2019-2020 Materials Tracking Enemy (buy motors)
FEES
chain motor purchase 2 motors $4,700.00 $4,700.00
shipping cost TBD
all welded pieces 25/75 gas tank size K 1 $125.00 $125.00 Tolman
Fee Totals: $4,825.00
LABOR
outside overhire Jake S. 120 $25.00 $3,000.00 build
outside overhire Kyle B. 20 $25.00 $500.00 build
outside overhire Lou G. 80 $25.00 $2,000.00 build
outside overhire Bill O. 20 $20.00 $400.00 build
outside overhire Sam O. 24 $20.00 $480.00 load in labor
$6,380.00
FRESHMEN ($12.00+)
SOPHOMORE ($12.50+)
student overhire Andi G.
student overhire Isabella L.
student overhire Nicholas m.
student overhire Zev P.
JUNIOR ($12.75+)
student overhire Jeff B.
student overhire James B.
student overhire Nikki Z.
student overhire Mary R.
SENIOR ($13.00+)
student overhire Sophia B.
student overhire Grace K.
student overhire Serena M.
student overhire Meghan P.
student overhire Steve S.
student overhire Henry Z.
weekly student labor ~ 7 weeks 7 $500.00 $3,500.00