You are on page 1of 20

JORVIN D.

ANGELES
BSCE 3

COLLEGE OF ENVIRONMENTAL DESIGN AND ENGINEERING


CIVIL ENGINEERING DEPARTMENT

CEPM 1
CONSTRUCTION OF METHOD & PROJECT MANAGEMENT

Assignment 7

SUBMITTED BY:
ANGELES, JORVIN D.
BSCE III

SUBMITTED TO:
Engr. LOURDES HIPOLITO

DATE OF SUBMISSION
JULY 6, 2022
JORVIN D. ANGELES
BSCE 3

From Chapter 14-17,


1. Adopt items that you may use in your structure.
2. Enumerate them and include them in the structure you are working with. Include them
in your estimate
3. Estimate now the windows and doors in your structure.
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3
JORVIN D. ANGELES
BSCE 3

You might also like