Architectural:

* This drawing is conditionally accepted subject to the following:


1) Comply the comments on herein drawing.
PROJECT :

PROPOSED 5 STARS HOTEL


2) To get final approval and confirmation of the louver design & AND
LUXURY APARTMENT
material from MEP Engineers. LOCATION :
WEST BAY, DOHA QATAR
3) Provide/submit a shop drawing for the fire-rated motorized PIN NO. ( 61070140, 61070141, 61070142 )
damper showing the aluminum washable filter, damper blades, CLIENT :

wire mesh, & actuator and its interfacing with the louvers. AL MANA GROUP W.L.L.
4) Provide mock-up fo final approval by the client and AEB.
5) Code B-Approved as noted:
CONSULTANT :

Alfeo G. Zuniega
P.O. Box 1148 Doha, Qatar Tel +974 4406 88 88 Fax +974 4447 78 68
Email aeb@aeb-qatar.com Web www.aeb-qatar.com

ABU DHABI * MANILA * KUALA LUMPUR * MUSCAT

MAIN CONTRACTOR :

SUB-CONTRACTOR-SPECIALIST :
Tel. #: 44502949/44502951
Fax #: 44502517

P.O. Box 55681, Doha, State of Qatar

Mech-B Website: www.skywall-qatar.com


Email: info@skywall-qatar.com

1. provide louver area


calculation to verify the
louver dimension and louver
free area is in accordance
with car park ventilation Height of the louvers herein are not matching with the
requirement and CFD IFC drawing, thus require confirmation by the MEP
analysis Engineer whether confirming MEP requirement.
2. coordinate with Ramco
MEP for ventilation
requirements. -This louver has a very wide clear opening causing to lose the essential function of the louver.
NOTE:- - Thickness of the louver blades as well as the louver blades setting and design shall be
1. ALL OPENING DIMENSION ARE TO BE CHECKED ON confirmed by MEP engineers whether such blades conform with the louver acoustical & other
SITE BEFORE FABRICATION. mechanical requirement before fabrication.
GENERAL NOTE
A ENLARGED PLAN OF INTAKE SHAFT-2 (3RD BASEMENT) B ENLARGED PLAN OF INTAKE SHAFT-2 (TYP. 2ND & 1ST BASEMENT) 1 ALL DIMENSIONS ARE IN MILLIMETERS
UNLESS OTHERWISE NOTED.
ALUMINIUM LOUVER SCHEDULE ALUMINIUM LOUVER SCHEDULE ALUMINIUM LOUVER SCHEDULE ALL LEVELS ARE IN METERS RELATIVE TO Q.N.H.D.
2
FLOOR REF. TYPE A HEIGHT(MM) QTY.(Nos.) REMARKS FLOOR REF. TYPE A HEIGHT(MM) QTY.(Nos.) REMARKS FLOOR REF. TYPE A HEIGHT(MM) QTY.(Nos.) REMARKS UNLESS OTHERWISE NOTED.

1 st BASEMENT LW-3 3250 1 - 1 st BASEMENT LW-4 3250 1 - 1 st BASEMENT LW-1 3250 1 -


2 nd BASEMENT LW-3 2550 1 - 2 nd BASEMENT LW-4 2550 1 - 2 nd BASEMENT LW-1 2550 1 -
3 rd BASEMENT LW-3 2700 1 - 3 rd BASEMENT LW-4 2700 1 - 3 rd BASEMENT LW-1 2700 1 -

A
002
REFERENCE DRAWINGS
REV DRAWING NO D M YEAR
A A-A0-2315 01 05 2018
4 A A-A0-0100 01 05 2018
4
3 002 A A-A0-0101 01 05 2018
1 002 1 3 1
002 A A-A0-0102 01 05 2018
002 002 002 002
'A'

'A'

'A'

'A'
2 2 2
002 002 002
DRAWING STATUS
A
B
C
4 ENLARGED DETAIL D

5 5 5
002 002 002

ELEVATION SECTION-A ELEVATION ELEVATION


VIEW FROM OUTSIDE VIEW FROM OUTSIDE VIEW FROM OUTSIDE
KEY PLAN
C ENLARGED ELEVATION - LW-3 QTY. :- 3 Nos. D ENLARGED ELEVATION - LW-4 QTY. :- 3 Nos. E ENLARGED ELEVATION - LW-1 QTY. :- 3 Nos.

*Why removed the upstand??? Upstand is indicated in the IFC drawing.


* Comment on the previous revision is only to show or indicate the
dimension of the upstand but not to remove it, thus the installation of
louver shall not be accepted if upstand will not be provided at site.

WEST BAY, DOHA QATAR PIN NO. ( 61070140, 61070141, 61070142 )

2 FOR APPROVAL BJ WA 06 04 2020


1 FOR APPROVAL BJ WA 05 03 2020
0 FOR APPROVAL BJ WA 16 02 2020
Rev Description Checked Approved D M YEAR

UNITE :

ALUMINIUM LOUVER - LW-3 & LW-4


THe upstand on herein detail had (SCHEDULE & ENLARGE DETAILS)
not commented on the previous PREPARED BY :

revision of this drawing because it K.Viswan

was already correct, but why the APPROVED BY:

ENG. BENJO
upstand omitted on this drawing???
DRAWING NO. :
1 ENLARGED DETAIL 2 ENLARGED DETAIL 3 ENLARGED DETAIL 5 ENLARGED DETAIL RTC-161-SD-A&G-LVR-LW-002 AS A1 R 2