You are on page 1of 8

ARCHITECTURAL DEISGN - 5

DESKTOP STUDY
SPOORTHI.N
18171AA063
SOUTHERN GUJARAT CHAMBER OF COMMERCE AND INDUSTRY , SURAT
SURAT INTERNATIONAL EXHIBITION AND CONVENTION CENTER
INTRODUCTION:

➢ ESTABLISHED IN 1940, THE SOUTHERN GUJARAT


CHAMBER OF COMMERCE AND INDUSTRY IS THE OLDEST
CHAMBER IN THE STATE OF GUJARAT AND IS THE ONLY
CHAMBER OF COMMERCE WHICH BOASTS OF A
CONVENTION CENTRE.
➢ TO KEEP PACE WITH THE CHANGING ECONOMIC
SCENARIO, A NEED WAS FELT TO BUILD A WORLD CLASS LOCATION OF GUJARAT, SURAT
CONVENTION CENTRE IN SURAT, WHICH COULD SITE ENTRY EXHIBITION HALL GROUND FLOOR PLAN
PROVIDE A PLATFORM TO ORGANIZE EXHIBITIONS,
TRADE SHOWS, BUYER –SELLER MEETS AND SEMINARS.
➢ THE SURAT INTERNATIONAL EXHIBITION AND
CONVENTION CENTRE (SIECC) WAS INITIATED TO ADRESS
THIS NEED.
➢ THE GOVERNMENT OF GUJARAT ALLOTED 1,30,000
SQUARE METERS OF LAND TO DEVELOP SIECC AT
SARSANA, SURAT.
➢ THE MINISTRY OF COMMERCE AND INDUSTRY,
GOVERNMENT OF INDIA, HAS ALLOTED A GRANT UNDER
THE INDUSTRIAL INFRASTRUCTURE UPGRADATION FIRST FLOOR PLAN

SCHEME (IIUS) TO DEVELOP SUCH A FACILITY ON A SCALE


THAT WILL BE APPROPRIATE FOR AN ALL NEW AND
MODERN METROPOLIS WHICH WILL BE IMPLEMENTED BY
SPV SAR INFROSONIC PVT. LTD.
➢ SIECC IS THE PRIDE OF INDIA. IT IS A STATE OF THE ART
CONVENTION CENTRE EQUIPPED WITH ALL MODERN
AMENITIES.

PROGRAM: PARKING
4 SEMINAR HALSS CAPCITY OF CARS -750
50 TO 150 PERSONS THREE WHEELERS – 100
ORGANISER’S OFFICE TWO WHEELERS – 3000
VIP LOUNGE COACHES/BUSES – 25
MEETING ROOM TAXIS -50
PRESS LOUNGE TRAILER TRUCKS / SITE IS 07 KM FROM AIRPORT
MEDICAL ROOM CONTAINERS – 15 AND 15 KM FROM RAILWAY
BUSSINESS CENTRE DELIVERY VEHICLES – STATION
CAFETERIA TEMPOS -50 SITE PLANNING:
BANK AND ATM CENTRE 1. SIECC BUILDING – 13,000 SQ.M.
ADMINISTRATOR’S OFFICE 2. AUDITORIUM – 1000 CAPACITY
TRAVEL CENTRE 3. ADMINISTRATION BUILDING – 760
HIGHLIGHTS: SQ.M.
COLUMN – FREE AND MULTI –USE 10,600 SQUARE METERS 4. KITCHEN + DINING – 300 SQ.M.
SPACE. 5. OPEN SPACE
HEIGHT – 17 METERS IN THE CENTER SLOPING TO 6.5 6. PARKING AREA
METERS. 7. SITE OFFICE – 210 SQ.M.
ABOUT THE STRUCTURE:

LENGTH - 135M
WIDTH - 90M
SPAN OF STRUCTURE ADMIN OTHER PROGRAMS
HEIGHT - 17M IN THE CENTRE SLOPING TO 6.5 M. GOODS VEHICLE ENTRY SERVICE ENTRY ON BACKSIDE

NET EXHIBITION AREA - 10,800 SQ MTS


FLOORING - TERMIX FLOORING
CEILING - PERFORATED METAL CURVED SHEETS
ENTRANCE AND EXITS - 6 MAIN ENT 4M* 2.1M
FREIGHT DOORS - 6M*5.5M HT – 2 NOS.
CEILING LIGHTING - @ 6M HT.AS PER DRAWING
VENTILATION – FULLY AIR CONDITIONED HALL HALF OCCUPIED HALL ARTIFICIAL LIGHTING AND COOLING SYSTEM LARGE WINDOWS AND DOORS TO LIT INSIDE WITH NATURALLY OPEN FOYER

FIRE SAFETY – SMOKE DETECTORS AND 6 FIRE EXITS. AUDITORIUM OPEN TO BUILT RATIO

STRUCTURE SYSTEM

➢ THE STRUCTURAL SYSTEM OF THE BUILDING IS FRAME


STRUCTURE WITH CONCRETE COLUMNS AND BEAMS.
➢ WHOLE PLANNING OF BUILDING IS IN GRID, IT WAS EASY TO
PUT THE COLUMNS AT THE JUNCTION.
➢ ON GROUND FLOOR, THE EXHIBITION SPACE WAS NEED TO BE
COLUMN FREE AND IT SHOULD BE MULTI-USEABLE, SO ALL THE
COLUMNS ARE PLACE AT THE PERIPHERY. • ABOUT STRUCTURE:
➢ BY DOING THESE THEY GOT 10,800 SQ.M OF SPACE FOR • HALL SIZE – 40M*30M
EXHIBITION. • CLEAR HEIGHT – 10M
➢ ALL THE SERVICES IS DESIGNED IN THE BAY ON THE BOTH SIDES • STAGE SIZE – 18M*25M
OF THE EXHIBITION SPACE, THEY ARE MADE USING TWO WAY • 1000 SEATING CAPACITY AUDITORIUM
SLAB ACCORDING TO THE STRUCTURAL GRID. WITH FULL BACK STAGE FACILITY
➢ THE BUILDING ID HAVING THE SHELL ROOF AND THE • PROVISION FOR RACKED SEATING SYSTEM
STRUCTURAL SYSTEM OF THE ROOF IS COMPOSITE STRUCTURE • BANQUET FACILITY AND SERVICES TO
IT IS MADE USING THE CONCRETE BEAMS AND THE TRUSSES. AUGMENT MULTIPURPOSE HALL.
➢ THE HEIGHT OF THE ROOF IS 17M IN THE CENTER SLOPING TO • OPEN STAGE FOR OUTDOORS
6.5 M. PERFORMANCES.
➢ EACH BEAM OF THE BUILDING IS SUPPORTED WITH OTHER • 6 CONFERENCE ROOMS WITH SEATING
BEAM USING THE HORIZONTAL TRUSSES AT THE ROOF LEVEL. CAPACITY RANGING FROM 10 TO 250
➢ EACH BEAM OF THE BUILDING IS SUPPORTED WITH OTHER SEATS.
BEAM USING THE HORIZONTAL TRUSSES AT THE ROOF LEVEL.
➢ EACH BEAMS CONSTRUCTED IN 4 PARTS AND 3 PARTS. • VIP GUEST ROOMS WITH
➢ AT THE WALL TWO BEAMS ARE CONNECTED BY THE SEPATARE DINING FACILITY
CONNECTORS MADE OF THE CONCRETE AND IRON PLATES • ARROWS SHOWS THE
USING WELDING AND REBATING SYSTEM. CIRCULATION OR
➢ AND FIXED WINDOW IS MADE BY THE CORRUGATED ACRYLIC MOVEMENT OF PEOPLE IN
SHEETS. THE BUILDING
CENTRE GEORGES
POMPIDOU , PARIS
, FRANCE
DESCRIPTION BUILDING STRUCTURE
➢ IN 1970 AN INTERNATIONAL ARCHITECTURAL ➢ THE BUILDING WAS DESIGNED ON THE LINES OF AN "EVOLVING
COMPETITION WAS LAUNCHED BASED ON A SPATIAL DIAGRAM" IN TWO PARTS: FIRSTLY, A 3-LEVEL
PROGRAM TO BUILD A CULTURAL AND ARTS INFRASTRUCTURE HOUSING THE TECHNICAL FACILITIES AND SERVICE
COMPLEX IN THE CENTRE OF HISTORIC PARIS SET AREAS; SECONDLY, A VAST 7-LEVEL GLASS AND STEEL
OUT BY FRENCH PRESIDENT GEORGES POMPIDOU. SUPERSTRUCTURE, INCLUDING A TERRACE AND MEZZANINE FLOOR,
➢ CHAIRED BY THE FRENCH ARCHITECT JEAN CONCENTRATING MOST OF THE CENTRE'S AREAS OF ACTIVITY.
PROUVÉ, THE PRIZE-WINNERS SELECTED BY THE JURY ➢ THE BUILDING'S METAL FRAMEWORK HAS 14 PORTICOS WITH 13
WERE RENZO PIANO, RICHARD ROGERS AND BAYS, EACH SPANNING 48 M AND STANDING 12.8 M APART.
GIANFRANCO FRANCHINI, ASSISTED BY OVE ARUP & ➢ ON TOP OF THE POSTS, ON EACH LEVEL, ARE MOULDED STEEL BEAM
PARTNERS. HANGERS, MEASURING 8 M IN LENGTH AND WEIGHING 10 TONNES.
➢ THE STRUCTURAL ENGINEERS IN CHARGE ON ➢ 45 M LONG GIRDERS REST ON THE BEAM HANGARS, WHICH SPREAD
ARUP'S BEHALF WERE THE ENGLISHMAN EDMUND STRESS THROUGH THE POSTS AND ARE BALANCED BY TIE-BEAMS
HAPPOLD AND THE IRISHMAN PETER RICE WHO ANCHORED ON CROSS-BARS.
HAD ALREADY WORKED TOGETHER ON THE ➢ EACH STOREY IS 7 M HIGH FLOOR-TO-FLOOR. THE GLASS AND STEEL
STRUCTURAL DESIGN FOR THE SYDNEY OPERA SUPERSTRUCTURE ENVELOPS THE FREE OPEN SPACES.
HOUSE. ➢ THE CENTRE POMPIDOU HOUSES A MUSEUM OF MODERN ART,
➢ CONSTRUCTION WORK STARTED IN APRIL 1972 AND REFERENCE LIBRARY, INDUSTRIAL DESIGN CENTRE, TEMPORARY
WORK ON THE METAL FRAMEWORK WAS BEGUN IN EXHIBITION SPACE, CHILDREN’S LIBRARY AND ART CENTRE, AUDIO-
SEPTEMBER 1974. ON FEBRUARY 2ND 1977, THE VISUAL RESEARCH CENTRE (IRCAM) AND RESTAURANTS.
CENTRE POMPIDOU OPENED ITS DOORS TO THE ➢ IT UNDERWENT RENOVATION FROM 1996 TO 1999 AND REOPENED
PUBLIC. URBAN CONTEXT ON JANUARY 1ST 2000.
➢ A FURTHER IMPORTANT ELEMENT WAS THE ARCHITECT'S ➢ IN 2010 AN EXTENSION TO THE CENTRE POMPIDOU DESIGNED BY
INTENTION TO CREATE A MEETING SPACE NOT ONLY THE JAPANESE ARCHITECT SHIGERU BAN OPENED AS THE CENTRE
FOR THE ART LOVER, BUT ALSO FOR THE LOCAL POMPIDOU METZ IN THE WEST OF FRANCE.
RESIDENTS.
➢ THE LARGE SLIGHTLY SLOPED PAVED PIAZZA IN FRONT OF
THE BUILDING FULFILLS THIS ROLE INTRODUCING THE
HIGH-TECH STRUCTURE OF THE BUILDING TO ITS
TRADITIONAL SURRUNDINGS AND PARIS STREET LIFE.
➢ ON HI WEBSITE RICHARD ROGERS NOTES THAT
"POMPIDOU PROVES THAT MODERNITY AND TRADITION
CAN PROFITABLY INTERACT AND ENHANCE HISTORIC
DESIGN CONCEPT CITIES."
➢ ROGERS' AND PIANO'S CONCEPT FOR THE CENTRE POMPIDOU
DREW MAJOR INFLUENCES FROM THE WORKS OF CEDRIC
PRICE WHO EXPERIMENTED IN THE 1960S WITH OPEN FORMS
AND FLEXIBLE SPACES. BUILDING SPECIFICATIONS
➢ TO MAXIMIZE INTERNAL SPACE, THEY TURNED THE LAND AREA : 2 HECTORS ( 5 ACRES )
CONSTRUCTION INSIDE-OUT AND EXPOSED A SKELETON OF FLOOR AREA : 103,305 SQ.M
BRIGHTLY COLORED TUBES FOR MECHANICAL SYSTEMS. SUPERSTRUCTURE : 7 LEVELS
➢ THE DUCTS ON THE OUTSIDE OF THE BUILDING ARE COLOUR- INFRA STRUCTURE : 3 LEVELS
CODED: BLUE FOR AIR, GREEN FOR FLUIDS, YELLOW FOR HEIGHT : 42M ( ROAD BEAUBOURG
ELECTRICITY CABLES AND RED FOR MOVEMENT AND FLOW SIDE ), 45.5 M( PLAZA SIDE )
(ELEVATORS, STAIRS) AND SAFETY (FIRE EXTINGUISHERS). LENGTH : 166M
➢ AS WITH PRICE'S FUN PALACE, AN UNBUILT PROJECT, THE WIDTH : 60M
PRIORITY WAS TO MAXIMISE FUNCTIONAL MOVEMENT AND DIMENSION
FLOW, FREEING UP INTERNAL SPACE AND FACILITATING THE DEPTH : 18M; LENGTH : 180M; WIDTH :
INTERACTION BETWEEN DIFFERENT DISCIPLINES. 110M
GROUND FLOOR SECOND FLOOR FOURTH FLOOR

BASEMENT FIRST FLOOR THIRD FLOOR

CIRCULATION STRUCTURE

SIXTH FLOOR

FIFTH FLOOR

ELEVATIONS
MECHANICAL SYSTEMS
COLOUR CODES
SECTIONS ▪ EVERYTHING IS COLOR
COATED
▪ GREEN = PLUMBING
▪ BLUE = CLIMATE CONTROL
▪ YELLOW = ELECTRICAL
▪ RED = CIRCULATION
ELEMENTS AND SAFETY
DEVICES
▪ WHITE = LARGE HVAC
PERSPECTIVES COMPONENTS

STRUCTURAL SYSTEM
EACH OF THE 13 BAYS CONSISTS OF A
TRUSS, SUPPORTED BY COLUMNS ON
BOTH SIDES. TO STABILIZE EACH BAY ON
BOTH SIDES, GERBERETTES WERE USED.
GERBERETTES ARE SMALL
NIGHT TIME PRESENCE CANTILEVERED PIVOTING BEAMS THAT
ALLOW THE TIE RODS AND THE
COLUMNS TO SHARE THE VERTICAL
LOAD. WHERE THE GERBERETTE MEETS
THE COLUMN IS NOW THE FULCRUM
POINT OF THE CANTILEVER, CAUSING
THE TIE RODS TO BE IN TENSION WHILE
MODEL
COLUMN STAYS IN COMPRESSION.
EACH OF THE 13 BAYS SPAN 44.8
VIEWS
METERS, UNINTERRUPTED.