You are on page 1of 4

PSS®CAPE

Compliance Module
Perform automated protection reliability
audits and studies to support regulatory
compliance

At a glance analyzing, maintaining, and preparing • NERC PRC-024-3 (Frequency and


the data required for reporting. Voltage Protection Relay Settings
With the increasing number of
for Generating Resources)
regulatory requirements being imposed Our solution
on protection departments within • PRC-025-2 (Generator Relay
Leading the market for highly detailed
transmission and generation utilities, Loadability)
protection simulation, PSS®CAPE
it is important to have a relay protection
enables protection engineers around • PRC-026-1 (Stable Power Swing
simulation software package to
the world to be more effective and their Relay Loadability)
assist with meeting these voluminous
power system to be more reliable. It is
requirements and help utilities • PRC-027-1 (Protection System
trusted by transmission and distribution
understand the reliability of their Coordination for Performance
protection engineers to support their
protection system. The PSS®CAPE During Faults)
entire workflow, including detailed
Compliance Module will help make
protection data collection, electronic
this process for compliance with North
setting management, setting
American Electric Reliability Corporation Compliance Module Key Benefits
calculations and validation. The
(NERC) regulatory requirements more
PSS®CAPE Compliance Module • Setup, save and store study
efficient and effective.
enhanced features to help customers parameters in PSS®CAPE to
The challenge achieve compliance with specific intuitively rerun the same
NERC PRC standards, including: compliant study in the future
Power utilities are mandated to comply
with NERC regulatory standards which • PRC-001 (System Protection • View colored coded study results
seek to assure their protection systems Coordination) to easily identify areas of non-
prevent and abate catastrophic outages compliance that require remedy
• PRC-002-2 (Identifying Required BES
and cascading events, while still actions
Buses for Events Recording (SER) and
correctly clearing faulted conditions.
Fault Recording Data) • Easily maintain and store study
Typically, the utility protection
data in a database – allowing you
department is responsible for providing • PRC-019-1 (Coordination of Generator
to compare study results over time
comprehensive reports showing Voltage Regulator Controls with Unit
evidence their system complies with Capabilities and Protection) • Supports with providing
these standard requirements. This documentation to prepare
• PRC-023-2 (Transmission Relay
task can be very time consuming compliance reports
Loadability)
and repetitive, including gathering,

siemens.com/pss-cape
Setup Once, Study Anytime NERC PRC-002-2: Disturbance automatically. Once the data is
Monitoring and Reporting prepared, PSS®CAPE automatically
Compliance is not a one-time event
Requirements identify your load-responsive protection
and utilities must continuously work to
and study them for loadability
ensure that compliance is maintained The purpose of PRC-002-2 is to have
compliance. The user controls the studied
on an ongoing basis. With the PSS®CAPE adequate data available to facilitate
contingency scenarios, are controlled
Compliance Module, you can setup analysis of Bulk Electric System (BES)
by the user, as the Compliance Module
your compliance studies, save the Disturbances. To comply with NERC
provides summary reporting and detailed
settings parameters and then rerun PRC-002-2, it is required that the
reporting at your fingertips.
these studies with just a few easy clicks. Transmission Owners “identify BES
The ability to save and store the settings buses for which sequence of events PRC-024-3: Frequency and Voltage
parameters ensures that your studies recording (SER) and fault recording Protection Settings for Generating
are run consistently and accurately (FR) data is required by using the Resources
every time. The data from each study methodology in PRC-002-2, Attachment
This standard defines the requirement
is automatically stored in a database – 1,” with the purpose of having adequate
for Generator Owners to set their
where you can easily review and data available to facilitate analysis of
generator protective relays to ensure
compare the results of your studies. Bulk Electric System (BES) disturbances.
that generating units remain connected
Maintaining the data is an important
The PSS®CAPE Compliance Module during defined frequency and voltage
aspect of being able to provide records
offers the ability for quickly checking excursions.
of compliance during an audit.
whether your BES system has the
The PRC-024 PSS®CAPE Compliance
Compliance Standards Reporting minimum number of fault recorder
Module function simulates the
Support equipment and disturbance monitoring
performance of voltage, frequency
devices per standard. The PSS®CAPE
The PSS®CAPE Compliance Module will and volts-per-hertz protective devices
PRC-002 component of the Compliance
provide protection engineers support protecting generation units, transformer
Module delivers that number to you in
for eight NERC PRC standards. With GSUs, high-side of UATs of the BES under
just a few clicks.
the increasing number of regulatory voltage or frequency disturbance from the
requirements being imposed on PRC-019-2: Coordination of system. Their performance is then
utilities, it is important to have one Generating Unit or Plant Capabilities, compared to the boundary curves defined
relay protection simulation software Voltage Regulating Controls and in the NERC PRC-024 standard to check
tool that can assist with meeting these Protection whether the studied protection meets the
voluminous requirements and support requirements. The protection studied may
The Compliance Module of PSS®CAPE
your protection engineers to conduct come from relay or control unit. Auditable
verifies that the generating unit facility
their daily job requirements. There is compliance report data and auxiliary
or synchronous condenser voltage
no need for a separate application when graphs are generated automatically.
regulating controls, limit functions,
one solution can meet your needs.
equipment capabilities and protection PRC-025-2: Generator Relay
Supported NERC PRC Standards system settings are properly coordinated. Loadability
The capability curves, control and limit
PRC-001-1: System Protection This function evaluates the generator
curves of the generators are easily stored
Coordination relay loadability. Based on the system
in the PSS®CAPE database. The protective
data, all load-responsive protections
NERC PRC-001 requires the Generator devices modeled in PSS®CAPE for
that need to comply with the standard
Operator and Transmission Operator coordination validation include loss-of-
are picked out automatically, as well as
to coordinate with each other’s excitation, voltage, Volts/Hz, and over-
the PRC-025-2 Option that applies due
protection: “each Generator Operator excitation protection. Auditable
to its location within the generation
and Transmission Operator shall have… compliance reports can be generated
plant. Regardless of the complexity
revised fault analysis study…or other automatically.
of the generation plant topology,
equivalent evidence that will be used to
PRC-023-4: Transmission Relay
confirm that there was coordination of The PSS®CAPE Compliance Modules
Loadability
new protective systems or changes…” determines the compliance using the
Per standard, It is important that standard’s conservative calculation
PSS®CAPE evaluates the coordination
protective relay settings do not limit (Option A) and the special power flow
of the protection at different levels,
transmission loadability, or interfere solution specified by the standard
such as protection monitoring
with a system operators’ ability to (Option B). This latter is determined
adjacent transmission lines and the
protect system reliability. Protective with an in-house developed
line protection and backup transmission
relays must be set to reliably detect methodology which considers the
protection on the generation plant.
all fault conditions and protect the special requirements of the standard
Graphical and text comprehensive
electrical network from these faults. regarding the real power and reactive
reports of these studies are readily
power in the generators and voltage
available. Using the Compliance Module,
level at the point-of-interconnection.
users can perform transmission line
Summary reporting and detailed
loadability studies on one, several
reporting of calculations steps are
or all the BES lines of your system
available by user’s choice.

2
PRC-026-1: Relay Performance During decreasing manual intervention and to evaluate for compliance. The amount
Stable Power Swings human errors for repetitive tasks. of produced result may be staggering
and thus difficult to manipulate.
The PSS®CAPE Compliance Module PRC-027-1: Coordination of Protection
This is a problem that the Compliance
evaluates impedance-based protection Systems for Performance During
Module help you managing, as these
and overcurrent protection under stable Faults, Requirement 2, Option 1
results are stored in a separate SQL
power swing conditions to ensure that
PSS®CAPE is the pioneer in protection database. The PRC-027 coordination
load-responsive protective relays will
system simulation, developing studies result database may be tapped
not trip in response to these stable
through the years, multiples tools and by the Compliance Module to extract,
power swings under no fault conditions.
applications, from those analyzing a summarize and consolidate multiple
A unique power swing stability single contingency, to those automizing reports, produce from different
boundary is established for each thousands of coordination studies, each perspectives: you may choose reporting
impedance-based protective element in with great reporting capabilities. coordination/miscoordination/
the Compliance Module based on the coordination time interval violations,
The PRC-027 application in the
relay location and network parameters. violating relays/elements, summarizing
Compliance Module goes straits ahead.
Phase overcurrent relay pickup settings of performed study, etc. By tagging the
It is a complete suite of tools that allows
are compared with the maximum dates of those studies, the Compliance
you to fashion and flexibly configure
system current. Automatic batch study Module allows you to easily track the
massive automated coordination studies
is enabled in the Compliance Module status of your protection coordination
of the part of the system you would like
to reduce errors in the evaluation by compliance.

PRC-026 distance element evaluation results and Power Swing Boundary plot – Graphical and written color-coded results help you easily determine
whether the distance protection under study is complaint with the Power Swing Boundary requirements of the NERC PRC-026 standard.

PRC-027 Requirement 2 Option 1: Coordination Study Setup Options – Define the types of faults, fault locations and N, N-1, N-2 contingencies for
running automatic coordination studies for the line(s) of your preference. Reporting preferences and post-processing criteria are available for user
customization.

3
PRC-027 Requirement 2 Option 1: Coordination Study Contingency Report - The detailed, organized, color coded report information makes it straightfor-
ward to identify compliant coordination studies and the violating protection functions which require remedy actions.

PRC-027-1: Coordination of Protection tagged in your PSS®CAPE production Contact the Siemens PSS®CAPE team
Systems for Performance During database. Identifying which BES buses for the latest information on NERC PRC
Faults, Requirement 2, Option 2 in your system violate the PRC-027-1 compliance support within PSS®CAPE.
Requirement 2, Option 1 threshold and
PRC-027 requires utilities to maintain
performing coordination studies based
the coordination of protection devices
on those buses, is readily available. This
to detect and isolate faults on Bulk
identification may be made at different
Electric System (BES) Elements, such
levels: by substation, by Local Zone of
that those protective relays and systems
Protection (LZOP), etc.
operate in the intended sequence
during faults. Future Compliance Standards
Short-circuit studies of your BES buses PSS®CAPE is constantly being updated
are necessary to form a baseline and is to provide support for future NERC
easily done in the Compliance Module. PRC standards and other regulatory
These results are stored and historically requirements faced by our customers.

Published by For the U.S. published by


Siemens AG Siemens Industry, Inc.
Smart Infrastructure
Digital Grid
Humboldtstrasse 59 100 Technology Drive
90459 Nuremberg Alpharetta, GA 30005
Germany United States
For more information, please contact For more information, please contact
E–mail: psscape.energy@siemens.com E–mail: psscape.energy@siemens.com
Article No. SIDG-T10040-00-7600 – pss-cape-ComplianceModule
© Siemens 2020
Subject to changes and errors. The information given in this document only contains general descriptions and/or performance
features which may not always specifically reflect those described, or which may undergo modification in the course of further
development of the products. The requested performance features are binding only when they are expressly agreed upon in
the concluded contract.
The technical data presented in this document is based on an actual case or on as-designed parameters, and therefore should not
be relied upon for any specific application and does not constitute a performance guarantee for any projects. Actual results are
dependent on variable conditions. Accordingly, Siemens does not make representations, warranties, or assurances as to the
accuracy, currency or completeness of the content contained herein. If requested, we will provide specific technical data or
specifications with respect to any customer’s particular applications. Our company is constantly involved in engineering and
development. For that reason, we reserve the right to modify, at any time, the technology and product specifications contained
herein.

You might also like