZA
OIC, District Engineer
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY,
PANGASINAN
CASH FLOW
CALENDAR DAYS 1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
% Accomp. 22.12% 24.63% 28.34% 24.91%
Commulative % Accomp. 22.12% 46.75% 75.09% 100.00%
Cash #REF! #REF! #REF! #REF!
Commulative Cash #REF! #REF! #REF! #REF!
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT
BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
DURATION
EQUIPMENT
1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
Bar Cutter (manually operated) 2 2 2
Plate compactor 1 1
Concrete Mixer (1-Bagger) 1 1 1
Concrete Vibrator 1 1 1
Welding machine 2 2
Electric Drill 1 2
Riveter 2
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name:
CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT
BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
DURATION
EQUIPMENT
1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
Construction Foreman 1 1 1 1
Skilled Laborer 4 10 10 6
Unskilled Laborer 20 15 15 10
Part time Safety Practitioner 1 1 1 1
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Procuring Entity : DPWH Pangasinan 2nd Sub-District Enginering Office, Sta. Barbara, Pangasinan
CONSTRUCTION METHOD
1.0 INTRODUCTION
Mobilization upon receipt of Notice to Proceed. Installation of Project Billboard and other signages, Excavation & Backfilling,
Fabrication/Installation of RSB, Form works & Pouring of Concrete mix, Masonry & Plastering works, Painting Works,
Roofing works (trusses & roofing sheets),Carpentry & Joinery works, Doors & Windows, Ceramic tiles, Painting works,
Plumbing & Electrical works, Provision of Occupational safety & Health & Demobilization.
Progress Bar Chart with S-Curve of Activities in the contract works (please see attached S-Curve
and Bar Chart)
Cash Flow Schedule, provision for the working capital schedule of receipts, etc. (please see attached
cash flow in the financial aspect)
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name : CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES
AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
MATERIALS COST
LABOR COST
EQUIPMENT RENTALS
Description Rentals
Plate Compactor …………………………… 600.00
Bar Cutter (manually operated) …………………………… 350.00
Concrete Mixer (1-Bagger) …………………………… 1,390.00
Concrete Vibrator …………………………… 510.00
Welding machine …………………………… 500.00
Electric Drill …………………………… 100.00
Riveter …………………………… 100.00
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL
RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL
Contract Location: MALASIQUI AND SANNHS,
RM SB AT BOLINGIT CARLOS
SANCITY, PANGASINAN
CARLOS CITY, PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
Reinforcing Steel for seventy nine & 80/100 pesos thirty one thousand fifty two & 00/100 pesos
404 (a.6) S.Vault, Stairs & kgs. 29,944.17
Sunbreaker In figures: In figures:
Php 58.80 Php 1,760,747.14
In words: Pesos In words: Pesos
eight thousand nine hundred eighty forty three thousand two hundred twenty seven
Reinforce Concrete for seven & 00 /100 pesos & 48/100 pesos
900 (a.6) S. Vault, Stairs & cu.m 232.13
Sunbreaker In figures: In figures:
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL
RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
Contract Name:
(Columns (1), (2), (3) and (4) are to be filled up
(Column (5) and (6) to be filled up by the Bidder)
by the Procuring Entity)
In words: Pesos In words: Pesos
one hundred seventy & 94/100 pesos sixty five thousand six hundred forty one &
73/100 pesos
1027 Cement Plaster Finish sq.m 16,392.34
In figures: In figures:
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL
RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
BILL OF QUANTITIES
Part No. Part Description:
TWO MILLION ONE HUNDRED SIXTY FIVE THOUSAND NINETY NINE & 40/100 pesos.
Php #REF!
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT
LIBAS ES AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
DETAILED ESTIMATES
A PROPOSED FIVE-STOREY BUILDING OF PRINCETON INTEGRATED SCHOOL: "AN INNOVATIVE GREEN ENGINEERING
DESIGN"
B. LABOR
DESCIPRTION NO. DAYS RATE TOTAL
Unskilled Laborer 20 115.00 280.00 644,000.00
Sub-total 644,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Gravel fill 145.00 cu.m. 300.00 43,500.00
Sub-total 43,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 2 36.00 280.00 20,160.00
Sub-total 20,160.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Plate compactor 1 18.00 600.00 10,800.00
Sub-total 10,800.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 52,964.57 kgs. 50.00 2,648,228.50
Tie wire (#16 G.I.) 794.00 kgs. 55.00 43,670.00
Sub-total 2,691,898.50
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 4 158.00 400.00 252,800.00
Unskilled Laborer 4 158.00 280.00 176,960.00
Sub-total 429,760.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 158.00 350.00 55,300.00
Sub-total 55,300.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 4,819.00 bags 215.00 1,036,085.00
Washed sand 267.70 cu. m. 500.00 133,850.00
Crushed Gravel 536.00 cu. m. 600.00 321,600.00
Sub-total 1,491,535.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 11.00 540.00 5,940.00
Skilled Laborer (carpentry/mason) 2 11.00 400.00 8,800.00
Unskilled Laborer 5 11.00 280.00 15,400.00
Sub-total 30,140.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 11.00 1,390.00 15,290.00
Minor tools 3,014.00
Sub-total 18,304.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 51,148.25 kgs. 50.00 2,557,412.50
Tie wire (#16 G.I.) 767.00 kgs. 55.00 42,185.00
Sub-total 2,599,597.50
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 187.00 400.00 149,600.00
Unskilled Laborer 2 187.00 280.00 104,720.00
Sub-total 254,320.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 187.00 350.00 65,450.00
Sub-total 65,450.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 5,133.00 bags 215.00 1,103,595.00
Washed sand 285.20 cu. m. 500.00 142,600.00
Crushed Gravel 571.00 cu. m. 600.00 342,600.00
Plywood, 1/4"x4'x8' 1,899.00 pcs. 300.00 569,700.00
Assorted CWN 855.00 kgs. 70.00 59,850.00
Coco Lumber 28,512.00 bd.ft 28.00 798,336.00
Sub-total 3,016,681.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 328.00 540.00 177,120.00
Skilled Laborer (carpenter/mason) 4 328.00 400.00 524,800.00
Unskilled Laborer 6 328.00 280.00 551,040.00
Sub-total 1,252,960.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 328.00 1,390.00 455,920.00
Sub-total 455,920.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 189,416.67 kgs. 50.00 9,470,833.50
Tie wire (#16 G.I.) 2,841.00 kgs. 55.00 156,255.00
Sub-total 9,627,088.50
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 576.00 400.00 460,800.00
Unskilled Laborer 2 576.00 280.00 322,560.00
Sub-total 783,360.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 576.00 350.00 201,600.00
Sub-total 201,600.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 7,394.00 bags 215.00 1,589,710.00
Washed sand 410.80 cu. m. 500.00 205,400.00
Crushed Gravel 822.00 cu. m. 600.00 493,200.00
Plywood, 1/4"x4'x8' 2,736.00 pcs. 300.00 820,800.00
Assorted CWN 1,233.00 kgs. 70.00 86,310.00
Coco Lumber 41,073.00 bd.ft 28.00 1,150,044.00
Sub-total 4,345,464.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 229.00 540.00 123,660.00
Skilled Laborer (carpenter/mason) 4 229.00 400.00 366,400.00
Unskilled Laborer 8 229.00 280.00 512,960.00
Sub-total 1,003,020.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 229.00 1,390.00 318,310.00
Sub-total 318,310.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 2,302.79 kgs. 50.00 115,139.50
Tie wire (#16 G.I.) 35.00 kgs. 55.00 1,925.00
Sub-total 117,064.50
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 9.00 400.00 7,200.00
Unskilled Laborer 2 9.00 280.00 5,040.00
Sub-total 12,240.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 9.00 350.00 3,150.00
Sub-total 3,150.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 1,301.00 bags 215.00 279,715.00
Washed sand 72.30 cu. m. 500.00 36,150.00
Crushed Gravel 145.00 cu. m. 600.00 87,000.00
Sub-total 402,865.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 6.00 540.00 3,240.00
Skilled Laborer (carpenter/mason) 4 6.00 400.00 9,600.00
Unskilled Laborer 8 6.00 280.00 13,440.00
Sub-total 26,280.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 6.00 1,390.00 8,340.00
Sub-total 8,340.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 82,171.12 kgs. 50.00 4,108,556.00
Tie wire (#16 G.I.) 1,233.00 kgs. 55.00 67,815.00
Sub-total 4,176,371.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 300.00 400.00 240,000.00
Unskilled Laborer 2 300.00 280.00 168,000.00
Sub-total 408,000.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 300.00 350.00 105,000.00
Sub-total 105,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 7,233.00 bags 215.00 1,555,095.00
Washed sand 401.90 cu. m. 500.00 200,950.00
Crushed Gravel 804.00 cu. m. 600.00 482,400.00
Plywood, 1/4"x4'x8' 2,677.00 pcs. 300.00 803,100.00
Assorted CWN 1,206.00 kgs. 70.00 84,420.00
Coco Lumber 104,475.00 bd.ft 28.00 2,925,300.00
Sub-total 6,051,265.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 3.00 540.00 1,620.00
Skilled Laborer (carpenter/mason) 10 3.00 400.00 12,000.00
Unskilled Laborer 20 3.00 280.00 16,800.00
Sub-total 30,420.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 3.00 1,390.00 4,170.00
Sub-total 4,170.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 29,944.17 kgs. 50.00 1,497,208.50
Tie wire (#16 G.I.) 449.00 kgs. 55.00 24,695.00
Sub-total 1,521,903.50
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 137.00 400.00 109,600.00
Unskilled Laborer 2 137.00 280.00 76,720.00
Sub-total 186,320.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 137.00 350.00 47,950.00
Sub-total 47,950.00
Item 900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker
QTY. = 232.13 cu.m
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 2,090.00 bags 215.00 449,350.00
Washed sand 116.10 cu. m. 500.00 58,050.00
Crushed Gravel 233.00 cu. m. 600.00 139,800.00
Plywood, 1/4"x4'x8' 20.00 pcs. 300.00 6,000.00
Assorted CWN 349.00 kgs. 70.00 24,430.00
Coco Lumber 9,285.00 bd.ft 28.00 259,980.00
Sub-total 937,610.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 540.00 1,080.00
Skilled Laborer (carpenter/mason) 2 2.00 400.00 1,600.00
Unskilled Laborer 8 2.00 280.00 4,480.00
Sub-total 7,160.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 2.00 1,390.00 2,780.00
Sub-total 2,780.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
CHB 6" x 8" x 16" 102,738.00 pcs 12.00 1,232,856.00
Portland Cement 8,367.00 bags 215.00 1,798,905.00
Washed Sand 694.00 cu.m 500.00 347,000.00
RSB 10mm dia. 22,103.00 kgs 50.00 1,105,150.00
#16 G.I. Tie Wire 332.00 kgs 55.00 18,260.00
Sub-total 4,502,171.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 6 322.00 400.00 772,800.00
Unskilled Laborer 6 322.00 280.00 540,960.00
Sub-total 1,313,760.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 3,541.00 bags 215.00 761,315.00
Washed Sand 197.00 cu.m 500.00 98,500.00
Concrete mouldings 12.24 sq.m 400.00 4,896.00
Sub-total 864,711.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 6 247.00 400.00 592,800.00
Unskilled Laborer 6 247.00 280.00 414,960.00
Sub-total 1,007,760.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 4,055.00 pcs. 300.00 1,216,500.00
Ceiling joists (Nailers/Hangers) 50,075.00 bd. Ft. 75.00 3,755,625.00
Assorted CWN 1,169.00 kgs. 70.00 81,830.00
Ceiling ventillation w/ screen #REF! set 400.00 #REF!
Blackboard 12.00 set 3,000.00 36,000.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Carpenter) 3 185.00 400.00 222,000.00
Unskilled Laborer 3 185.00 280.00 155,400.00
Sub-total 377,400.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Welder) 4 15.00 400.00 24,000.00
Unskilled Laborer 4 15.00 280.00 16,800.00
Sub-total 40,800.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Welding machine 2 15.00 500.00 15,000.00
Minor tools (10% of Labor) 4,080.00
Sub-total 19,080.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Corrugated Roofing, Gauge 26 1,653.00 sq.m 280.00 462,840.00
Pre-painted ready made Ridge Roll (0.40mm) #REF! L.m 200.00 #REF!
Pre-painted ready made Gutter (0.40mm) 3.33 L.m 200.00 665.00
Pre-painted ready made wall Flashing (0.40mm) 1,653.00 L.m 200.00 330,600.00
Blind Rivets #REF! boxes 250.00 #REF!
Tekscrew #REF! pcs. 2.00 #REF!
Silicone Selant #REF! pcs. 180.00 #REF!
25mm x 250mm x 12' Fiber Cement Fascia Board #REF! pcs. 650.00 #REF!
Misc. materials (Basket strainer, GI strap, etc.,) #REF! Lot 500.00 #REF!
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Tinsmithman) 4 17.00 400.00 27,200.00
Unskilled Laborer 4 17.00 280.00 19,040.00
Sub-total 46,240.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 2 17.00 100.00 3,400.00
Riveter 2 17.00 100.00 3,400.00
Sub-total 6,800.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Jalousie Window w/ clear glass blades on std
aluminum casing and 50x150mm thk yakal jamb 836.23 sq.m 1,550.00 1,296,156.50
w/ complete accessories
Sub-total 1,296,156.50
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 3 52.00 400.00 62,400.00
Unskilled Laborer 3 52.00 280.00 43,680.00
Sub-total 106,080.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Tanguile Panel Door on 50x150mm thk yakal 426.72 sq.m 3,750.00 1,600,200.00
jamb w/ complete accessories
Sub-total 1,600,200.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 2 76.00 400.00 60,800.00
Unskilled Laborer 2 76.00 280.00 42,560.00
Sub-total 103,360.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
PVC pipe 3" dia. 2.00 pcs. 430.00 860.00
PVC pipe 3" dia. Elbow 1/4bend 67.00 pcs. 40.00 2,680.00
Solvent 10.00 qrt 190.00 1,900.00
Sub-total 5,440.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Plumber) 1 19.00 400.00 7,600.00
Unskilled Laborer 1 19.00 280.00 5,320.00
Sub-total 12,920.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Paint Latex Gloss (Boysen) 656.00 gal 450.00 295,200.00
Paint Latex Semi-Gloss (Boysen) 656.00 gal 450.00 295,200.00
Concrete Neutralizer 110.00 gal 380.00 41,800.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 5,000.00 5,000.00
Sub-total 637,200.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 4 178.00 400.00 284,800.00
Unskilled Laborer 4 178.00 280.00 199,360.00
Sub-total 484,160.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Flat Wall Enamel (Boysen) 296.00 gal 500.00 148,000.00
Quick Dry Enamel (Boysen) 296.00 gal 500.00 148,000.00
Glazing Putty 50.00 gal 400.00 20,000.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 5,000.00 5,000.00
Sub-total 321,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 4 99.00 400.00 158,400.00
Unskilled Laborer 4 99.00 280.00 110,880.00
Sub-total 269,280.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Flourescent
Ceiling fan Lighting Fixtures (40 watts) with 72.00 set 1,000.00 72,000.00
box type housing 21.00 set 600.00 12,600.00
Light Switch 1 way 2 gang 12.00 pcs. 142.00 1,704.00
Light Switch 1 way 1 gang 119.00 pcs. 142.00 16,898.00
Utility Box (Deep tape) 3.00 pcs. 30.00 90.00
PVC Coupling PNS 14, 15mm dia. 160.00 pcs. 3.00 480.00
PVC Pipe PNS 14,15mm dia. 1.00 pcs. 69.00 69.00
PVC Pipe PNS 14, 20mm dia. 2.00 pcs. 120.00 240.00
PVC Adapter PNS 14,15mm dia. - pcs. 8.00 -
Entrance cap # 15mm dia. 2.00 pcs, 62.00 124.00
Junction Box (Deep tape w/ Cover) 75.00 pcs. 31.00 2,325.00
Copper Wire #3.50mm2 TW 1.00 mtrs 24.00 24.00
Enclosed
ElectricalAir circuit breaker, 220V, 2P, 20AT,
Tape 8.00 pcs. 40.00 320.00
Equipment
50 AF for Fire alarm, Vibrating Bell, 10" 17.00 set 1,350.00 22,950.00
dia. 5.00 set 1,300.00 6,500.00
Sub-total 138,944.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 15.00 400.00 6,000.00
Unskilled Laborer 2 15.00 280.00 8,400.00
Sub-total 14,400.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Polythelene sheets 1,445.00 sq.m 50.00 72,250.00
Sub-total 72,250.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 3 7.00 280.00 5,880.00
Sub-total 5,880.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Steel railings, 19mm sq. bar welded to 50mmØ GI 26.60 sq.m 725.00 19,285.00
Steel railings, 50mmØ GI Pipe handrail w/ 25m 27.06 LM 250.00 6,765.00
Misc. materials (welding rod, paint, etc.,) 1.00 lot 500.00 500.00
Sub-total 26,550.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (welder) 2 21.00 400.00 16,800.00
Unskilled Laborer 2 21.00 280.00 11,760.00
Sub-total 28,560.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Welding machine 1 21.00 500.00 10,500.00
Minor tools (10% of Labor) 2,856.00
Sub-total 13,356.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Safety Gears All LS 8,000.00 8,000.00
Signages, Barricades & Medicines All LS 2,000.00 2,000.00
Sub-total 10,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Part time Safety Practitioner 1.00 336.00 540.00 181,440.00
Sub-total 181,440.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Warning Signs 1 lot 2,000.00 2,000.00
Sub-total 2,000.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Tarpaulin 32.00 sq.ft 30.00 960.00
Coco lumber 30.00 bd.ft 28.00 840.00
Assorted CWN 2.00 sq.ft 70.00 140.00
Sub-total 1,940.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 1.00 1.00 400.00 400.00
Unskilled Laborer 1.00 1.00 280.00 280.00
Sub-total 680.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
TWO MILLION ONE HUNDRED SIXTY FIVE THOUSAND NINETY NINE & 40/100 pesos.
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
BAR CHART/S-CURVE
Item No. Description Unit Amount % 1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
404 (a.1) Reinforcing Steel for Column Footing & FTB kgs 3,234,014.31 #REF!
900 (a.1) Reinforce Concrete Column Footing & FTB cu.m. 1,608,965.12 #REF!
404 (a.4) Reinforcing Steel for Slab on Fill kgs 138,805.95 #REF!
900 (a.4) Reinforce Concrete for Slab on Fill cu.m. 575,765.25 #REF!
404 (a.5) Reinforcing Steel for Suspended Slab kgs 4,703,147.56 #REF!
900 (a.5) Reinforce Concrete for Suspended Slab cu.m. 6,118,144.07 #REF!
404 (a.6) Reinforcing Steel for S.Vault, Stairs & Sunbreaker kgs 1,760,747.14 #REF!
900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker cu.m. 955,396.33 #REF!
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS,
SAN CARLOS CITY, PANGASINAN
CASH FLOW
CALENDAR DAYS 1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
% Accomp. 22.12% 24.63% 28.34% 24.91%
Commulative % Accomp. 22.12% 46.75% 75.09% 100.00%
Cash #REF! #REF! #REF! #REF!
Commulative Cash #REF! #REF! #REF! #REF!
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL
RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
DURATION
EQUIPMENT
1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
Bar Cutter (manually operated) 2 2 2
Plate compactor 1 1
Concrete Mixer (1-Bagger) 1 1 1
Concrete Vibrator 1 1 1
Welding machine 2 2
Electric Drill 1 2
Riveter 2
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL
RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
DURATION
EQUIPMENT
1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
Construction Foreman 1 1 1 1
Skilled Laborer 4 10 10 6
Unskilled Laborer 20 15 15 10
Part time Safety Practitioner 1 1 1 1
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Procuring Entity : DPWH Pangasinan 2nd Sub-District Enginering Office, Sta. Barbara, Pangasinan
CONSTRUCTION METHOD
1.0 INTRODUCTION
Item No.Description
803(a) Structure Excavation (common earth)
804 (a) Embankment (Backfilling)
804 (d-1) Gravel Fill (hand placed)
404 (a.1) Reinforcing Steel for Column Footing & FTB
900 (a.1) Reinforce Concrete Column Footing & FTB
404 (a.2) Reinforcing Steel for Column
900 (a.2) Reinforce Concrete for Column
404 (a.3) Reinforcing Steel for Beam
900 (a.3) Reinforce Concrete for Beam
404 (a.4) Reinforcing Steel for Slab on Fill
900 (a.4) Reinforce Concrete for Slab on Fill
404 (a.5) Reinforcing Steel for Suspended Slab
900 (a.5) Reinforce Concrete for Suspended Slab
404 (a.6) Reinforcing Steel for S.Vault, Stairs & Sunbreaker
900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker
506(1) Masonry Works (CHB)
1027 Cement Plaster Finish
1003 Carpentry & Joinery Works
403 (a) Steel Trusses
1013 Roofing Works
1009 Jalousie Windows
1010 Doors
1002 Plumbing Works
1032 a-1 Masonry Painting
1032 a-2 Wooden Painting
1100 Electrical Works
Spl 1 Damproofing / Moisture Control
Spl 2 Railings
Spl.3 Occupational Safety & Health
Spl.4 Project Billboard
Mobilization upon receipt of Notice to Proceed. Installation of Project Billboard and other signages,
Excavation & Backfilling, Fabrication/Installation of RSB, Form works & Pouring of Concrete mix, Masonry &
Plastering works, Painting Works, Roofing works (trusses & roofing sheets),Carpentry & Joinery works, Doors
& Windows, Ceramic tiles, Painting works, Plumbing & Electrical works, Provision of Occupational safety &
Health & Demobilization.
Progress Bar Chart with S-Curve of Activities in the contract works (please see
attached S-Curve and Bar Chart)
Cash Flow Schedule, provision for the working capital schedule of receipts, etc.
(please see attached cash flow in the financial aspect)
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES
AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
DETAILED ESTIMATES
A PROPOSED FIVE-STOREY BUILDING OF PRINCETON INTEGRATED SCHOOL: "AN INNOVATIVE GREEN ENGINEERING
DESIGN"
B. LABOR
DESCIPRTION NO. DAYS RATE TOTAL
Unskilled Laborer 20 115.00 290.00 667,000.00
Sub-total 667,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Gravel fill 145.00 cu.m. 300.00 43,500.00
Sub-total 43,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 2 36.00 290.00 20,880.00
Sub-total 20,880.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Plate compactor 1 18.00 600.00 10,800.00
Sub-total 10,800.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 52,964.57 kgs. 52.00 2,754,157.64
Tie wire (#16 G.I.) 794.00 kgs. 55.00 43,670.00
Sub-total 2,797,827.64
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 4 158.00 400.00 252,800.00
Unskilled Laborer 4 158.00 290.00 183,280.00
Sub-total 436,080.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 158.00 350.00 55,300.00
Sub-total 55,300.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 4,819.00 bags 210.00 1,011,990.00
Washed sand 267.70 cu. m. 500.00 133,850.00
Crushed Gravel 536.00 cu. m. 600.00 321,600.00
Sub-total 1,467,440.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 11.00 530.00 5,830.00
Skilled Laborer (carpentry/mason) 2 11.00 400.00 8,800.00
Unskilled Laborer 5 11.00 290.00 15,950.00
Sub-total 30,580.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 11.00 1,390.00 15,290.00
Minor tools 3,058.00
Sub-total 18,348.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 51,148.25 kgs. 52.00 2,659,709.00
Tie wire (#16 G.I.) 767.00 kgs. 55.00 42,185.00
Sub-total 2,701,894.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 187.00 400.00 149,600.00
Unskilled Laborer 2 187.00 290.00 108,460.00
Sub-total 258,060.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 187.00 350.00 65,450.00
Sub-total 65,450.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 5,133.00 bags 210.00 1,077,930.00
Washed sand 285.20 cu. m. 500.00 142,600.00
Crushed Gravel 571.00 cu. m. 600.00 342,600.00
Plywood, 1/4"x4'x8' 1,899.00 pcs. 300.00 569,700.00
Assorted CWN 855.00 kgs. 70.00 59,850.00
Coco Lumber 28,512.00 bd.ft 28.00 798,336.00
Sub-total 2,991,016.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 328.00 530.00 173,840.00
Skilled Laborer (carpenter/mason) 4 328.00 400.00 524,800.00
Unskilled Laborer 6 328.00 290.00 570,720.00
Sub-total 1,269,360.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 328.00 1,390.00 455,920.00
Sub-total 455,920.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 189,416.67 kgs. 52.00 9,849,666.84
Tie wire (#16 G.I.) 2,841.00 kgs. 55.00 156,255.00
Sub-total 10,005,921.84
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 576.00 400.00 460,800.00
Unskilled Laborer 2 576.00 290.00 334,080.00
Sub-total 794,880.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 576.00 350.00 201,600.00
Sub-total 201,600.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 7,394.00 bags 210.00 1,552,740.00
Washed sand 410.80 cu. m. 500.00 205,400.00
Crushed Gravel 822.00 cu. m. 600.00 493,200.00
Plywood, 1/4"x4'x8' 2,736.00 pcs. 300.00 820,800.00
Assorted CWN 1,233.00 kgs. 70.00 86,310.00
Coco Lumber 41,073.00 bd.ft 28.00 1,150,044.00
Sub-total 4,308,494.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 229.00 530.00 121,370.00
Skilled Laborer (carpenter/mason) 4 229.00 400.00 366,400.00
Unskilled Laborer 8 229.00 290.00 531,280.00
Sub-total 1,019,050.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 229.00 1,390.00 318,310.00
Sub-total 318,310.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 2,302.79 kgs. 52.00 119,745.08
Tie wire (#16 G.I.) 35.00 kgs. 55.00 1,925.00
Sub-total 121,670.08
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 9.00 400.00 7,200.00
Unskilled Laborer 2 9.00 290.00 5,220.00
Sub-total 12,420.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 9.00 350.00 3,150.00
Sub-total 3,150.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 1,301.00 bags 210.00 273,210.00
Washed sand 72.30 cu. m. 500.00 36,150.00
Crushed Gravel 145.00 cu. m. 600.00 87,000.00
Sub-total 396,360.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 6.00 530.00 3,180.00
Skilled Laborer (carpenter/mason) 4 6.00 400.00 9,600.00
Unskilled Laborer 8 6.00 290.00 13,920.00
Sub-total 26,700.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 6.00 1,390.00 8,340.00
Sub-total 8,340.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 82,171.12 kgs. 52.00 4,272,898.24
Tie wire (#16 G.I.) 1,233.00 kgs. 55.00 67,815.00
Sub-total 4,340,713.24
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 300.00 400.00 240,000.00
Unskilled Laborer 2 300.00 290.00 174,000.00
Sub-total 414,000.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 300.00 350.00 105,000.00
Sub-total 105,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 7,233.00 bags 210.00 1,518,930.00
Washed sand 401.90 cu. m. 500.00 200,950.00
Crushed Gravel 804.00 cu. m. 600.00 482,400.00
Plywood, 1/4"x4'x8' 2,677.00 pcs. 300.00 803,100.00
Assorted CWN 1,206.00 kgs. 70.00 84,420.00
Coco Lumber 104,475.00 bd.ft 28.00 2,925,300.00
Sub-total 6,015,100.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 3.00 530.00 1,590.00
Skilled Laborer (carpenter/mason) 10 3.00 400.00 12,000.00
Unskilled Laborer 20 3.00 290.00 17,400.00
Sub-total 30,990.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 3.00 1,390.00 4,170.00
Sub-total 4,170.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 29,944.17 kgs. 52.00 1,557,096.84
Tie wire (#16 G.I.) 449.00 kgs. 55.00 24,695.00
Sub-total 1,581,791.84
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 137.00 400.00 109,600.00
Unskilled Laborer 2 137.00 290.00 79,460.00
Sub-total 189,060.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 137.00 350.00 47,950.00
Sub-total 47,950.00
Item 900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker
QTY. = 232.13 cu.m
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 2,090.00 bags 210.00 438,900.00
Washed sand 116.10 cu. m. 500.00 58,050.00
Crushed Gravel 233.00 cu. m. 600.00 139,800.00
Plywood, 1/4"x4'x8' 20.00 pcs. 300.00 6,000.00
Assorted CWN 349.00 kgs. 70.00 24,430.00
Coco Lumber 9,285.00 bd.ft 28.00 259,980.00
Sub-total 927,160.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 530.00 1,060.00
Skilled Laborer (carpenter/mason) 2 2.00 400.00 1,600.00
Unskilled Laborer 8 2.00 290.00 4,640.00
Sub-total 7,300.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 2.00 1,390.00 2,780.00
Sub-total 2,780.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
CHB 6" x 8" x 16" 102,738.00 pcs 12.00 1,232,856.00
Portland Cement 8,367.00 bags 210.00 1,757,070.00
Washed Sand 694.00 cu.m 500.00 347,000.00
RSB 10mm dia. 22,103.00 kgs 52.00 1,149,356.00
#16 G.I. Tie Wire 332.00 kgs 55.00 18,260.00
Sub-total 4,504,542.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 6 322.00 400.00 772,800.00
Unskilled Laborer 6 322.00 290.00 560,280.00
Sub-total 1,333,080.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 3,541.00 bags 210.00 743,610.00
Washed Sand 197.00 cu.m 500.00 98,500.00
Concrete mouldings 12.24 sq.m 400.00 4,896.00
Sub-total 847,006.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 6 247.00 400.00 592,800.00
Unskilled Laborer 6 247.00 290.00 429,780.00
Sub-total 1,022,580.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 4,055.00 pcs. 300.00 1,216,500.00
Ceiling joists (Nailers/Hangers) 50,075.00 bd. Ft. 75.00 3,755,625.00
Assorted CWN 1,169.00 kgs. 70.00 81,830.00
Ceiling ventillation w/ screen #REF! set 400.00 #REF!
Blackboard 12.00 set 3,000.00 36,000.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Carpenter) 3 185.00 400.00 222,000.00
Unskilled Laborer 3 185.00 290.00 160,950.00
Sub-total 382,950.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Welder) 4 15.00 400.00 24,000.00
Unskilled Laborer 4 15.00 290.00 17,400.00
Sub-total 41,400.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Welding machine 2 15.00 500.00 15,000.00
Minor tools (10% of Labor) 4,140.00
Sub-total 19,140.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Corrugated Roofing, Gauge 26 1,653.00 sq.m 280.00 462,840.00
Pre-painted ready made Ridge Roll (0.40mm) #REF! L.m 200.00 #REF!
Pre-painted ready made Gutter (0.40mm) 3.33 L.m 200.00 665.00
Pre-painted ready made wall Flashing (0.40mm) 1,653.00 L.m 200.00 330,600.00
Blind Rivets #REF! boxes 250.00 #REF!
Tekscrew #REF! pcs. 2.00 #REF!
Silicone Selant #REF! pcs. 180.00 #REF!
25mm x 250mm x 12' Fiber Cement Fascia Board #REF! pcs. 650.00 #REF!
Misc. materials (Basket strainer, GI strap, etc.,) #REF! Lot 500.00 #REF!
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Tinsmithman) 4 17.00 400.00 27,200.00
Unskilled Laborer 4 17.00 290.00 19,720.00
Sub-total 46,920.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 2 17.00 100.00 3,400.00
Riveter 2 17.00 100.00 3,400.00
Sub-total 6,800.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Jalousie Window w/ clear glass blades on std
aluminum casing and 50x150mm thk yakal jamb w/ 836.23 sq.m 1,550.00 1,296,156.50
complete accessories
Sub-total 1,296,156.50
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 3 52.00 400.00 62,400.00
Unskilled Laborer 3 52.00 290.00 45,240.00
Sub-total 107,640.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Tanguile Panel Door on 50x150mm thk yakal jamb w/
complete accessories 426.72 sq.m 3,750.00 1,600,200.00
Sub-total 1,600,200.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 2 76.00 400.00 60,800.00
Unskilled Laborer 2 76.00 290.00 44,080.00
Sub-total 104,880.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
PVC pipe 3" dia. 2.00 pcs. 430.00 860.00
PVC pipe 3" dia. Elbow 1/4bend 67.00 pcs. 40.00 2,680.00
Solvent 10.00 qrt 190.00 1,900.00
Sub-total 5,440.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Plumber) 1 19.00 400.00 7,600.00
Unskilled Laborer 1 19.00 290.00 5,510.00
Sub-total 13,110.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Paint Latex Gloss (Boysen) 656.00 gal 450.00 295,200.00
Paint Latex Semi-Gloss (Boysen) 656.00 gal 450.00 295,200.00
Concrete Neutralizer 110.00 gal 380.00 41,800.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 5,000.00 5,000.00
Sub-total 637,200.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 4 178.00 400.00 284,800.00
Unskilled Laborer 4 178.00 290.00 206,480.00
Sub-total 491,280.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Flat Wall Enamel (Boysen) 296.00 gal 500.00 148,000.00
Quick Dry Enamel (Boysen) 296.00 gal 500.00 148,000.00
Glazing Putty 50.00 gal 400.00 20,000.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 5,000.00 5,000.00
Sub-total 321,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 4 99.00 400.00 158,400.00
Unskilled Laborer 4 99.00 290.00 114,840.00
Sub-total 273,240.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Ceiling fan Lighting Fixtures (40 watts) with box type
Flourescent 72.00 set 1,000.00 72,000.00
housing 21.00 set 600.00 12,600.00
Light Switch 1 way 2 gang 12.00 pcs. 142.00 1,704.00
Light Switch 1 way 1 gang 119.00 pcs. 142.00 16,898.00
Utility Box (Deep tape) 3.00 pcs. 30.00 90.00
PVC Coupling PNS 14, 15mm dia. 160.00 pcs. 3.00 480.00
PVC Pipe PNS 14,15mm dia. 1.00 pcs. 69.00 69.00
PVC Pipe PNS 14, 20mm dia. 2.00 pcs. 120.00 240.00
PVC Adapter PNS 14,15mm dia. - pcs. 8.00 -
Entrance cap # 15mm dia. 2.00 pcs, 62.00 124.00
Junction Box (Deep tape w/ Cover) 75.00 pcs. 31.00 2,325.00
Copper Wire #3.50mm2 TW 1.00 mtrs 24.00 24.00
Electrical Tape 8.00 pcs. 40.00 320.00
Enclosed Air circuit breaker, 220V, 2P, 20AT, 50 AF 17.00 set 1,350.00 22,950.00
Equipment for Fire alarm, Vibrating Bell, 10" dia. 5.00 set 1,300.00 6,500.00
Sub-total 138,944.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 15.00 400.00 6,000.00
Unskilled Laborer 2 15.00 290.00 8,700.00
Sub-total 14,700.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Polythelene sheets 1,445.00 sq.m 50.00 72,250.00
Sub-total 72,250.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 3 7.00 290.00 6,090.00
Sub-total 6,090.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Steel railings, 19mm sq. bar welded to 50mmØ GI Pipe 26.60 sq.m 725.00 19,285.00
Steel railings, 50mmØ GI Pipe handrail w/ 25mm sq. 27.06 LM 250.00 6,765.00
Misc. materials (welding rod, paint, etc.,) 1.00 lot 500.00 500.00
Sub-total 26,550.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (welder) 2 21.00 400.00 16,800.00
Unskilled Laborer 2 21.00 290.00 12,180.00
Sub-total 28,980.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Welding machine 1 21.00 500.00 10,500.00
Minor tools (10% of Labor) 2,898.00
Sub-total 13,398.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Safety Gears All LS 5,000.00 5,000.00
Signages, Barricades & Medicines All LS 2,000.00 2,000.00
Sub-total 7,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Part time Safety Practitioner 1.00 336.00 530.00 178,080.00
Sub-total 178,080.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Warning Signs 1 lot 2,000.00 2,000.00
Sub-total 2,000.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Tarpaulin 32.00 sq.ft 30.00 960.00
Coco lumber 30.00 bd.ft 28.00 840.00
Assorted CWN 2.00 sq.ft 70.00 140.00
Sub-total 1,940.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 1.00 1.00 400.00 400.00
Unskilled Laborer 1.00 1.00 290.00 290.00
Sub-total 690.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
TWO MILLION ONE HUNDRED SIXTY FIVE THOUSAND NINETY NINE & 40/100 pesos.
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES
AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
DETAILED ESTIMATES
CONSTRUCTION OF 1-STOREY, 1 CL.RM. PRE-SCHOOL BUILDING WITH COMFORT RM. LIBAS ES, SAN CARLOS CITY,
PANGASINAN
B. LABOR
DESCIPRTION NO. DAYS RATE TOTAL
Unskilled Laborer 4 4.00 290.00 4,640.00
Sub-total 4,640.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
River mix (plus 10% loose volume) 10.00 cu.m. 300.00 3,000.00
Sub-total 3,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 2 1.00 290.00 580.00
Sub-total 580.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total -
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 2 0.50 290.00 290.00
Sub-total 290.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 176.34 kgs. 52.00 9,169.68
Tie wire (#16 G.I.) 3.00 kgs. 55.00 165.00
Sub-total 9,334.68
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 1.00 400.00 800.00
Sub-total 800.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 0.25 350.00 87.50
Sub-total 87.50
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 40.00 bags 210.00 8,400.00
Washed sand 2.20 cu. m. 500.00 1,100.00
Crushed Gravel 5.00 cu. m. 600.00 3,000.00
Sub-total 12,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 1.00 530.00 530.00
Skilled Laborer (carpentry/mason) 2 1.00 400.00 800.00
Unskilled Laborer 4 1.00 290.00 1,160.00
Sub-total 2,490.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 1.00 1,390.00 1,390.00
Sub-total 1,390.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 515.28 kgs. 52.00 26,794.56
Tie wire (#16 G.I.) 8.00 kgs. 55.00 440.00
Sub-total 27,234.56
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 1 2.00 400.00 800.00
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 1,960.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 1.00 350.00 350.00
Sub-total 350.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 19.00 bags 210.00 3,990.00
Washed sand 1.10 cu. m. 500.00 550.00
Crushed Gravel 3.00 cu. m. 600.00 1,800.00
Plywood, 1/4"x4'x8' 7.00 pcs. 300.00 2,100.00
Assorted CWN 3.00 kgs. 70.00 210.00
Coco Lumber 106.00 bd.ft 28.00 2,968.00
Sub-total 11,618.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 530.00 1,060.00
Skilled Laborer (carpenter/mason) 2 2.00 400.00 1,600.00
Unskilled Laborer 4 2.00 290.00 2,320.00
Sub-total 4,980.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 0.50 1,390.00 695.00
Sub-total 695.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 465.39 kgs. 52.00 24,200.28
Tie wire (#16 G.I.) 7.00 kgs. 55.00 385.00
Sub-total 24,585.28
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 1 2.00 400.00 800.00
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 1,960.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 0.50 350.00 175.00
Sub-total 175.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 22.00 bags 210.00 4,620.00
Washed sand 1.20 cu. m. 500.00 600.00
Crushed Gravel 3.00 cu. m. 600.00 1,800.00
Plywood, 1/4"x4'x8' 8.00 pcs. 300.00 2,400.00
Assorted CWN 4.00 kgs. 70.00 280.00
Coco Lumber 119.00 bd.ft 28.00 3,332.00
Sub-total 13,032.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 530.00 1,060.00
Skilled Laborer (carpenter/mason) 2 2.00 400.00 1,600.00
Unskilled Laborer 4 2.00 290.00 2,320.00
Sub-total 4,980.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 0.50 1,390.00 695.00
Sub-total 695.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 263.59 kgs. 52.00 13,706.68
Tie wire (#16 G.I.) 4.00 kgs. 55.00 220.00
Sub-total 13,926.68
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 1.00 400.00 800.00
Sub-total 800.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 67.00 bags 210.00 14,070.00
Washed sand 3.70 cu. m. 500.00 1,850.00
Crushed Gravel 8.00 cu. m. 600.00 4,800.00
Sub-total 20,720.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 7.00 530.00 3,710.00
Skilled Laborer (carpenter/mason) 2 7.00 400.00 5,600.00
Unskilled Laborer 4 7.00 290.00 8,120.00
Sub-total 17,430.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 4.00 1,390.00 5,560.00
Sub-total 5,560.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
CHB 6" x 8" x 16" 1,468.00 pcs 12.00 17,616.00
Portland Cement 120.00 bags 210.00 25,200.00
Washed Sand 10.00 cu.m 500.00 5,000.00
RSB 10mm dia. 316.00 kgs 52.00 16,432.00
#16 G.I. Tie Wire 5.00 kgs 55.00 275.00
Sub-total 64,523.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 6 9.00 400.00 21,600.00
Unskilled Laborer 6 9.00 290.00 15,660.00
Sub-total 37,260.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 43.00 bags 210.00 9,030.00
Washed Sand 3.00 cu.m 500.00 1,500.00
Concrete mouldings 12.24 sq.m 400.00 4,896.00
Sub-total 15,426.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 2 7.00 400.00 5,600.00
Unskilled Laborer 3 7.00 290.00 6,090.00
Sub-total 11,690.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 36.00 pcs. 300.00 10,800.00
Ceiling joists (Nailers/Hangers) 434.00 bd. Ft. 75.00 32,550.00
Assorted CWN 11.00 kgs. 70.00 770.00
Ceiling ventillation w/ screen 4.00 set 400.00 1,600.00
Sub-total 45,720.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Carpenter) 3 6.00 400.00 7,200.00
Unskilled Laborer 3 6.00 290.00 5,220.00
Sub-total 12,420.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
Sub-total 71,693.52
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Welder) 2 10.00 400.00 8,000.00
Unskilled Laborer 2 10.00 290.00 5,800.00
Sub-total 13,800.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Welding machine 1 10.00 500.00 5,000.00
Minor tools (10% of Labor) 1,380.00
Sub-total 6,380.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Pre-painted Corrugated Sheets (0.40mm) 103.10 sq.m 420.00 43,302.00
Pre-painted ready made Ridge Roll (0.40mm) 8.40 L.m 200.00 1,680.00
Pre-painted ready made wall Flashing (0.40mm) 19.80 L.m 200.00 3,960.00
Blind Rivets 2.00 boxes 250.00 500.00
Tekscrew 450.00 pcs. 2.00 900.00
25mm x 250mm x 12' Fiber Cement Fascia Board 12.00 pcs. 650.00 7,800.00
Misc. materials (Basket strainer, GI strap, etc.,) #REF! Lot 500.00 #REF!
Downspout 3" dia. PVC Pipe (orange) 8.00 pcs. 430.00 3,440.00
PVC Elbow 3" dia. (orange) 8.00 pcs. 40.00 320.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Tinsmithman) 2 4.00 400.00 3,200.00
Unskilled Laborer 3 4.00 290.00 3,480.00
Sub-total 6,680.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 2 4.00 100.00 800.00
Riveter 2 4.00 100.00 800.00
Sub-total 1,600.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total 11,493.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 1 2.00 400.00 800.00
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 1,960.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Panel Type door w/ complete accessories
2.00 set 1,750.00 3,500.00
Sub-total 3,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 1 2.00 400.00 800.00
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 1,960.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
2" X 4" Window Jamb (Tanguile)Fabricated with
accessories 3.00 set 2,200.00 6,600.00
Sub-total 6,600.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 2 2.00 400.00 1,600.00
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 2,760.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Water Closets 1.00 pc. 4,500.00 4,500.00
PVC pipe 4" dia. 3.00 pcs. 583.00 1,749.00
PVC pipe 4 x 2 wye 2.00 pc. 95.00 190.00
PVC pipe 4 x 4 wye 1.00 pc. 113.00 113.00
PVC pipe 4 x 2 Tee 1.00 pc. 100.00 100.00
PVC pipe 4" dia. Elbow 1/4 bend 2.00 pc. 71.00
PVC pipe 4" dia. Elbow 1/8 bend 2.00 pc. 54.00 108.00
PVC pipe 2" dia. P-Trap 2.00 pc. 73.00 146.00
PVC pipe 4" dia. Cleanout w/ plug 2.00 pcs. 55.00 110.00
Solvent 2.00 can 190.00 380.00
Floor drain 4" x 4" H.D. 1.00 pc. 200.00 200.00
G I pipe 1/2" dia 2.00 pcs. 365.00 730.00
G I coupling 1/2" dia. 4.00 pcs. 8.00 32.00
G I elbow 1/2" dia. 4.00 pcs. 10.00 40.00
G I tee 1/2" dia 2.00 pcs. 15.00 30.00
G I adapter 1/2" dia 2.00 pcs. 15.00 30.00
Faucet 1/2" dia 1.00 pcs. 120.00 120.00
Miscellaneous (Teflon & etc.,) All LS 1,500.00 1,500.00
Sub-total 10,078.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Plumber) 1 19.00 400.00 7,600.00
Unskilled Laborer 2 19.00 290.00 11,020.00
Sub-total 18,620.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Ceramic Unglazed Tiles (20cm x 20cm) 8.66 sq.m 600.00 5,196.00
Portland Cement 5.00 bag 210.00 1,050.00
Tile adhesive 5.00 bag 240.00 1,200.00
Sub-total 7,446.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (mason) 1 6.00 400.00 2,400.00
Unkilled Laborer 2 6.00 290.00 3,480.00
Sub-total 5,880.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Paint Latex Gloss (Boysen) 11.00 gal 450.00 4,950.00
Paint Latex Semi-Gloss (Boysen) 11.00 gal 450.00 4,950.00
Concrete Neutralizer 2.00 gal 380.00 760.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 5,000.00 5,000.00
Sub-total 15,660.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 2 6.00 400.00 4,800.00
Unskilled Laborer 2 6.00 290.00 3,480.00
Sub-total 8,280.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Flat Wall Enamel (Boysen) 5.00 gal 500.00 2,500.00
Quick Dry Enamel (Boysen) 5.00 gal 500.00 2,500.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 2,000.00 2,000.00
Sub-total 7,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 1 3.00 400.00 1,200.00
Unskilled Laborer 2 3.00 290.00 1,740.00
Sub-total 2,940.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
PVC Pipe 15mm x 3.0 meters 20.00 pcs. 69.00 1,380.00
RCS Pipe 20mm x 3.0 mtrs. 2.00 kgs 516.00 1,032.00
Utility Box Deep Type 4.00 pcs 30.00 120.00
Junction Box Deep Type 6.00 pcs 30.00 180.00
Square Box Deep Type 2.00 pcs 37.00 74.00
Locknut and Bushing 20mm, 2.00 pcs 9.00 18.00
Service Entrance Cap 1.00 pcs 65.00 65.00
Sub-total 3,289.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 2.00 400.00 800.00
Unskilled Laborer 1 2.00 290.00 580.00
Sub-total 1,380.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Electric Wire 3.5mm2 THW 3.00 mtrs. 24.00 72.00
Electric Wire 5.5mm2 THW 50.00 mtrs. 37.00 1,850.00
Duplex Convenience Outlet 4.00 pcs. 126.00 504.00
Three (3) Gang Tumbler Switch 2.00 pcs. 170.00 340.00
Electric Tape 2.00 pc. 40.00 80.00
Sub-total 2,846.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 1.00 400.00 400.00
Unskilled Laborer 1 1.00 290.00 290.00
Sub-total 690.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
40 Watts CFL 10.00 sets 150.00 1,500.00
Ceiling Fan 2.00 sets 1,000.00 2,000.00
Sub-total 3,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 0.50 400.00 200.00
Unskilled Laborer 1 0.50 290.00 145.00
Sub-total 345.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Panel Board LP 40AT, 50AF, 220V ,3-20 AT, 50AF, 2P 1.00 set 1,500.00 1,500.00
Sub-total 1,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1.00 1.00 400.00 400.00
Sub-total 400.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Warning Signs 8 300.00 2,400.00
Sub-total 2,400.00
CONSTRUCTION OF 1-STOREY, 1 CL.RM. PRE-SCHOOL BUILDING WITH COMFORT RM. LIBAS ES, SAN CARLOS
CITY, PANGASINAN
Item No. Description Amount
803(a) Structure Excavation (common earth) 5,804.80
804 (a) Embankment (Backfilling) 4,397.16
804 (b) Spreading, Tamping & Grading 482.94
404 (a.1) Reinforcing Steel for Column Footing & WF 10,873.12
900 (a.1) Reinforce Concrete Column Footing & FTB 17,414.88
404 (a.2) Reinforcing Steel for Column 31,906.14
900 (a.2) Reinforce Concrete for Column 22,745.74
404 (a.3) Reinforcing Steel for Beam 28,835.56
900 (a.3) Reinforce Concrete for Beam 24,201.17
404e Reinforcing Steel for Slab on Fill 16,337.31
900e Reinforce Concrete Slab on Fill 49,664.59
506(1) Masonry Works (CHB) 144,106.69
1027 Cement Plaster Finish 31,133.17
1003 Carpentry & Joinery Works 72,654.46
403 (a) Steel Trusses 104,328.89
1013 Roofing Works #REF!
1010(2b) Jalousie Window 16,152.90
1010(b) Doors 7,148.81
1010 (a) Door Frames & Accessories 14,564.94
1012 Plumbing Works 33,907.40
1018 Ceramics Tiles 16,313.53
1032a-1 Masonry Painting 27,042.00
1032a-2 Wooden Painting 14,075.70
1100 Conduit Boxes & Fittings 6,275.94
1101 Wires & Wiring Devices 4,887.50
1102a Lighting Fixtures 4,961.70
1102 Panel Boards & Cabinets 2,117.42
SPL1 Signages & Barricades 3,185.51
Eight Hundred Six Thousand Six Hundred Eighty Pesos and Forty Three Cents
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM
DETAILED ESTIMATES
Construction of 1 Storey 2 CL.Rm. School Building,Olea NHS, Malasiqui, Pangasinan
B. LABOR
DESCIPRTION NO. DAYS RATE TOTAL
Unskilled Laborer 6 3.00 290.00 5,220.00
Sub-total 5,220.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
River mix (plus 10% loose volume) 19.00 cu.m. 300.00 5,700.00
Sub-total 5,700.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 1,160.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total -
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Unskilled Laborer 3 0.80 290.00 696.00
Sub-total 696.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 352.36 kgs. 52.00 18,322.72
Tie wire (#16 G.I.) 5.00 kgs. 55.00 275.00
Sub-total 18,597.72
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 2.00 400.00 1,600.00
Sub-total 1,600.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 0.50 350.00 175.00
Sub-total 175.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 86.00 bags 210.00 18,060.00
Washed sand 4.80 cu. m. 500.00 2,400.00
Crushed Gravel 10.00 cu. m. 600.00 6,000.00
Sub-total 26,460.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 11.00 530.00 5,830.00
Skilled Laborer (carpentry/mason) 2 11.00 400.00 8,800.00
Unskilled Laborer 4 11.00 290.00 12,760.00
Sub-total 27,390.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 11.00 1,390.00 15,290.00
Sub-total 15,290.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 762.05 kgs. 52.00 39,626.60
Tie wire (#16 G.I.) 11.00 kgs. 55.00 605.00
Sub-total 40,231.60
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 3.00 400.00 2,400.00
Unskilled Laborer 2 3.00 290.00 1,740.00
Sub-total 4,140.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 1.00 350.00 350.00
Sub-total 350.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 31.00 bags 210.00 6,510.00
Washed sand 1.70 cu. m. 500.00 850.00
Crushed Gravel 4.00 cu. m. 600.00 2,400.00
Plywood, 1/4"x4'x8' 11.00 pcs. 300.00 3,300.00
Assorted CWN 5.00 kgs. 70.00 350.00
Coco Lumber 170.00 bd.ft 28.00 4,760.00
Sub-total 18,170.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 4.00 530.00 2,120.00
Skilled Laborer (carpenter/mason) 2 4.00 400.00 3,200.00
Unskilled Laborer 4 4.00 290.00 4,640.00
Sub-total 9,960.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 2.00 1,390.00 2,780.00
Sub-total 2,780.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 544.91 kgs. 52.00 28,335.32
Tie wire (#16 G.I.) 8.00 kgs. 55.00 440.00
Sub-total 28,775.32
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 1 3.00 400.00 1,200.00
Unskilled Laborer 2 3.00 290.00 1,740.00
Sub-total 2,940.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 1.00 350.00 350.00
Sub-total 350.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 39.00 bags 210.00 8,190.00
Washed sand 2.20 cu. m. 500.00 1,100.00
Crushed Gravel 5.00 cu. m. 600.00 3,000.00
Plywood, 1/4"x4'x8' 15.00 pcs. 300.00 4,500.00
Assorted CWN 7.00 kgs. 70.00 490.00
Coco Lumber 214.00 bd.ft 28.00 5,992.00
Sub-total 23,272.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 4.00 530.00 2,120.00
Skilled Laborer (carpenter/mason) 2 4.00 400.00 3,200.00
Unskilled Laborer 4 4.00 290.00 4,640.00
Sub-total 9,960.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 4.00 1,390.00 5,560.00
Sub-total 5,560.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Assorted RSB 459.41 kgs. 52.00 23,889.32
Tie wire (#16 G.I.) 7.00 kgs. 55.00 385.00
Sub-total 24,274.32
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (steelman) 2 9.00 400.00 7,200.00
Unskilled Laborer 2 9.00 290.00 5,220.00
Sub-total 12,420.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 9.00 350.00 3,150.00
Sub-total 3,150.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland cement, 40 kgs 114.00 bags 210.00 23,940.00
Washed sand 6.30 cu. m. 500.00 3,150.00
Crushed Gravel 13.00 cu. m. 600.00 7,800.00
Sub-total 34,890.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 10.00 530.00 5,300.00
Skilled Laborer (carpenter/mason) 2 10.00 400.00 8,000.00
Unskilled Laborer 4 10.00 290.00 11,600.00
Sub-total 24,900.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete mixer (1-bagger) 1 10.00 1,390.00 13,900.00
Sub-total 13,900.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
CHB 6" x 8" x 16" 1,839.00 pcs 12.00 22,068.00
Portland Cement 150.00 bags 210.00 31,500.00
Washed Sand 13.00 cu.m 500.00 6,500.00
RSB 10mm dia. 396.00 kgs 52.00 20,592.00
#16 G.I. Tie Wire 6.00 kgs 55.00 330.00
Sub-total 80,990.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 6 10.00 400.00 24,000.00
Unskilled Laborer 6 10.00 290.00 17,400.00
Sub-total 41,400.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 73.00 bags 210.00 15,330.00
Washed Sand 5.00 cu.m 500.00 2,500.00
Concrete mouldings 12.24 sq.m 400.00 4,896.00
Sub-total 22,726.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Mason) 6 5.00 400.00 12,000.00
Unskilled Laborer 6 5.00 290.00 8,700.00
Sub-total 20,700.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 64.00 pcs. 300.00 19,200.00
Ceiling joists (Nailers/Hangers) 790.00 bd. Ft. 75.00 59,250.00
Assorted CWN 19.00 kgs. 70.00 1,330.00
Ceiling ventillation w/ screen 4.00 set 400.00 1,600.00
Sub-total 81,380.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Carpenter) 3 5.00 400.00 6,000.00
Unskilled Laborer 3 5.00 290.00 4,350.00
Sub-total 10,350.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
Sub-total 123,551.40
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Welder) 2 13.00 400.00 10,400.00
Unskilled Laborer 2 13.00 290.00 7,540.00
Sub-total 17,940.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Welding machine 1 13.00 500.00 6,500.00
Minor tools (10% of Labor) 1,794.00
Sub-total 8,294.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Pre-painted Corrugated Sheets (0.40mm) 193.94 sq.m 420.00 81,454.80
Pre-painted ready made Ridge Roll (0.40mm) 19.80 L.m 200.00 3,960.00
Pre-painted ready made wall Flashing (0.40mm) 22.00 L.m 200.00 4,400.00
Blind Rivets 2.00 boxes 250.00 500.00
Tekscrew 700.00 pcs. 2.00 1,400.00
25mm x 250mm x 12' Fiber Cement Fascia Board 24.00 pcs. 650.00 15,600.00
Misc. materials (Basket strainer, GI strap, etc.,) #REF! Lot 500.00 #REF!
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Tinsmithman) 2 4.00 400.00 3,200.00
Unskilled Laborer 3 4.00 290.00 3,480.00
Sub-total 6,680.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 2 4.00 100.00 800.00
Riveter 2 4.00 100.00 800.00
Sub-total 1,600.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total 23,940.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 2 3.00 400.00 2,400.00
Unskilled Laborer 2 3.00 290.00 1,740.00
Sub-total 4,140.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Panel Type Doors w/ complete accessories
4.00 set 1,750.00 7,000.00
Sub-total 7,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 1 3.00 400.00 1,200.00
Unskilled Laborer 2 3.00 290.00 1,740.00
Sub-total 2,940.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
2" X 4" Window Jamb (Tanguile)Fabricated with
accessories 12.00 set 2,200.00 26,400.00
Sub-total 26,400.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer 1 1.00 400.00 400.00
Unskilled Laborer 1 1.00 290.00 290.00
Sub-total 690.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Paint Latex Gloss (Boysen) 13.00 gal 450.00 5,850.00
Paint Latex Semi-Gloss (Boysen) 13.00 gal 450.00 5,850.00
Concrete Neutralizer 1.00 gal 380.00 380.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 5,000.00 5,000.00
Sub-total 17,080.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 2 6.00 400.00 4,800.00
Unskilled Laborer 2 6.00 290.00 3,480.00
Sub-total 8,280.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Flat Wall Enamel (Boysen) 10.00 gal 500.00 5,000.00
Quick Dry Enamel (Boysen) 10.00 gal 500.00 5,000.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,) 5,000.00 5,000.00
Sub-total 15,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Painter) 2 5.00 400.00 4,000.00
Unskilled Laborer 2 5.00 290.00 2,900.00
Sub-total 6,900.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
PVC Pipe 15mm x 3.0 meters 40.00 pcs. 69.00 2,760.00
RCS Pipe 20mm x 3.0 mtrs. 3.00 kgs 516.00 1,548.00
Utility Box Deep Type 8.00 pcs 30.00 240.00
Junction Box Deep Type 12.00 pcs 30.00 360.00
Square Box Deep Type 4.00 pcs 37.00 148.00
Locknut and Bushing 20mm, 4.00 pcs 9.00 36.00
Service Entrance Cap 1.00 pcs 65.00 65.00
Misc. etc. All L.S. 1,500.00 1,500.00
Sub-total 7,497.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 4.00 400.00 1,600.00
Unskilled Laborer 1 4.00 290.00 1,160.00
Sub-total 2,760.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Electric Wire 3.5mm2 THW 3.00 mtrs. 24.00 72.00
Electric Wire 5.5mm2 THW 50.00 mtrs. 37.00 1,850.00
Duplex Convenience Outlet 4.00 pcs. 126.00 504.00
Three (3) Gang Tumbler Switch 2.00 pcs. 170.00 340.00
Electric Tape 2.00 pc. 40.00 80.00
Miscellanous etc. All L.S. 1,500.00 1,500.00
Sub-total 4,346.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 2.00 400.00 800.00
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 1,960.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
40 Watts CFL 10.00 sets 150.00 1,500.00
Ceiling Fan 2.00 sets 1,000.00 2,000.00
Sub-total 3,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1 1.00 400.00 400.00
Unskilled Laborer 1 1.00 290.00 290.00
Sub-total 690.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Panel Board LP 40AT, 50AF, 220V ,3-20 AT, 50AF, 2P 1.00 set 1,500.00 1,500.00
Sub-total 1,500.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Skilled Laborer (Electrician) 1.00 1.00 400.00 400.00
Sub-total 400.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Warning Signs 8 300.00 2,400.00
Sub-total 2,400.00
One Million Two Hundred Five Thousand Forty Six Pesos and Sixty Cents
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 13AJ0006
Contract Name: CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN
Contract Location: MALASIQUI AND SAN CARLOS CITY, PANGASINAN
BAR CHART/S-CURVE
804 (a) Embankment (Backfilling) cu.m. - 4,415.22 1.00 7,988.64 2.00 12,403.87 3.00 0.61%
804 (b) Spreading, Tamping & Grading cu.m. 484.91 0.50 900.75 0.80 1,385.66 2.00 0.07%
804 (d-1) Gravel Fill (hand placed) cu.m. - 36.00 - 36.00 0.00%
404 (a.1) Reinforcing Steel for Column Footing & FTB kgs - 158.00 10,917.39 1.00 21,839.84 2.00 32,757.23 161.00 1.62%
900 (a.1) Reinforce Concrete Column Footing & FTB cu.m. - 11.00 17,486.59 1.00 37,953.81 11.00 55,440.40 23.00 2.74%
404 (a.2) Reinforcing Steel for Column kgs - 187.00 32,035.14 2.00 47,373.30 3.00 79,408.44 192.00 3.93%
900 (a.2) Reinforce Concrete for Column cu.m. - 328.00 22,839.39 2.00 37,860.76 4.00 60,700.14 334.00 3.00%
404 (a.3) Reinforcing Steel for Beam kgs - 576.00 28,954.98 2.00 33,876.03 3.00 62,831.01 581.00 3.11%
900 (a.3) Reinforce Concrete for Beam cu.m. - 229.00 24,300.80 2.00 44,706.27 4.00 69,007.07 235.00 3.42%
404 (a.4) Reinforcing Steel for Slab on Fill kgs - 9.00 2,127.44 1.00 2,127.44 10.00 0.11%
900 (a.4) Reinforce Concrete for Slab on Fill cu.m. - 6.00 49,869.07 7.00 86,033.99 9.00 135,903.06 22.00 6.73%
404 (a.5) Reinforcing Steel for Suspended Slab kgs - 300.00 - 300.00 0.00%
900 (a.5) Reinforce Concrete for Suspended Slab cu.m. - 3.00 - 3.00 0.00%
404 (a.6) Reinforcing Steel for S.Vault, Stairs & Sunbreaker kgs - 137.00 - 137.00 0.00%
900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker cu.m. - 2.00 - 2.00 0.00%
506(1) Masonry Works (CHB) sq.m - 322.00 158,976.57 9.00 196,067.61 10.00 355,044.19 341.00 17.58%
1027 Cement Plaster Finish sq.m - 247.00 31,261.19 7.00 49,213.69 5.00 80,474.88 259.00 3.98%
1003 Carpentry & Joinery Works sq.m - 185.00 72,953.87 6.00 127,227.45 5.00 200,181.32 196.00 9.91%
403 (a) Steel Trusses kgs - 15.00 104,760.01 10.00 178,412.34 13.00 283,172.35 38.00 14.02%
1013 Roofing Works sq.m - 17.00 107,280.20 4.00 164,340.77 4.00 271,620.96 25.00 13.45%
1009 Jalousie Windows sq.m - 52.00 16,219.34 2.00 32,010.21 3.00 48,229.55 57.00 2.39%
1010 Doors sq.m - 76.00 21,803.14 4.00 43,694.45 4.00 65,497.60 84.00 3.24%
1002 Plumbing Works L.S. - 19.00 18,302.54 19.00 18,302.54 38.00 0.91%
1032 a-1 Masonry Painting sq.m - 178.00 27,153.13 6.00 34,067.24 6.00 61,220.37 190.00 3.03%
1032 a-2 Wooden Painting sq.m - 99.00 14,134.76 3.00 26,259.52 5.00 40,394.28 107.00 2.00%
1100 Electrical Works sq.m - 15.00 18,316.23 4.50 27,779.02 8.00 46,095.25 28.00 2.28%
Spl.3 Occupational Safety & Health L.M - 3,198.72 3,198.72 6,397.44 - 0.32%
Submitted By:
RUSSELL Q. BERNAL
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
PUBLIC WORKS & HIGHWAYS (DPWH)
NAME OF PROJECT : CONSTRUCTION OF 1-STOREY 2-CL RM SB AT OLEA NHS, MALASIQUI, 1-STOREY 1-CL RM SB AT LIBAS ES AND 2-STOREY 2-CL RM SB AT BOLINGIT NHS, SAN CARLOS CITY, PANGASINAN (CLUSTER
ABC : 2,020,000.00
CONTRACT TIME : 180 CD
804(d-1)
804(b) 3 CD 404(a-5)
804(a) 2 CD SPL 1 404(a-4) 900(a-4) 3 CD
3 CD 1 CD 2 CD 9 CD 900(a-
803(a) 404(a-1) 404(a-2) 900(a-2) 404(a-3) 900(a-3) 3 CD
MOVE IN
11 CD 9 CD 900(a-1) 19 CD 12 CD 14 CD 12 CD
3 CD 506(1) 404(a-6)
27 CD 4 CD
900(a-6)
2 CD
Item No. Description Unit Amount % MARCH 25 -APRIL 30, 2013 MAY 1-31, 2013 JUNE 1-
804 (b) Spreading, Tamping & Grading cu.m. 1,385.66 0.07% 0.07%
804 (d-1) Gravel Fill (hand placed) cu.m. 0.00 0.00% 0.00%
404 (a.1) Reinforcing Steel for Column Footing & FTB kgs 32,757.23 1.62% 1.62%
900 (a.1) Reinforce Concrete Column Footing & FTB cu.m. 55,440.40 2.74% 2.74%
404 (a.2) Reinforcing Steel for Column kgs 79,408.44 3.93% 2.90% 1.03%
900 (a.2) Reinforce Concrete for Column cu.m. 60,700.14 3.00% 3.00%
404 (a.3) Reinforcing Steel for Beam kgs 62,831.01 3.11% 3.11%
900 (a.3) Reinforce Concrete for Beam cu.m. 69,007.07 3.42% 3.42%
404 (a.4) Reinforcing Steel for Slab on Fill kgs 2,127.44 0.11% 0.11%
900 (a.4) Reinforce Concrete for Slab on Fill cu.m. 135,903.06 6.73% 5.23% 1.50%
404 (a.5) Reinforcing Steel for Suspended Slab kgs 0.00 0.00% 0.00%
900 (a.5) Reinforce Concrete for Suspended Slab cu.m. 0.00 0.00%
404 (a.6) Reinforcing Steel for S.Vault, Stairs & Sunbreaker kgs 0.00 0.00% 0.00%
900 (a.6) Reinforce Concrete for S. Vault, Stairs & Sunbreaker cu.m. 0.00 0.00% 0.00%
Spl.3 Occupational Safety & Health L.S. 6,397.44 0.32% 0.05% 0.0
0.07%
Spl.4 Project Billboard LS 0.00 0.00%
0.00%
CASH
404(a-5)
3 CD 1100
900(a-5) 23 CD
3 CD 1027 403(a) 1013 1003 1032 (a-1)
19 CD 34 CD 10 CD 17 CD 17 CD
MOVE OUT
1002 1018 1032 (a-2)
SPL 2 1009 1010
6 CD 6 CD 10 CD
4 CD 8 CD 11 CD
SPL 3 & SPL 4
180 CD
JUNE 1-30, 2013 JULY 1-31, 2013 AUGUST 1-31, 2013 SEPTEMBER 1-20, 2013
100%
75%
3.42%
0.00%
0.00%
50%
2.60% 1.39%
8.16% 1.75%
11.13% 2.89%
13.45%
2.39%
3.24%
0.91%
25%
0.81%
3.03%
2.00%
1.49% 0.79%
0.00%
0%
CASH FLOW
Q =3 HOLE Q =3 HOLE
181
BOTT&TOP 4.50 26.00 4.00 1.578 1.02 753.27
TOP 4.50 8.00 4.00 4.833 1.02 709.87
BOTT 5.70 14.00 4.00 4.833 1.02 1,572.17
TOP F3 5.65 15.00 8.00 4.833 1.02 3,339.94
BOTT&TOP 5.10 26.00 8.00 1.578 1.02 1,707.42
TOP 5.10 10.00 8.00 4.833 1.02 2,011.30
BOTT 5.65 15.00 8.00 4.833 1.02 3,339.94
TOP F4 6.63 12.00 4.00 4.833 1.02 1,569.05
BOTT 4.00 30.00 4.00 1.578 1.02 772.59
TOP 4.00 8.00 4.00 4.833 1.02 631.00
BOTT 6.63 12.00 4.00 4.833 1.02 1,569.05
TOP F5 6.50 12.00 20.00 4.833 1.02 7,692.64
BOTT 4.10 22.00 20.00 1.578 1.02 2,903.65
TOP 4.10 8.00 20.00 4.833 1.02 3,233.86
BOTT 6.50 12.00 20.00 4.833 1.02 7,692.64
TOP F6 3.30 17.00 16.00 2.467 1.02 2,258.67
BOTT 3.30 17.00 16.00 2.467 1.02 2,258.67
TOP F7 5.69 14.00 4.00 2.467 1.02 802.23
BOTT 4.50 26.00 4.00 2.467 1.02 1,177.65
TOP 4.50 8.00 4.00 2.467 1.02 362.35
BOTT 5.69 14.00 4.00 2.467 1.02 802.23
WF1 4.50 3.00 19.00 0.888 1.02 232.33
0.35 12.00 19.00 1.578 1.02 128.44
WF2 4.50 3.00 10.00 0.888 1.02 122.28
0.35 12.00 10.00 1.578 1.02 67.60
COLUMN
C-1 (FOUNDATION) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-1 (GROUND FLR.) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-1 (2ND FLR) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-1 (3RD FLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-1 (4TH FLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 12.00 4.00 0.616 1.02 1.00 66.35
C-1 (5TH FLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 12.00 4.00 0.616 1.02 1.00 66.35
C-2 (FOUNDATION) 3.20 8.00 4.00 2.467 1.02 1.00 257.67
TIES 1 3.60 6.00 4.00 0.616 1.02 1.00 54.29
TIES 2 3.60 10.00 4.00 0.616 1.02 1.00 90.48
C-2 (GROUND FLR. ) 3.20 8.00 4.00 2.467 1.02 1.00 257.67
TIES 1 3.60 6.00 4.00 0.616 1.02 1.00 54.29
TIES 2 3.60 10.00 4.00 0.616 1.02 1.00 90.48
C-2 (2ND FLR) 3.20 6.00 4.00 2.467 1.02 1.00 193.25
TIES 1 2.90 6.00 4.00 0.616 1.02 1.00 43.73
TIES 2 2.90 10.00 4.00 0.616 1.02 1.00 72.89
C-2 (3RD FLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-2 (4THFLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
182
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 12.00 4.00 0.616 1.02 1.00 66.35
C-2 (5TH FLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
TIES 1 2.20 6.00 4.00 0.616 1.02 1.00 33.18
TIES 2 2.20 12.00 4.00 0.616 1.02 1.00 66.35
C-3 (FOUNDATION) 3.20 8.00 16.00 2.467 1.02 1.00 1,030.69
TIES 1 3.60 6.00 16.00 0.616 1.02 1.00 217.15
TIES 2 3.60 10.00 16.00 0.616 1.02 1.00 361.91
C-3 (GROUND FLR. ) 3.20 8.00 16.00 2.467 1.02 1.00 1,030.69
TIES 1 3.60 6.00 16.00 0.616 1.02 1.00 217.15
TIES 2 3.60 10.00 16.00 0.616 1.02 1.00 361.91
C-3 (2ND FLR) 3.20 6.00 16.00 2.467 1.02 1.00 773.02
2.90 6.00 16.00 0.616 1.02 1.00 174.92
2.90 10.00 16.00 0.616 1.02 1.00 291.54
C-3 (3RD FLR) 3.20 4.00 16.00 1.578 1.02 1.00 329.64
2.20 6.00 16.00 0.616 1.02 1.00 132.70
2.20 10.00 16.00 0.616 1.02 1.00 221.17
C-3 (4TH FLR) 3.20 4.00 16.00 1.578 1.02 1.00 329.64
2.20 6.00 16.00 0.616 1.02 1.00 132.70
2.20 12.00 16.00 0.616 1.02 1.00 265.40
C-3 (5TH FLR) 3.20 4.00 16.00 1.578 1.02 1.00 329.64
2.20 6.00 16.00 0.616 1.02 1.00 132.70
2.20 12.00 16.00 0.616 1.02 1.00 265.40
C-4 (FOUNDATION) 3.20 8.00 12.00 2.467 1.02 1.00 773.02
TIES 1 3.60 6.00 12.00 0.616 1.02 1.00 162.86
TIES 2 3.60 10.00 12.00 0.616 1.02 1.00 271.43
C-4 (GROUND FLR. ) 3.20 8.00 12.00 2.467 1.02 1.00 773.02
TIES 1 3.60 6.00 12.00 0.616 1.02 1.00 162.86
TIES 2 3.60 10.00 12.00 0.616 1.02 1.00 271.43
C-4(2ND FLR) 3.20 6.00 12.00 2.467 1.02 1.00 579.76
2.90 6.00 12.00 0.616 1.02 1.00 131.19
2.90 10.00 12.00 0.616 1.02 1.00 218.66
C-4 (3RDFLR) 3.20 4.00 12.00 1.578 1.02 1.00 247.23
2.20 6.00 12.00 0.616 1.02 1.00 99.53
2.20 10.00 12.00 0.616 1.02 1.00 165.88
C-4(4TH FLR) 3.20 4.00 12.00 1.578 1.02 1.00 247.23
2.20 6.00 12.00 0.616 1.02 1.00 99.53
2.20 12.00 12.00 0.616 1.02 1.00 199.05
C-4(5TH FLR) 3.20 4.00 12.00 1.578 1.02 1.00 247.23
2.20 6.00 12.00 0.616 1.02 1.00 99.53
2.20 12.00 12.00 0.616 1.02 1.00 199.05
C-5 (FOUNDATION) 3.20 6.00 4.00 3.854 1.02 1.00 301.91
TIES 1 2.90 6.00 4.00 0.616 1.02 1.00 43.73
TIES 2 2.90 8.00 4.00 0.616 1.02 1.00 58.31
C-5 (GROUND FLR.) 3.20 6.00 4.00 3.854 1.02 1.00 301.91
TIES 1 2.90 6.00 4.00 0.616 1.02 1.00 43.73
TIES 2 2.90 8.00 4.00 0.616 1.02 1.00 58.31
C-5(2NDFLR) 3.20 6.00 4.00 3.854 1.02 1.00 301.91
2.90 6.00 4.00 0.616 1.02 1.00 43.73
2.90 8.00 4.00 0.616 1.02 1.00 58.31
C-5 (3RD FLR) 3.20 6.00 4.00 3.854 1.02 1.00 301.91
2.90 6.00 4.00 0.616 1.02 1.00 43.73
2.90 8.00 4.00 0.616 1.02 1.00 58.31
C-5 (4TH FLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 12.00 4.00 0.616 1.02 1.00 66.35
C-5 (5TH FLR) 3.20 4.00 4.00 1.578 1.02 1.00 82.41
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 12.00 4.00 0.616 1.02 1.00 66.35
C-6& C-10 (FOUNDATION) 3.20 8.00 12.00 3.854 1.02 1.00 1,207.63
TIES 1 3.60 6.00 12.00 0.616 1.02 1.00 162.86
TIES 2 3.60 8.00 12.00 0.616 1.02 1.00 217.15
C-6& C10 (GROUND FLR.) 3.20 8.00 12.00 3.854 1.02 1.00 1,207.63
TIES 1 3.60 6.00 12.00 0.616 1.02 1.00 162.86
TIES 2 3.60 8.00 12.00 0.616 1.02 1.00 217.15
C-6&C10(2NDFLR) 3.20 6.00 12.00 3.854 1.02 1.00 905.72
2.90 6.00 12.00 0.616 1.02 1.00 131.19
2.90 8.00 12.00 0.616 1.02 1.00 174.92
C-6& C10(3RD FLR) 3.20 4.00 12.00 3.854 1.02 1.00 603.81
2.20 6.00 12.00 0.616 1.02 1.00 99.53
2.20 8.00 12.00 0.616 1.02 1.00 132.70
C-6 & C10(4TH FLR) 3.20 4.00 12.00 3.854 1.02 1.00 603.81
2.20 6.00 12.00 0.616 1.02 1.00 99.53
2.20 8.00 12.00 0.616 1.02 1.00 132.70
C-6 & C10 (5TH FLR) 3.20 4.00 12.00 3.854 1.02 1.00 603.81
183
2.20 6.00 12.00 0.616 1.02 1.00 99.53
2.20 8.00 12.00 0.616 1.02 1.00 132.70
C-7 (FOUNDATION) 3.20 6.00 4.00 2.467 1.02 1.00 193.25
TIES 1 2.90 6.00 4.00 0.616 1.02 1.00 43.73
TIES 2 2.90 10.00 4.00 0.616 1.02 1.00 72.89
C-7 (GROUND FLR.) 3.20 6.00 4.00 2.467 1.02 1.00 193.25
TIES 1 2.90 6.00 4.00 0.616 1.02 1.00 43.73
TIES 2 2.90 10.00 4.00 0.616 1.02 1.00 72.89
C-7(2NDFLR) 3.20 6.00 4.00 2.467 1.02 1.00 193.25
2.90 6.00 4.00 0.616 1.02 1.00 43.73
2.90 10.00 4.00 0.616 1.02 1.00 72.89
C-7(3RD FLR) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-7(4TH FLR) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-7 (5TH FLR) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-8 (FOUNDATION) 3.20 10.00 4.00 2.467 1.02 1.00 322.09
TIES 1 4.30 6.00 4.00 0.616 1.02 1.00 64.84
TIES 2 4.30 10.00 4.00 0.616 1.02 1.00 108.07
C-8 (GROUND FLR.) 3.20 10.00 4.00 2.467 1.02 1.00 322.09
TIES 1 4.30 6.00 4.00 0.616 1.02 1.00 64.84
TIES 2 4.30 10.00 4.00 0.616 1.02 1.00 108.07
C-8(2NDFLR) 3.20 8.00 4.00 2.467 1.02 1.00 257.67
3.60 6.00 4.00 0.616 1.02 1.00 54.29
3.60 10.00 4.00 0.616 1.02 1.00 90.48
C-8(3RD FLR) 3.20 6.00 4.00 2.467 1.02 1.00 193.25
2.90 6.00 4.00 0.616 1.02 1.00 43.73
2.90 10.00 4.00 0.616 1.02 1.00 72.89
C-8(4TH FLR) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-8 (5TH FLR) 3.20 4.00 4.00 2.467 1.02 1.00 128.84
2.20 6.00 4.00 0.616 1.02 1.00 33.18
2.20 10.00 4.00 0.616 1.02 1.00 55.29
C-9 (FOUNDATION) 3.20 8.00 8.00 3.854 1.02 1.00 805.09
TIES 1 3.72 6.00 8.00 0.616 1.02 1.00 112.19
TIES 2 3.72 8.00 8.00 0.616 1.02 1.00 149.59
C-9 (GROUND FLR.) 3.20 8.00 8.00 3.854 1.02 1.00 805.09
TIES 1 3.72 6.00 8.00 0.616 1.02 1.00 112.19
TIES 2 3.72 8.00 8.00 0.616 1.02 1.00 149.59
C-9(2NDFLR) 3.20 8.00 8.00 3.854 1.02 1.00 805.09
3.72 6.00 8.00 0.616 1.02 1.00 112.19
3.72 8.00 8.00 0.616 1.02 1.00 149.59
C-9(3RD FLR) 3.20 6.00 8.00 3.854 1.02 1.00 603.81
3.00 6.00 8.00 0.616 1.02 1.00 90.48
3.00 8.00 8.00 0.616 1.02 1.00 120.64
C-9(4TH FLR) 3.20 4.00 8.00 3.854 1.02 1.00 402.54
2.28 6.00 8.00 0.616 1.02 1.00 68.76
2.28 8.00 8.00 0.616 1.02 1.00 91.68
C-9 (5TH FLR) 3.20 4.00 8.00 3.854 1.02 1.00 402.54
2.28 6.00 8.00 0.616 1.02 1.00 68.76
2.28 8.00 8.00 0.616 1.02 1.00 91.68
C-11&C-12(FOUNDATION) 3.20 8.00 16.00 3.854 1.02 2.00 3,220.34
TIES 1 3.72 6.00 16.00 0.616 1.02 2.00 448.77
TIES 2 3.72 8.00 16.00 0.616 1.02 2.00 598.36
C-11&C-12(GROUND FLR.) 3.20 8.00 16.00 3.854 1.02 2.00 3,220.34
TIES 1 3.72 6.00 16.00 0.616 1.02 2.00 448.77
TIES 2 3.72 8.00 16.00 0.616 1.02 2.00 598.36
C-11&C12(2NDFLR) 3.20 6.00 16.00 3.854 1.02 2.00 2,415.26
3.00 6.00 16.00 0.616 1.02 2.00 361.91
3.00 8.00 16.00 0.616 1.02 2.00 482.55
C-11&C12(3RD FLR) 3.20 4.00 16.00 3.854 1.02 2.00 1,610.17
2.28 6.00 16.00 0.616 1.02 2.00 275.05
2.28 8.00 16.00 0.616 1.02 2.00 366.74
C-11&C12(4TH FLR) 3.20 4.00 16.00 3.854 1.02 2.00 1,610.17
2.80 6.00 16.00 0.616 1.02 2.00 337.78
2.80 8.00 16.00 0.616 1.02 2.00 450.38
C-11&C-12 (5TH FLR) 3.20 4.00 16.00 3.854 1.02 2.00 1,610.17
2.80 6.00 16.00 0.616 1.02 2.00 337.78
2.80 8.00 16.00 0.616 1.02 2.00 450.38
DC 1.40 4.00 2.00 1.578 1.02 4.00 72.11
184
0.64 14.00 2.00 1.578 1.02 4.00 115.37
BEAM AT 2ND FLR. & 3RD FLR. SUB-TOTAL: 51,148.25
BEAM
TYP C G-1 4.50 4.00 19.00 4.833 1.02 1.00 2 3,371.89
1.98 3.00 19.00 4.833 1.02 2.00 2 2,219.83
STIRR. 1.96 27.00 19.00 0.616 1.02 1.00 2 1,263.53
TYP A G-2 4.50 4.00 19.00 4.833 1.02 1.00 2 3,371.89
1.98 1.00 19.00 4.833 1.02 2.00 2 739.94
STIRR. 1.96 27.00 19.00 0.616 1.02 1.00 2 1,263.53
TYP A G-3 4.50 4.00 10.00 4.833 1.02 1.00 2 1,774.68
1.30 1.00 10.00 4.833 1.02 2.00 2 256.34
STIRR. 1.96 22.00 10.00 0.616 1.02 1.00 2 541.86
TYP C G-4 4.50 4.00 10.00 4.833 1.02 1.00 2 1,774.68
1.30 3.00 10.00 4.833 1.02 2.00 2 769.03
STIRR. 1.96 21.00 10.00 0.616 1.02 1.00 2 517.23
G-5 4.50 4.00 10.00 4.833 1.02 1.00 2 1,774.68
1.30 3.00 10.00 4.833 1.02 2.00 2 769.03
STIRR. 1.96 21.00 10.00 0.616 1.02 1.00 2 517.23
TYP C G-6 4.50 7.00 10.00 4.833 1.02 1.00 2 3,105.69
1.30 3.00 10.00 4.833 1.02 2.00 2 769.03
STIRR. 1.96 21.00 10.00 0.616 1.02 1.00 2 517.23
TYP C G-7 4.50 7.00 10.00 4.833 1.02 1.00 2 3,105.69
1.30 3.00 10.00 4.833 1.02 2.00 2 769.03
STIRR. 1.96 21.00 10.00 0.616 1.02 1.00 2 517.23
BEAM AT 4rd flr. FLR.
BEAM
G-1 4.50 4.00 19.00 4.833 1.02 1.00 1.00 1,685.94
1.98 2.00 19.00 4.833 1.02 2.00 1.00 739.94
STIRR. 1.96 26.00 19.00 0.616 1.02 1.00 1.00 608.36
G-2 4.50 4.00 19.00 4.833 1.02 1.00 1.00 1,685.94
1.98 1.00 19.00 4.833 1.02 2.00 1.00 369.97
STIRR. 1.96 26.00 19.00 0.616 1.02 1.00 1.00 608.36
G-3 4.50 4.00 10.00 4.833 1.02 1.00 1.00 887.34
1.65 1.00 10.00 4.833 1.02 2.00 1.00 162.68
STIRR. 1.96 22.00 10.00 0.616 1.02 1.00 1.00 270.93
G-4 4.50 4.00 10.00 4.833 1.02 1.00 1.00 887.34
1.65 2.00 10.00 4.833 1.02 2.00 1.00 325.36
STIRR. 1.96 21.00 10.00 0.616 1.02 1.00 1.00 258.62
G-5 4.50 4.00 10.00 4.833 1.02 1.00 1.00 887.34
1.65 2.00 10.00 4.833 1.02 2.00 1.00 325.36
STIRR. 1.96 21.00 10.00 0.616 2.02 1.00 1.00 512.16
G-6 4.50 4.00 10.00 4.833 1.02 1.00 1.00 887.34
1.65 2.00 10.00 4.833 1.02 2.00 1.00 325.36
STIRR. 1.96 21.00 10.00 0.616 1.02 1.00 1.00 258.62
G-7 4.50 4.00 10.00 4.833 1.02 1.00 1.00 887.34
1.65 2.00 10.00 4.833 1.02 2.00 1.00 325.36
STIRR. 1.96 21.00 10.00 0.616 1.02 1.00 1.00 258.62
BEAM AT RD FLR
BEAM
G-1 4.50 4.00 19.00 2.467 1.02 1.00 1.00 860.59
185
1.91 2.00 19.00 2.467 1.02 2.00 1.00 365.27
STIRR. 1.30 36.00 19.00 0.616 1.02 1.00 1.00 558.70
G-2 4.50 4.00 19.00 3.854 1.02 1.00 1.00 1,344.43
1.60 49.00 19.00 0.616 1.02 1.00 1.00 935.95
G-3 4.50 4.00 10.00 2.467 1.02 1.00 1.00 452.94
1.91 1.00 10.00 2.467 1.02 2.00 1.00 96.12
2.50 1.00 10.00 2.467 1.02 2.00 1.00 125.82
STIRR. 1.60 22.00 10.00 0.616 1.02 1.00 1.00 221.17
G-4 4.50 4.00 10.00 2.467 1.02 1.00 1.00 452.94
1.91 1.00 10.00 2.467 1.02 2.00 1.00 96.12
2.50 1.00 10.00 2.467 1.02 2.00 1.00 125.82
STIRR. 1.60 21.00 10.00 0.616 1.02 1.00 1.00 211.12
G-5 4.50 4.00 10.00 2.467 1.02 1.00 1.00 452.94
1.91 1.00 10.00 2.467 1.02 2.00 1.00 96.12
2.50 1.00 10.00 2.467 1.02 2.00 1.00 125.82
STIRR. 1.60 21.00 10.00 0.616 1.02 1.00 1.00 211.12
G-6 4.50 4.00 10.00 2.467 1.02 1.00 1.00 452.94
1.91 1.00 10.00 2.467 1.02 2.00 1.00 96.12
2.50 1.00 10.00 2.467 1.02 2.00 1.00 62.91
STIRR. 1.60 21.00 10.00 0.616 1.02 1.00 1.00 211.12
G-7 4.50 4.00 10.00 2.467 1.02 1.00 1.00 452.94
1.91 1.00 10.00 2.467 1.02 2.00 1.00 96.12
2.50 1.00 10.00 2.467 1.02 2.00 1.00 62.91
STIRR. 1.60 21.00 10.00 0.616 1.02 1.00 1.00 211.12
BEAMS 2ND
B-1 & B-4 4.50 4.00 19.00 4.833 1.02 1.00 2.00 3,371.89
1.98 8.00 19.00 4.833 1.02 2.00 2.00 5,919.54
1.56 30.00 19.00 0.616 1.02 1.00 2.00 1,117.40
B-2 & B-3 4.50 4.00 19.00 4.833 1.02 1.00 2.00 3,371.89
1.98 6.00 19.00 4.833 1.02 2.00 2.00 4,439.65
1.56 30.00 19.00 0.616 1.02 1.00 2.00 1,117.40
B5- B9 4.50 4.00 10.00 4.833 1.02 1.00 5.00 4,436.69
1.65 4.00 10.00 4.833 1.02 2.00 5.00 3,253.58
1.56 24.00 10.00 0.616 1.02 1.00 5.00 1,176.22
B10-B11 4.50 4.00 10.00 4.833 1.02 1.00 2.00 1,774.68
1.65 1.00 10.00 4.833 1.02 2.00 2.00 325.36
1.90 2.00 10.00 4.833 1.02 1.00 2.00 374.65
1.56 22.00 10.00 0.616 1.02 1.00 2.00 431.28
BEAMS 3RD
B-1 & B-4 4.50 4.00 19.00 4.833 1.02 1.00 2.00 3,371.89
1.98 7.00 19.00 4.833 1.02 2.00 2.00 5,179.59
1.56 30.00 19.00 0.616 1.02 1.00 2.00 1,117.40
B-2 & B-3 4.50 4.00 19.00 4.833 1.02 1.00 2.00 3,371.89
1.98 4.00 19.00 4.833 1.02 2.00 2.00 2,959.77
1.56 30.00 19.00 0.616 1.02 1.00 2.00 1,117.40
B5- B9 4.50 4.00 10.00 4.833 1.02 1.00 5.00 4,436.69
1.65 3.00 10.00 4.833 1.02 2.00 5.00 2,440.18
1.56 24.00 10.00 0.616 1.02 1.00 5.00 1,176.22
B10-B11 4.50 4.00 10.00 4.833 1.02 1.00 2.00 1,774.68
1.65 1.00 10.00 4.833 1.02 2.00 2.00 325.36
1.90 2.00 10.00 4.833 1.02 1.00 2.00 374.65
1.20 22.00 10.00 0.616 1.02 1.00 2.00 331.75
BEAMS 4TH
B-1 & B-4 4.50 4.00 19.00 4.833 1.02 1.00 2.00 3,371.89
1.98 4.00 19.00 4.833 1.02 2.00 2.00 2,959.77
1.56 30.00 19.00 0.616 1.02 1.00 2.00 1,117.40
B-2 & B-3 4.50 4.00 19.00 4.833 1.02 1.00 2.00 3,371.89
1.98 3.00 19.00 4.833 1.02 2.00 2.00 2,219.83
1.56 30.00 19.00 0.616 1.02 1.00 2.00 1,117.40
B5- B9 4.50 4.00 10.00 4.833 1.02 1.00 5.00 4,436.69
1.65 3.00 10.00 4.833 1.02 2.00 5.00 2,440.18
1.56 24.00 10.00 0.616 1.02 1.00 5.00 1,176.22
B10-B11 4.50 4.00 10.00 4.833 1.02 1.00 2.00 1,774.68
1.65 1.00 10.00 4.833 1.02 2.00 2.00 325.36
1.90 2.00 10.00 4.833 1.02 1.00 2.00 374.65
1.20 22.00 10.00 0.616 1.02 1.00 2.00 331.75
BEAMS 5TH
B-1 , B-4& B-2 4.50 4.00 19.00 3.854 1.02 1.00 3.00 4,033.29
1.95 4.00 19.00 3.854 1.02 2.00 3.00 3,495.52
1.40 33.00 19.00 0.616 1.02 1.00 3.00 1,654.62
B-3 4.50 4.00 19.00 4.667 1.02 1.00 2.00 3,256.07
1.98 3.00 19.00 4.833 1.02 2.00 1.00 1,109.91
2.56 1.00 18.00 4.833 1.02 2.00 1.00 454.32
186
1.50 30.00 19.00 0.616 1.02 1.00 1.00 537.21
B5&B9 4.50 4.00 10.00 3.854 1.02 1.00 1.00 707.59
1.95 2.00 10.00 3.854 1.02 2.00 1.00 306.62
1.56 33.00 10.00 0.616 1.02 1.00 1.00 323.46
B6&B7 4.50 4.00 10.00 3.854 1.02 1.00 1.00 707.59
1.98 2.00 10.00 3.854 1.02 2.00 1.00 311.34
1.50 30.00 10.00 0.616 1.02 1.00 1.00 282.74
B8 4.50 4.00 10.00 3.854 1.02 1.00 1.00 707.59
1.60 4.00 10.00 3.854 1.02 2.00 1.00 503.18
1.30 30.00 10.00 0.616 1.02 1.00 1.00 245.04
B10-B11 4.50 4.00 10.00 4.833 1.02 1.00 2.00 1,774.68
1.65 1.00 10.00 4.833 1.02 2.00 2.00 325.36
1.90 2.00 10.00 4.833 1.02 1.00 2.00 374.65
1.20 22.00 10.00 0.616 1.02 1.00 2.00 331.75
BEAMS RD
B-1 , B-4& B-2 4.50 4.00 19.00 3.854 1.02 1.00 3.00 4,033.29
1.95 3.00 19.00 3.854 1.02 2.00 3.00 2,621.64
2.56 1.00 19.00 3.854 1.02 2.00 3.00 183.37
1.40 33.00 19.00 0.616 1.02 1.00 3.00 1,654.62
B-3 4.50 4.00 19.00 4.833 1.02 1.00 2.00 3,371.89
1.98 3.00 19.00 4.833 1.02 2.00 1.00 1,109.91
2.56 1.00 18.00 4.833 1.02 2.00 1.00 454.32
1.50 30.00 19.00 0.616 1.02 1.00 1.00 537.21
B5,B6&B7 4.50 4.00 10.00 2.467 1.02 1.00 3.00 1,358.82
1.95 2.00 10.00 2.467 1.02 2.00 3.00 588.82
1.60 1.00 10.00 2.467 1.02 1.00 3.00 120.78
1.56 33.00 10.00 0.616 1.02 1.00 3.00 970.38
B8&B9 4.50 4.00 10.00 3.854 1.02 1.00 1.00 707.59
1.98 2.00 10.00 3.854 1.02 2.00 1.00 311.34
1.50 30.00 10.00 0.616 1.02 1.00 1.00 282.74
B10-B11 4.50 4.00 10.00 4.833 1.02 1.00 2.00 1,774.68
1.65 1.00 10.00 4.833 1.02 2.00 2.00 325.36
1.90 2.00 10.00 4.833 1.02 1.00 2.00 374.65
1.20 22.00 10.00 0.616 1.02 1.00 2.00 331.75
STB 1.40 4.00 8.00 1.578 1.02 1.00 1.00 72.11
1.20 14.00 8.00 0.616 1.02 1.00 1.00 84.45
TOTAL 189,416.67
187
SUSPENDED SLAB
S1 & S2 LONG.
TOP 1.13 26.00 24.00 0.888 1.02 4.00 2,543.37
BOTT. 4.50 13.00 24.00 0.888 1.02 4.00 5,086.75
SHORT
TOP 0.88 32.00 24.00 0.888 1.02 4.00 2,434.68
BOTT. 3.50 16.00 24.00 0.888 1.02 4.00 4,869.37
S3 LONG.
TOP 1.00 32.00 4.00 0.888 1.02 4.00 463.75
BOTT. 4.00 13.00 4.00 0.888 1.02 4.00 753.59
SHORT
TOP 0.88 32.00 4.00 0.888 1.02 4.00 405.78
BOTT. 3.50 15.00 4.00 0.888 1.02 4.00 760.84
S4(2ND-4TH) LONG.
TOP 1.13 26.00 18.00 0.888 1.02 3.00 1,437.01
BOTT. 4.50 13.00 18.00 0.888 1.02 3.00 2,861.30
SHORT
TOP 0.88 32.00 18.00 0.888 1.02 3.00 1,369.51
BOTT. 3.50 16.00 18.00 0.888 1.02 3.00 2,739.02
S4 (5TH LONG.
TOP 1.13 33.00 4.00 0.888 1.02 1.00 135.10
BOTT. 4.50 13.00 4.00 0.888 1.02 1.00 211.95
SHORT
TOP 0.88 32.00 4.00 0.888 1.02 1.00 101.45
BOTT. 3.50 16.00 4.00 0.888 1.02 1.00 202.89
S5-S6 LONG.
TOP 1.13 26.00 24.00 0.888 1.02 4.00 2,554.68
BOTT. 4.50 13.00 24.00 0.888 1.02 4.00 5,086.75
SHORT
TOP 0.88 26.00 24.00 0.888 1.02 4.00 1,978.18
BOTT. 3.50 16.00 24.00 0.888 1.02 4.00 4,869.37
S7 & S8 LONG.
TOP 1.13 26.00 60.00 0.888 1.02 1.00 1,589.61
BOTT. 4.50 13.00 60.00 0.888 1.02 1.00 3,179.22
SHORT
TOP 0.88 32.00 60.00 0.888 1.02 1.00 1,521.68
BOTT. 3.50 16.00 60.00 0.888 1.02 1.00 3,043.35
S7 & S8 LONG.
TOP 1.13 78.00 36.00 0.888 1.02 1.00 2,861.30
BOTT. 4.50 13.00 36.00 0.888 1.02 1.00 1,907.53
SHORT
TOP 0.88 79.00 36.00 0.888 1.02 1.00 2,253.98
BOTT. 3.50 16.00 36.00 0.888 1.02 1.00 1,826.01
S9 3.50 6.00 2.00 0.888 1.02 4.00 152.17
1.50 40.00 2.00 0.888 1.02 4.00 434.76
S10 3.50 13.00 1.00 0.888 1.02 4.00 164.85
2.00 24.00 1.00 0.888 1.02 4.00 173.91
FOR RD
SUSPENDED SLAB
S1-S2 1.13 26.00 24.00 0.888 1.02 1.00 638.67
0.88 32.00 24.00 0.888 1.02 1.00 612.15
4.50 16.00 24.00 0.888 1.02 1.00 1,565.15
3.50 13.00 24.00 0.888 1.02 1.00 989.09
S3 1.00 40.00 4.00 0.888 1.02 1.00 144.92
0.88 69.00 4.00 0.888 1.02 1.00 219.99
4.00 21.00 4.00 0.888 1.02 1.00 304.34
3.50 32.00 4.00 0.888 1.02 1.00 405.78
S4-S6-S8 1.13 32.00 36.00 0.888 1.02 1.00 1,179.08
0.88 44.00 36.00 0.888 1.02 1.00 1,262.56
4.50 17.00 36.00 0.888 1.02 1.00 2,494.46
3.50 17.00 36.00 0.888 1.02 1.00 1,940.14
S5-S7 1.13 44.00 24.00 0.888 1.02 1.00 1,080.83
0.88 59.00 24.00 0.888 1.02 1.00 1,128.65
4.50 17.00 24.00 0.888 1.02 1.00 1,662.98
3.50 17.00 24.00 0.888 1.02 1.00 1,293.43
S9 3.50 5.00 2.00 0.888 1.02 1.00 31.70
1.50 40.00 2.00 0.888 1.02 1.00 108.69
S10 3.50 7.00 1.00 0.888 1.02 1.00 22.19
2.00 40.00 1.00 0.888 1.02 1.00 72.46
SUB-TOTAL: 77,130.93
188
ITEM 405 STRUCTURAL CONCRETE
STAIR SLAB
landing 4.50 1.50 0.10 4.00 1 2 5.40
STEP 0.60 0.22 0.17 16.00 5.00 2 3.55
CONCRETE SUNBREAKER
4.50 0.15 0.60 88.00 1.00 35.64
SEPTIC VAULT SLAB
TOP & BOT.SLAB 3.40 7.60 0.10 2.00 1.00 5.17
7.60 1.80 0.10 1.00 1.00 1.37
WALL 15.20 6.80 0.15 2.00 1.00 31.01
CISTERN SLAB
TOP & BOT. SLAB 25.00 15.00 0.10 2.00 2.00 150.00
-
SUB-TOTAL: 232.13 CU.M
189
SLAB-ON-FILL
SOF 85.00 17.00 0.10 1.00 1.00 144.50
TOTAL 144.50 CU.M
SLAB AT 2ND & 5TH FLR.
SUSPENDED SLAB
85.00 17.00 0.10 5.00 722.50
CANOPY 85.00 1.50 0.10 5.00 63.75
85.00 0.60 0.10 5.00 25.50
LESS 3.00 3.00 0.10 4.00 (3.60)
3.00 3.00 0.10 5.00 (4.50)
SUB-TOTAL: 803.65 CU.M
Q = ALL Q = ALL
190
C.R. PARTITION 3.50 3.20 14.00 1.00 4.00 627.20
Q = ALL Q = ALL
Q = 1 EACH Q = 1 EACH
191
Prepared by: Checked by: Submitted by:
192
APPROVED BUDGET FOR THE CONTRACT
Page 193
TOTAL AMNT.
Page 194
DETAILED ESTIMATES
Item No. A-1
Assistance for the Engineers QUANTITY 7.00 Mo.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Progress Photograph (Photo printing for
reports ) 1.00 set 7,000.00 7,000.00
-
Ink Cartidge, (Black & Colored) 1.00 L.S. 5,000.00 5,000.00
MATERIAL COST
Output rate:
MATERIAL COST River mix (plus 10% loose volume) 3,780.00 cu.m 400.00 1,512,000.00
Output rate:
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 46.04
Total Direct & Indirect Unit Cost 46.04
Total Direct & Indirect Cost 76,319.55
DETAILED ESTIMATES
Item No. SPL.1
Soil Exploration QUANTITY 3.00 hole
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
-
-
Sub- Total -
unit cost
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
EQUIPMENT COST
Sub- Total -
unit cost
Direct Unit Cost 50,000.00
Total Direct & Indirect Unit Cost 50,000.00
Total Direct & Indirect Cost 150,000.00
DETAILED ESTIMATES
Item No. SPL.2
Hauling of Materials (Double Handling) QUANTITY ALL L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
-
-
-
MATERIAL COST
Sub- Total -
unit cost
DESCRIPTION NO HOUR RATE(Pesos) TOTAL(Pesos)
-
EQUIPMENT COST
Sub- Total -
unit cost
Direct Unit Cost 69,825.00
Total Direct & Indirect Unit Cost 69,825.00
Total Direct & Indirect Cost 69,825.00
DETAILED UNIT PRICE ANALYSIS
Item No. 804 (d-1)
Gravel Fill (hand placed) QUANTITY 144.50 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 1.3600 cu.m / hour
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Angular bar nosing at step w/ flat bar strap 420.00 kgs 52.00 21,840.00
Output rate:
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 800.04
Total Direct & Indirect Unit Cost 800.04
Total Direct & Indirect Cost 6,575,504.95
DETAILED UNIT PRICE ANALYSIS
Item No. 1027
Cement Plaster Finish QUANTITY 16,392.34 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: Plastering = 8.3125 sq.m / hour
MATERIAL COST
Portland Cement 4,721.00 bags 250.00 1,180,250.00
Washed Sand 361.00 cu.m 700.00 252,700.00
Concrete mouldings 6.12 sq.m 500.00 3,060.00
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 154.23
Total Direct & Indirect Unit Cost 154.23
Total Direct & Indirect Cost 2,528,188.02
DETAILED UNIT PRICE ANALYSIS
Item No. 1003
Carpentry & Joinery Works QUANTITY 11,127.60 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: Frame Works = 10.2000 sq.m / hour
Plywood Installation = 8.5000 sq.m / hour
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 336.32
Total Direct & Indirect Unit Cost 336.32
Total Direct & Indirect Cost 3,742,424.02
DETAILED UNIT PRICE ANALYSIS
Item No. 403 (a)
Steel Trusses QUANTITY 8,175.59 kgs
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 170.0000 kgs / hour
erection/Installation = 0.3000 kgs / hour
painting = 29.7500 L.M/ hour
MATERIAL COST
Concrete Gutter (250mm) 3.33 CU. M 350.00
WATER PROOFING 1,653.00 SQ. M 21.20
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
Output rate:
Construction foreman 1.00 132.77 77.50
Skilled Laborer (tinsmithman) 3.00 132.77 57.50
LABOR COST
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
EQUIPMENT COST
Output rate:
Sub- Total
unit cost
Direct Unit Cost
PREPARED BY: 9% of total DC OCM
8% of total DC CP
5% of (total DC+OCM+CP) VAT
Total Direct & Indirect Unit Cost
Total Direct & Indirect Cost
DETAILED UNIT PRICE ANALYSIS
sq.m
TOTAL(Pesos)
1,163.75
35,043.60
36,207.35
21.90
TOTAL(Pesos)
10,289.68
22,902.83
56,759.18
89,951.68
54.42
TOTAL(Pesos)
2,822.69
2,822.69
28,853.83
34,499.21
20.87
97.19
8.75
7.78
5.69
119.40
197,368.65
DETAILED UNIT PRICE ANALYSIS
Item No. 1010
Doors QUANTITY 426.72 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: installation = 0.7089 sq.m / hour
#VALUE! 180.00
Sub- Total 1,327,050.00
unit cost 3,109.88
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 3,353.22
Total Direct & Indirect Unit Cost 3,353.22
Total Direct & Indirect Cost 1,430,886.38
DETAILED UNIT PRICE ANALYSIS
Item No. 1009
Windows QUANTITY 836.23
DESCRIPTION QUANTITY UNIT U- PRICE(P)
Output rate: installation = 2.0250 sq.m / hour
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
EQUIPMENT COST
Output rate:
Sub- Total
unit cost
Direct Unit Cost
Total Direct & Indirect Unit Cost
Total Direct & Indirect Cost
DETAILED UNIT PRICE ANALYSIS
sq.m
TOTAL(Pesos)
478,280.00
829,920.00
239,703.38
1,547,903.38
1,851.05
TOTAL(Pesos)
142,467.75
142,467.75
170.37
TOTAL(Pesos)
-
-
2,021.42
2,021.42
1,690,371.13
DETAILED UNIT PRICE ANALYSIS
Item No. 1032 a-1
Masonry Painting QUANTITY 32,784.68
DESCRIPTION QUANTITY UNIT U- PRICE(P)
Output rate: painting = 23.0504 sq.m / hour
MATERIAL COST
Paint Latex Gloss (Boysen) 656.00 gal 600.00
Paint Latex Semi-Gloss (Boysen) 656.00 gal 600.00
Water proofing paint 8.00 gal 600.00
Concrete Neutralizer 110.00 gal 340.00
Misc. materials (patching compound, brush, sand paper ,tinting color, etc.,)
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
Output rate:
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
EQUIPMENT COST
Output rate:
Sub- Total
unit cost
Direct Unit Cost
Total Direct & Indirect Unit Cost
Total Direct & Indirect Cost
DETAILED UNIT PRICE ANALYSIS
sq.m
TOTAL(Pesos)
393,600.00
393,600.00
4,800.00
37,400.00
25,000.00
854,400.00
26.06
TOTAL(Pesos)
-
490,693.50
135,118.50
625,812.00
19.09
TOTAL(Pesos)
40,000.00
40,000.00
1.22
46.37
46.37
1,520,212.00
DETAILED UNIT PRICE ANALYSIS
Item No. 1032 a-2
Wooden Painting QUANTITY 14,779.88
DESCRIPTION QUANTITY UNIT U- PRICE(P)
Output rate: painting = 18.8217 sq.m / hour
MATERIAL COST
Flat Wall Enamel (Boysen) 296.00 gal 600.00
Quick Dry Enamel (Boysen) 296.00 gal 600.00
Glazing Putty 50.00 gal 400.00
Misc. materials (paint thinner,patching compound, brush, sand paper,tinting color, etc.,)
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
Output rate:
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
EQUIPMENT COST
Output rate:
Sub- Total
unit cost
Direct Unit Cost
Total Direct & Indirect Unit Cost
Total Direct & Indirect Cost
DETAILED UNIT PRICE ANALYSIS
sq.m
TOTAL(Pesos)
177,600.00
177,600.00
20,000.00
20,000.00
395,200.00
26.74
TOTAL(Pesos)
-
225,762.25
149,199.40
374,961.65
25.37
TOTAL(Pesos)
25,804.41
25,804.41
1.75
53.85
53.85
795,966.06
DETAILED UNIT PRICE ANALYSIS
Item No. 1002
Plumbing Works QUANTITY All L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: installation = 12.5250 L.M / hour
Sub- Total -
unit cost -
Direct Unit Cost 341,737.13
PREPARED BY: 9% of total DC OCM 30,756.34
8% of total DC CP 27,338.97
5% of (total DC+OCM+CP) VAT 19,991.62
Total Direct & Indirect Unit Cost 419,824.06
Total Direct & Indirect Cost 419,824.06
DETAILED UNIT PRICE ANALYSIS
Item No. 1100
Electrical Works QUANTITY All L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: installation =
Wall Fan 24.00 set 2,300.00 55,200.00
Flourescent Lighting Fixtures (2X40 watts)
Aluminum Louver Recess 72.00 set 1,450.00 104,400.00
Flourescent Lighting Fixtures (1X40 watts)
Aluminum Louver Recess 46.00 set 1,120.00 51,520.00
Compact LED lamp 21.00 pcs. 350.00 7,350.00
Porcelain socket # 4"Ø 21.00 set 60.00 1,260.00
Light Switch 1 way 1 gang 35.00 set 210.00 7,350.00
Light Switch 1 way 2 gang 12.00 set 235.00 2,820.00
Light Switch 3 way 1 gang 4.00 set 280.00 1,120.00
Light Switch 3 way 2 gang 12.00 set 330.00 3,960.00
Utility Box (G.I. TYPE) 119.00 pcs. 35.00 4,165.00
PVC Conduit Long Elbow, 19mm Ø 3.00 pcs. 22.00 66.00
PVC Conduit Long Elbow , 12.50mm Ø 160.00 pcs. 16.00 2,560.00
PVC Conduit Pipe,12.50mm Ø 260.00 pcs. 79.00 20,540.00
PVC Conduit Pipe, 19mm Ø 48.00 pcs. 98.00 4,704.00
PVC Conduit Pipe, 25mm Ø 12.00 pcs. 127.00 1,524.00
MATERIAL COST
Sub- Total -
unit cost -
Direct Unit Cost 426,931.65
PREPARED BY: 9% of total DC OCM 38,423.85
8% of total DC CP 34,154.53
5% of (total DC+OCM+CP) VAT 24,975.50
Total Direct & Indirect Unit Cost 524,485.53
Total Direct & Indirect Cost 524,485.53
DETAILED UNIT PRICE ANALYSIS
Item No. 1018
Ceramic Tiles QUANTITY 11,700.75 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: Laying glazed tiles = 0.8400 sq.m / hour
Laying unglazed tiles = 0.5850 sq.m / hour
MATERIAL COST
Output rate:
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 66.99
PREPARED BY: 9% of total DC OCM 6.03
8% of total DC CP 5.36
5% of (total DC+OCM+CP) VAT 3.92
Total Direct & Indirect Unit Cost 82.29
Total Direct & Indirect Cost 118,912.29
DETAILED UNIT PRICE ANALYSIS
Item No. Spl 4
Railings QUANTITY 884.64
DESCRIPTION QUANTITY UNIT U- PRICE(P)
Output rate: installation = 3.0000 L.M / hour
G.I. Pipe along corridor, 50mmØ
A=4.10*4+3*2+2.10*2 26.60 L.M. 26.60 L.M. 300.00
Steel railings, 19mm sq. bar welded to 50mmØ GI Pipe
handrail along stair
A=(3.8*12)x0.90m 41.04 sq.m 41.04 sq.m 950.00
Steel railings, 19mm sq. bar welded to 50mmØ GI Pipe
handrail along stair wall
MATERIAL COST
#VALUE!
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
Output rate:
Construction foreman 1.00 160.00 77.50
Skilled Laborer (Welder) 2.00 160.00 57.50
LABOR COST
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos)
EQUIPMENT COST
Output rate:
Sub- Total
unit cost
Direct Unit Cost
Total Direct & Indirect Unit Cost
Total Direct & Indirect Cost
DETAILED UNIT PRICE ANALYSIS
sq.m.
TOTAL(Pesos)
7,980.00
38,988.00
-
27,060.00
-
66,600.00
13,680.00
19,395.00
1,620.00
8,500.00
-
183,823.00
207.79
TOTAL(Pesos)
12,400.00
18,400.00
45,600.00
76,400.00
86.36
TOTAL(Pesos)
20,000.00
20,000.00
22.61
316.77
316.77
280,223.00
DETAILED UNIT PRICE ANALYSIS
Item No. Spl.5
Occupational Safety & Health QUANTITY All LS
DESCRIPTION QUANTITY MAN-DAY U- PRICE(P) TOTAL(Pesos)
Safety Gears
MATERIAL COST
Safety Shoes 13440.00 Man-Day 3.77 50,668.80
Safety Helmet 13440.00 Man-Day 0.75 10,080.00
Safety Gloves 13440.00 Man-Day 8.67 116,524.80
15,000.00
Total Direct Cost 440,913.60
PREPARED BY: 0% of total DC OCM -
8% of total DC CP 35,273.09
5% of (total DC+OCM+CP) VAT 23,809.33
Total Item Cost 499,996.02
Adjusted Unit Cost 499,996.02
DETAILED UNIT PRICE ANALYSIS
Item No. Spl.6
Project Billboard QUANTITY 1.00 each
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day 1.00 gal./man-day
ACI BILLBOARD
Tarpaulin 32.00 sq.m. 30.00 960.00
Ordinary Plywood 1/4 1.00 pcs. 315.00 315.00
Coco Lumber 2 x 3 x 12 12.00 bd.ft. 28.00 336.00
Coco Lumber 2 x 2 x 12 16.00 bd.ft. 28.00 448.00
MATERIAL COST
COA BILLBOARD
Tarpaulin 64.00 sq.m. 30.00 1,920.00
Ordinary Plywood 1/4 2.00 pcs. 315.00 630.00
Coco Lumber 2 x 3 x 12 24.00 bd.ft. 28.00 672.00
Coco Lumber 2 x 2 x 12 32.00 bd.ft. 28.00 896.00
Assorted CWN 4.00 kgs. 70.00 280.00
Sub- Total
unit cost -
Direct Unit Cost 6,718.11
Total Direct & Indirect Unit Cost 6,718.11
Total Direct & Indirect Cost 6,718.11
DETAILED ESTIMATES
Item No. 803
Structural Excavation QUANTITY 2,280.48 cu.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day 5.00 cu.m/day
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Assumed Output/day 5.00 cu.m./day
Sub- Total -
unit cost -
Direct Unit Cost 416.24
PREPARED BY: 12% of total DC OCM 49.95
10% of total DC CP 41.62
12% of (total DC+OCM+CP) VAT 60.94
Total Direct & Indirect Unit Cost 568.75
Total Direct & Indirect Cost 1,297,017.53
DETAILED ESTIMATES
Item No. 403
Structural Steel QUANTITY All L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day
46.80 x 46.80 x 5.00mm AB (TC & BC) 3.00 pcs. 1,400.00 4,200.00
46.80 x 46.80 x 4.25mm AB (web & Cleats) 2.00 pcs. 980.00 1,960.00
C-Purlins 44 x 75 x 1.00mm 7.00 pcs. 455.00 3,185.00
MATERIAL COST
Asstd. RSB (16mm, 12mm & 10mm) 450.00 kgs 55.00 24,750.00
MATERIAL COST
Tanguile Panelled Door (2 sets - 0.90m x 2.10m) 3.78 sq.m. 2,500.00 9,450.00
(1 set - 1.20mx 1.20m & 1 set - 0.60m x 0.60m) 1.80 sq.m. 1,850.00 3,330.00
PVC Doors including Jamb and accessories
(0.80m x 2.10m) 1.00 sets 2,800.00 2,800.00
2" x 6" Door Jamb 35.00 bd.ft 75.00 2,625.00
Door knob 2.00 sets 1,550.00 3,100.00
Hinges 2"x4" 4.00 pairs 65.00 260.00
CWN (assorted) 4.00 kgs 70.00 280.00
Concrete Louver 8.00 pcs 25.00 200.00
Miscellaneous materials. All LS 500.00 500.00
Sub- Total -
unit cost -
Direct Unit Cost 25,531.54
PREPARED BY: 12% of total DC OCM 3,063.78
10% of total DC CP 2,553.15
12% of (total DC+OCM+CP) VAT 3,737.82
Total Direct & Indirect Unit Cost 34,886.30
Total Direct & Indirect Cost 34,886.30
DETAILED ESTIMATES
Item No. Spl.1
Masonry Works QUANTITY 8,218.97 sq.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day 16.00 sq.m./day
MATERIAL COST
Pre-painted ready made Ridge Roll (0.40mm) 2.00 L.m 220.00 440.00
Pre-painted ready made Gutter (0.40mm) 27.00 L.m 220.00 5,940.00
Pre-painted ready made wall Flashing (0.40mm) 8.00 L.m 220.00 1,760.00
Blind Rivets 2.00 boxes 200.00 400.00
Tekscrew 150.00 pcs. 2.00 300.00
Silicone Selant 4.00 pcs. 170.00 680.00
Sub- Total
unit cost -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Assumed Output/day - -
Note:
Labor includes repair & installation of old fences.
Sub- Total -
unit cost -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Assumed Output/day - -
Sub- Total
unit cost -
Direct Unit Cost -
PREPARED BY: 12% of total DC OCM -
12% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0017
Contract Name : Completion of Multi-Purpose Building at Buenlag 1st & Manabong Sur, Bayambang, Pangasinan, Construction of 2-Cl at
Arenas NHS, Ambayat 2nd, Bayambang, Pangasinan, Construction of 1-Cl at Bogaoan E/S, San Carlos City and Completion
of Multi-Purpose Building (Gym) at Brgy. Coliling & Brgy. Quintong, San Carlos City, Pangasinan (CLUSTER I)
MATERIALS COST
Flourescent Lighting Fixtures (40 watts) with box type housing ………………………… 650.00 / sets
Lighting Fixture (CFL 20 A) 150.00 / sets
Bulb Receptacles 45.00 / pcs.
Light Switch 1 way 2 gang 140.00 / pc.
Light Switch 1 way 1 gang 140.00 / pc.
Copper Wire #3.50mm2 TW 26.00 / mtrs.
Electrical Tape 40.00 / roll
PVC Pipe Flexible 1/2"dia. 15.00 / mtrs.
PVC Coupling PNS 14,1/2" dia. 10.00 / pcs.
PVC Pipe PNS 14,1/2"dia. 70.00 / pcs.
PVC Pipe PNS 14 1"dia. 140.00 / pcs.
PVC Adapter PNS 14,1/2"dia. 15.00 / pcs.
Entrance cap # 1/2"Ø 65.00 / pcs,
Junction Box (Deep tape w/ Cover) 30.00 / pcs.
Utility Box (Deep tape) ………………………… 25.00 / pcs.
PVC Pipe Flexible 1/2"dia. ………………………… 15.00 / mtrs.
1 set enclosed Panel box w/ 30 AT 2,450.00 / set
main Breaker and 2-20 AT Branch
Convenience outlet/w plate 150.00 / pcs.
EQUIPMENT RENTALS
Description Rentals
Plate Compactor ………………………… 610.00
Bar Cutter (manually operated) ………………………… 350.00
Concrete Mixer (1-Bagger) ………………………… 1,390.00
Concrete Vibrator ………………………… 510.00
Water truck (1000 gal) ………………………… 7,750.00
Welding machine ………………………… 500.00
Cutting Outfit w/ complete accessories ………………………… 150.00
Demountable Beam w/ Ropes ………………………… 700.00
Electric Drill ………………………… 100.00
Riveter ………………………… 100.00
Angle Grinder ………………………… 100.00
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at
Brgy. Sanlibo, Bayamabang, Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of
Multi-Purpose Bldg. at Bureau of Jail Management and Penology, Construction of Multi-Purpose Pavement at
Brgys. Sapinit, Polo and Turac, San Carlos City, Pangasinan (CLUSTER VI)
Contract Location: Bayambang & San Carlos City, Pangasinan
DETAILED ESTIMATES
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 530.00 1,060.00
Semi-skilled Laborer (Leadman) 1 2.00 350.00 700.00
Unskilled Laborer 4 2.00 290.00 2,320.00
Sub-total 4,080.00
Sub-total #VALUE!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 1.00 530.00 530.00
Skilled Laborer (Steelman) 2 1.00 400.00 800.00
Unskilled Laborer 4 1.00 290.00 1,160.00
Sub-total 2,490.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 1.00 350.00 350.00
Sub-total 350.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs #VALUE! bags 220.00 #VALUE!
Washed Sand #VALUE! cu. m. 500.00 #VALUE!
3/4" Crushed Gravel #VALUE! cu. m. 600.00 #VALUE!
Gravel fill 4.00 cu. m. 450.00 1,800.00
Forms All LS 5,000.00 5,000.00
Sub-total #VALUE!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 4.00 530.00 2,120.00
Skilled Laborer (Mason/Carpenter) 4 4.00 400.00 6,400.00
Unskilled Laborer 8 4.00 290.00 9,280.00
Sub-total 17,800.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete Mixer (1-Bagger) 1 4.00 1,390.00 5,560.00
Minor tools (10% of Labor) 1,780.00
Sub-total 7,340.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 4,055.00 pcs. 355.00 1,439,525.00
Ceiling joists (Nailers/Hangers) 66,766.00 bd. Ft. 75.00 5,007,450.00
Assorted CWN 35.00 kgs. 70.00 2,450.00
Sub-total 6,449,425.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 12.00 530.00 6,360.00
Skilled Laborer (Carpenter) 2 12.00 400.00 9,600.00
Unskilled Laborer 2 12.00 290.00 6,960.00
Sub-total 22,920.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings LS All 3,000.00 3,000.00
Sub-total 3,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Swing Type Steel Casement Window with Glass (1 s 1.80 sq.m. 1,850.00 3,330.00
#REF! #REF! #REF! 920.00 #REF!
#REF! #REF! #REF! 6,500.00 #REF!
PVC Doors including Jamb and accessories (0.80m 1.00 sets 2,850.00 2,850.00
#REF! #REF! #REF! 75.00 #REF!
#REF! #REF! #REF! 450.00 #REF!
#REF! #REF! #REF! 35.00 #REF!
CWN (assorted) 4.00 kgs 70.00 280.00
Miscellaneous materials. All LS 1,000.00 1,000.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 530.00 1,060.00
Skilled Laborer (Carpenter) 1 2.00 400.00 800.00
Unskilled Laborer 2 2.00 290.00 1,160.00
Sub-total 3,020.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric drill 1 2.00 100.00 200.00
Minor tools (10% of Labor) 302.00
Sub-total 502.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman #REF! #REF! 530.00 #REF!
Skilled Laborer (Electrician) 1 #REF! 400.00 #REF!
Unskilled Laborer 2 #REF! 290.00 #REF!
Sub-total #REF!
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
#REF! #REF! #REF! 6,750.00 #REF!
Faucet 26.00 set 80.00 2,080.00
#REF! #REF! #REF! 25.00 #REF!
PVC pipe 4" dia. 30.00 pcs. 125.00 3,750.00
PVC pipe 100mm Ø 78.00 pcs. 125.00 9,750.00
PVC pipe 150mm Ø 45.00 pcs. 110.00 4,950.00
PVC pipe 50mm Ø 50.00 pcs. 60.00 3,000.00
#REF! #REF! #REF! 290.00 #REF!
#REF! #REF! #REF! 580.00 #REF!
PVC Clean out w/ plug 100mm Ø 20.00 pcs. 290.00 5,800.00
PVC pipe 100mm Ø Elbow 1/8bend 10.00 pcs. 185.00 1,850.00
#REF! #REF! #REF! 500.00 500.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 530.00 -
Skilled Laborer (Plumber) 2 0.00 400.00 -
Unskilled Laborer 4 0.00 290.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
CHB ( 4" x 8" x 16") 102,738.00 pcs 10.00 1,027,380.00
Portland Cement, 40 kgs 4,291.00 bags 220.00 944,020.00
Washed Sand 358.00 cu.m 500.00 179,000.00
RSB 10mmØ 22,753.00 kgs 52.00 1,183,156.00
Tie wire # 16 GI 25.00 kgs 55.00 1,375.00
Sub-total 3,334,931.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 514.00 530.00 272,420.00
Skilled Laborer (Mason) 2 514.00 400.00 411,200.00
Unskilled Laborer 4 514.00 290.00 596,240.00
Sub-total 1,279,860.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete Mixer (1-Bagger) 1 514.00 1,390.00 714,460.00
Minor tools (10% of Labor) 127,986.00
Sub-total 842,446.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 7,377.00 bags 220.00 1,622,940.00
Washed Sand 328.00 cu.m 500.00 164,000.00
Sub-total 1,786,940.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 820.00 530.00 434,600.00
Skilled Laborer (Mason) 2 820.00 400.00 656,000.00
Unskilled Laborer 3 820.00 290.00 713,400.00
Sub-total 1,804,000.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 2,500.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Pre-painted Tri-wave Sheets (0.40mm) #VALUE! sq.m 220.00 #VALUE!
Blind Rivets 2.00 boxes 250.00 500.00
Silicone Selant 4.00 pcs. 180.00 720.00
#REF!
#REF! #REF! #REF! 430.00 #REF!
#REF! #REF! #REF! 80.00 #REF!
Miscellaneous #REF! #REF! 500.00 500.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 3.00 530.00 1,590.00
Skilled Laborer (Tinsmithman) 1 3.00 400.00 1,200.00
Unskilled Laborer 2 3.00 290.00 1,740.00
Sub-total 4,530.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 1 3.00 100.00 300.00
Riveter 1 3.00 100.00 300.00
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 3,100.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Safety Gears All LS 5,000.00 5,000.00
Signages, Barricades & Medicines All LS 8,000.00 8,000.00
Sub-total 13,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
First Aider 1.00 6.00 290.00 1,740.00
Part time Safety Practitioner 1.00 4.00 530.00 2,120.00
Sub-total 3,860.00
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
Item No. Description Amount
803 Structural Excavation 6,180.07
404 Reinforcing Steel Bars #VALUE!
405 Structural Concrete #VALUE!
1003 Carpentry & Joinery Works 6,537,500.68
1010 Doors & Windows #REF!
1100 Electrical Works #REF!
1002 Plumbing Works #REF!
Spl.1 Masonry Works 5,558,470.34
Spl.2 Plastering Works 3,672,675.22
Spl.3 Roofing Works #REF!
Spl.5 Occupational Safety & Health 497,246.04
One Million One Hundred Ninety Three Thousand Four Hundred Three & 23/100 pesos.
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at Brgy. Sanlibo, Bayamabang,
Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of Multi-Purpose Bldg. at Bureau of Jail Management and
Penology, Construction of Multi-Purpose Pavement at Brgys. Sapinit, Polo and Turac, San Carlos City, Pangasinan (CLUSTER VI)
BILL OF QUANTITIES
Part No. Part Description:
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
(Columns (1), (2), (3) and (4) are to be filled up by the
Procuring Entity) (Column (5) and (6) to be filled up by the Bidder)
Pay Item no. Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
twenty six thousand sixteen & 42/100 twenty six thousand sixteen & 42/100
Spl.3 Roofing Works LS All
pesos pesos
In figures: In figures:
Php #REF! Php #REF!
In words: Pesos In words: Pesos
twenty one thousand nine hundred eighty twenty one thousand nine hundred eighty
Spl.5
Occupational Safety &
LS All
& 99/100 pesos & 99/100 pesos
Health
In figures: In figures:
Php 497,246.04 Php 497,246.04
TOTAL AMOUNT IN WORDS
One Million One Hundred Ninety Three Thousand Four Hundred Three & 23/100 pesos.
Php #VALUE!
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
STATEMENT OF WORK ACCOMPLISHED
as of August 25, 2012
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
APPROVED QUANTITY TOTAL VALUE OF WORK ACCOMP
ITEM NO. DESCRIPTION UNIT TOTAL QTY: UNIT COST ITEM COST % Wt.
PREVIOUS THIS BILLING TO DATE PREVIOUS THIS BILLING TO DATE (%)
803 Structural Excavation cu.m 2,280.48 2.71 6,180.07 #VALUE! 10.75 10.75 29.13 29.13 #VALUE!
404 Reinforcing Steel Bars kgs. #VALUE! #VALUE! #VALUE! #VALUE! 178.78 178.78 #VALUE! #VALUE! #VALUE!
405 Structural Concrete cu.m. #VALUE! #VALUE! #VALUE! #VALUE! 3.65 3.65 #VALUE! #VALUE! #VALUE!
1003 Carpentry & Joinery Works sq.m. 11,127.60 587.50 6,537,500.68 #VALUE! - - - - #VALUE!
1010 Doors & Windows LS All #REF! #REF! #REF! - - #REF! #REF! #REF!
1100 Electrical Works L.S. All #REF! #REF! #REF! 0.20 0.20 #REF! #REF! #REF!
1002 Plumbing Works L.S. All #REF! #REF! #REF! - - #REF! #REF! #REF!
Spl.1 Masonry Works sq.m. 8,218.97 676.30 5,558,470.34 #VALUE! 279.72 279.72 189,170.61 189,170.61 #VALUE!
Spl.2 Plastering Works sq.m. 16,392.34 224.05 3,672,675.22 #VALUE! - - - - #VALUE!
Spl.3 Roofing Works #REF! #VALUE! #REF! #REF! #REF! - - #REF! #REF! #REF!
Spl.5 Occupational Safety & Health L.S. All 497,246.04 497,246.04 #VALUE! 0.27 0.27 134,256.43 134,256.43 #VALUE!
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Section. OIC-Chief MQC Section
Q = ALL Q = ALL
Q = ALL Q = ALL
Q = ALL Q = ALL
Q = ALL Q = ALL
Q = ALL Q = ALL
STATEMENT OF WORK ACCOMPLISHED
as of August 25, 2012
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Se OIC-Chief MQC Section
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
APPROVED QUANTITY TOTAL VALUE OF WORK ACCOMP
ITEM NO. DESCRIPTION UNIT TOTAL QTY: UNIT COST ITEM COST % Wt.
PREVIOUS THIS BILLING TO DATE PREVIOUS THIS BILLING TO DATE (%)
803 Structural Excavation cu.m 2,280.48 2.71 6,180.07 #VALUE! 10.75 2,269.73 2,280.48 6,180.07 - 6,180.07 #VALUE!
404 Reinforcing Steel Bars kgs. #VALUE! #VALUE! #VALUE! #VALUE! 178.78 #VALUE! #VALUE! 15,248.15 #VALUE! #VALUE! #VALUE!
405 Structural Concrete cu.m. #VALUE! #VALUE! #VALUE! #VALUE! 3.65 #VALUE! #VALUE! 22,039.07 #VALUE! #VALUE! #VALUE!
1003 Carpentry & Joinery Works sq.m. 11,127.60 587.50 6,537,500.68 #VALUE! 11,127.60 11,127.60 6,537,500.68 6,537,500.68 #VALUE!
1010 Doors & Windows LS All #REF! #REF! #REF! 1.00 1.00 #REF! #REF! #REF!
1100 Electrical Works L.S. All #REF! #REF! #REF! 0.20 0.80 1.00 10,225.62 #REF! #REF! #REF!
1002 Plumbing Works L.S. All #REF! #REF! #REF! 1.00 1.00 #REF! #REF! #REF!
Spl.1 Masonry Works sq.m. 8,218.97 676.30 5,558,470.34 #VALUE! 279.72 7,939.25 8,218.97 269,211.70 5,289,258.64 5,558,470.34 #VALUE!
Spl.2 Plastering Works sq.m. 16,392.34 224.05 3,672,675.22 #VALUE! 16,392.34 16,392.34 3,672,675.22 3,672,675.22 #VALUE!
Spl.3 Roofing Works #REF! #VALUE! #REF! #REF! #REF! 1.00 1.00 #REF! #REF! #REF!
Spl.5 Occupational Safety & Health L.S. All 497,246.04 497,246.04 #VALUE! 0.27 0.73 1.00 5,934.87 491,311.17 497,246.04 #VALUE!
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Section. OIC-Chief MQC Section
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Secti OIC-Chief MQC Section
MATERIALS COST
Flourescent Lighting Fixtures (40 watts) with box type housing ………………………… 650.00 / sets
Lighting Fixture (CFL 20 A) 150.00 / sets
Bulb Receptacles 45.00 / pcs.
Light Switch 1 way 2 gang 140.00 / pc.
Light Switch 1 way 1 gang 140.00 / pc.
Copper Wire #3.50mm2 TW 26.00 / mtrs.
Electrical Tape 40.00 / roll
PVC Pipe Flexible 1/2"dia. 15.00 / mtrs.
PVC Coupling PNS 14,1/2" dia. 10.00 / pcs.
PVC Pipe PNS 14,1/2"dia. 70.00 / pcs.
PVC Pipe PNS 14 1"dia. 140.00 / pcs.
PVC Adapter PNS 14,1/2"dia. 15.00 / pcs.
Entrance cap # 1/2"Ø 65.00 / pcs,
Junction Box (Deep tape w/ Cover) 30.00 / pcs.
Utility Box (Deep tape) ………………………… 25.00 / pcs.
PVC Pipe Flexible 1/2"dia. ………………………… 15.00 / mtrs.
1 set enclosed Panel box w/ 30 AT 2,450.00 / set
main Breaker and 2-20 AT Branch
Convenience outlet/w plate 150.00 / pcs.
EQUIPMENT RENTALS
Description Rentals
Plate Compactor ………………………… 610.00
Bar Cutter (manually operated) ………………………… 350.00
Concrete Mixer (1-Bagger) ………………………… 1,390.00
Concrete Vibrator ………………………… 510.00
Water truck (1000 gal) ………………………… 7,750.00
Welding machine ………………………… 500.00
Cutting Outfit w/ complete accessories ………………………… 150.00
Demountable Beam w/ Ropes ………………………… 700.00
Electric Drill ………………………… 100.00
Riveter ………………………… 100.00
Angle Grinder ………………………… 100.00
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at Brgy.
Sanlibo, Bayamabang, Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of Multi-Purpose
Bldg. at Bureau of Jail Management and Penology, Construction of Multi-Purpose Pavement at Brgys. Sapinit, Polo and
Turac, San Carlos City, Pangasinan (CLUSTER VI)
Contract Location: Bayambang & San Carlos City, Pangasinan
DETAILED ESTIMATES
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 540.00 1,080.00
Semi-skilled Laborer (Leadman) 1 2.00 350.00 700.00
Unskilled Laborer 4 2.00 280.00 2,240.00
Sub-total 4,020.00
Sub-total #VALUE!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 1.00 540.00 540.00
Skilled Laborer (Steelman) 2 1.00 400.00 800.00
Unskilled Laborer 4 1.00 280.00 1,120.00
Sub-total 2,460.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 1 1.00 350.00 350.00
Sub-total 350.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs #VALUE! bags 225.00 #VALUE!
Washed Sand #VALUE! cu. m. 480.00 #VALUE!
3/4" Crushed Gravel #VALUE! cu. m. 580.00 #VALUE!
Gravel fill 4.00 cu. m. 450.00 1,800.00
Forms All LS 5,000.00 5,000.00
Sub-total #VALUE!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 4.00 540.00 2,160.00
Skilled Laborer (Mason/Carpenter) 4 4.00 400.00 6,400.00
Unskilled Laborer 8 4.00 280.00 8,960.00
Sub-total 17,520.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete Mixer (1-Bagger) 1 4.00 1,390.00 5,560.00
Minor tools (10% of Labor) 1,752.00
Sub-total 7,312.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 4,055.00 pcs. 355.00 1,439,525.00
Ceiling joists (Nailers/Hangers) 66,766.00 bd. Ft. 75.00 5,007,450.00
Assorted CWN 35.00 kgs. 70.00 2,450.00
Sub-total 6,449,425.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 12.00 540.00 6,480.00
Skilled Laborer (Carpenter) 2 12.00 400.00 9,600.00
Unskilled Laborer 2 12.00 280.00 6,720.00
Sub-total 22,800.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings LS All 3,000.00 3,000.00
Sub-total 3,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Swing Type Steel Casement Window with Glass (1 set - 1.80 sq.m. 1,850.00 3,330.00
#REF! #REF! #REF! 920.00 #REF!
#REF! #REF! #REF! 6,500.00 #REF!
PVC Doors including Jamb and accessories (0.80m x 2. 1.00 sets 2,850.00 2,850.00
#REF! #REF! #REF! 75.00 #REF!
#REF! #REF! #REF! 450.00 #REF!
#REF! #REF! #REF! 35.00 #REF!
CWN (assorted) 4.00 kgs 70.00 280.00
Miscellaneous materials. All LS 1,000.00 1,000.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 2.00 540.00 1,080.00
Skilled Laborer (Carpenter) 1 2.00 400.00 800.00
Unskilled Laborer 2 2.00 280.00 1,120.00
Sub-total 3,000.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric drill 1 2.00 100.00 200.00
Minor tools (10% of Labor) 300.00
Sub-total 500.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman #REF! #REF! 540.00 #REF!
Skilled Laborer (Electrician) 1 #REF! 400.00 #REF!
Unskilled Laborer 2 #REF! 280.00 #REF!
Sub-total #REF!
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
#REF! #REF! #REF! 6,750.00 #REF!
Faucet 26.00 set 80.00 2,080.00
#REF! #REF! #REF! 25.00 #REF!
PVC pipe 4" dia. 30.00 pcs. 125.00 3,750.00
PVC pipe 100mm Ø 78.00 pcs. 125.00 9,750.00
PVC pipe 150mm Ø 45.00 pcs. 110.00 4,950.00
PVC pipe 50mm Ø 50.00 pcs. 60.00 3,000.00
#REF! #REF! #REF! 290.00 #REF!
#REF! #REF! #REF! 580.00 #REF!
PVC Clean out w/ plug 100mm Ø 20.00 pcs. 290.00 5,800.00
PVC pipe 100mm Ø Elbow 1/8bend 10.00 pcs. 185.00 1,850.00
#REF! #REF! #REF! 500.00 500.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 540.00 -
Skilled Laborer (Plumber) 2 0.00 400.00 -
Unskilled Laborer 4 0.00 280.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
CHB ( 4" x 8" x 16") 102,738.00 pcs 10.00 1,027,380.00
Portland Cement, 40 kgs 4,291.00 bags 225.00 965,475.00
Washed Sand 358.00 cu.m 480.00 171,840.00
RSB 10mmØ 22,753.00 kgs 55.00 1,251,415.00
Tie wire # 16 GI 25.00 kgs 57.00 1,425.00
Sub-total 3,417,535.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 514.00 540.00 277,560.00
Skilled Laborer (Mason) 2 514.00 400.00 411,200.00
Unskilled Laborer 4 514.00 280.00 575,680.00
Sub-total 1,264,440.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete Mixer (1-Bagger) 1 514.00 1,390.00 714,460.00
Minor tools (10% of Labor) 126,444.00
Sub-total 840,904.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 7,377.00 bags 225.00 1,659,825.00
Washed Sand 328.00 cu.m 480.00 157,440.00
Sub-total 1,817,265.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 820.00 540.00 442,800.00
Skilled Laborer (Mason) 2 820.00 400.00 656,000.00
Unskilled Laborer 3 820.00 280.00 688,800.00
Sub-total 1,787,600.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 2,500.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Pre-painted Tri-wave Sheets (0.40mm) #VALUE! sq.m 220.00 #VALUE!
Blind Rivets 2.00 boxes 250.00 500.00
Silicone Selant 4.00 pcs. 180.00 720.00
#REF!
#REF! #REF! #REF! 430.00 #REF!
#REF! #REF! #REF! 80.00 #REF!
Miscellaneous #REF! #REF! 500.00 500.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 3.00 540.00 1,620.00
Skilled Laborer (Tinsmithman) 1 3.00 400.00 1,200.00
Unskilled Laborer 2 3.00 280.00 1,680.00
Sub-total 4,500.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 1 3.00 100.00 300.00
Riveter 1 3.00 100.00 300.00
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 3,100.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Safety Gears All LS 5,000.00 5,000.00
Signages, Barricades & Medicines All LS 8,000.00 8,000.00
Sub-total 13,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
First Aider 1.00 6.00 280.00 1,680.00
Part time Safety Practitioner 1.00 4.00 540.00 2,160.00
Sub-total 3,840.00
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
Item No. Description Amount
803 Structural Excavation 6,189.42
404 Reinforcing Steel Bars #VALUE!
405 Structural Concrete #VALUE!
1003 Carpentry & Joinery Works 6,537,806.26
1010 Doors & Windows #REF!
1100 Electrical Works #REF!
1002 Plumbing Works #REF!
Spl.1 Masonry Works 5,621,811.26
Spl.2 Plastering Works 3,686,408.70
Spl.3 Roofing Works #REF!
Spl.5 Occupational Safety & Health 497,996.04
One Million One Hundred Ninety Five Thousand One Hundred Ninety Eight & 76/100 pesos.
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at Brgy. Sanlibo, Bayamabang,
Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of Multi-Purpose Bldg. at Bureau of Jail Management and
Penology, Construction of Multi-Purpose Pavement at Brgys. Sapinit, Polo and Turac, San Carlos City, Pangasinan (CLUSTER VI)
BILL OF QUANTITIES
Part No. Part Description:
Construction of 2-units 6-CL School Building (2-storey) at Malasiqui NHS, Malasiqui, Pangasinan
(Columns (1), (2), (3) and (4) are to be filled up by the
Procuring Entity) (Column (5) and (6) to be filled up by the Bidder)
Pay Item no. Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
twenty six thousand fifty five & 66/100 twenty six thousand fifty five & 66/100
Spl.3 Roofing Works LS All
pesos pesos
In figures: In figures:
Php #REF! Php #REF!
In words: Pesos In words: Pesos
twenty two thousand fourteen & 14/100 twenty two thousand fourteen & 14/100
Spl.5
Occupational Safety &
LS All
pesos pesos
Health
In figures: In figures:
Php 497,996.04 Php 497,996.04
TOTAL AMOUNT IN WORDS
One Million One Hundred Ninety Five Thousand One Hundred Ninety Eight & 76/100 pesos.
Php #VALUE!
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
DETAILED ESTIMATES
Item No. Spl.4
Steel Gate & Perimeter Fences QUANTITY All L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day
MATERIAL COST
Note:
Labor includes repair & installation of old fences.
12 1.00 12
Sub- Total 1,493.27
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Electric Drill 1 1.00 85.00 85.00
EQUIPMENT COST
Sub- Total -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Construction Foreman 1.00 1.00 524.36 524.36
Semi-skilled Laborer (Leadman) 1.00 1.00 351.21 351.21
Unskilled Laborer 3.00 1.00 293.96 881.88
LABOAR COST
Sub- Total -
Total Direct Cost 1,757.45
PREPARED BY: 12% of total DC OCM 210.89
12% of total DC CP 210.89
12% of (total DC+OCM+CP) VAT 261.51
Total Item Cost 2,440.75
Adjusted Unit Cost 1.07
DETAILED ESTIMATES
Item No. 104
Structure Backfill QUANTITY #VALUE! cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
River mix #VALUE! cu.m. 300.00 #VALUE!
MATERIAL COST
Sub- Total -
Total Direct Cost #VALUE!
PREPARED BY: 12% of total DC OCM #VALUE!
12% of total DC CP #VALUE!
12% of (total DC+OCM+CP) VAT #VALUE!
Total Item Cost #VALUE!
Adjusted Unit Cost #VALUE!
DETAILED ESTIMATES
Item No. 409
Structural Steel QUANTITY All L.S
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
C-Rafter 46mmx150mm (1.20mm) 7.00 pcs. 1,060.00 7,420.00
C-Purlins 44mm x 75mm (1.0mm) 12.00 pcs. 455.00 5,460.00
Facia Board 50mm x 250mm (0.98mm) 5.00 pcs. 1,000.00 5,000.00
Anchor Bolt, 12mmØ x 150mm 12.00 pcs. 100.00 1,200.00
Anchor Bolt, 12mmØ x 100mm 12.00 pcs. 70.00 840.00
Base Plate 150mm x 150mm x 4mm 2.00 pcs. 150.00 300.00
MATERIAL COST
Pre-painted ready made ridge roll (0.40mm) 3.00 pcs. 475.00 1,425.00
Pre-painted ready made Flashing (0.40mm) 7.00 pcs. 475.00 3,325.00
Pre-painted ready made Gutter (0.40mm) 3.00 pcs. 475.00 1,425.00
Tekscrew 350.00 pcs. 1.85 647.50
Miscellaneous (sealant, blind revits, etc.,) All LS 300.00 300.00
6,564,058.50
DESCRIPTION NO DAYS RATE TOTAL(Pesos)
Construction Foreman 1.00 1.00 524.36 524.36
Skilled Laborer (Tinsmithman) 1.00 1.00 380.99 380.99
LABOR COST