Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 1 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
EACOP Project
This document has been generated by an Electronic Document Management System. When printed it is considered as a “for information only”
copy. The controlled copy is the screen version and it is the holder’s responsibility that he/she holds the latest valid version”.
EACOP ECW Security Management Plan
Rev. Status Date Revision Description Issued by Reviewed by Approved by
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 2 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
TABLE OF CONTENTS
1 PLAN, PURPOSE AND SCOPE 3
2 PURPOSE 3
3 SCOPE4
4 SECURITY ORGANISATION 4
4.1 Security Occupational Hazards 4
5 SECURITY CONTROL ROOM 4
5.1 Security Guard Houses/Shelter 4
6 PRINCIPLES FOR PROTECTING PEOPLE AND ASSETS 4
6.1 Introduction 4
7 USE OF FORCE 4
7.1 Government Security Forces 4
7.2 Mobilisation of Government Security Forces 4
7.3 Demonstrations 4
7.4 Site Security Principles 4
7.5 Safe Havens 4
7.6 Access Control 4
7.6.1 Visitors 4
7.6.2 Search of Person and Vehicles 4
7.6.3 Material management 4
7.6.4 Drugs, Firearms, and offensive weapons 5
8 EMERGENCY RESPONSE 5
8.1 Emergency Response Principles 5
9 ROLES AND RESPONSIBILITIES 5
9.1.1 Responsibilities Overview 5
9.1.2 H3SE Manager 5
10 PLAN IMPLEMENTATION AND MAINTAINENCE 5
10.1 Security Master Planning 5
10.2 Reviews 5
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 3 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
10.3 Training and Maintenance Schedule 5
10.4 Plan Review 5
10.5 Investigating and Reporting 5
10.6 Security and Task Matrix 5
11 PERSONNEL SECURITY 5
11.1 Security Awareness 5
11.2 Journey Management 5
11.2.1 In-Country Travel 5
12 INFORMATION SECURITY5
12.1.1 Identification Cards 6
12.1.2 Keys and Locks 6
13 ALERT LEVELS & TRIGGERS 6
14 APPENDIX 1 TRAINING AND MAINTENANCE SCHEDULE 7
15 APPENDIX 2 SECURITY MANAGEMENT TASK MATRIX 7
16 APPENDIX 3 SECURITY REGISTERS 8
17 APPENDIX 4 CORRECTIVE ACTIONS REQUEST 9
18 CORRECTIVE ACTION REGISTER 9
19 Appendix 5 Security Incident Report 10
1 PLAN, PURPOSE AND SCOPE
This Plan describes:
2 PURPOSE
.
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 4 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
3 SCOPE
4 SECURITY ORGANISATION
4.1 Security Occupational Hazards
5 SECURITY CONTROL ROOM
5.1 Security Guard Houses/Shelter
6 PRINCIPLES FOR PROTECTING PEOPLE AND ASSETS
6.1 Introduction
7 USE OF FORCE
7.1 Government Security Forces
7.2 Mobilisation of Government Security Forces
OGP320
7.3 Demonstrations
The following advice is present in OGP 308 and states the following:
7.4 Site Security Principles
7.5 Safe Havens
7.6 Access Control
7.6.1 Visitors
7.6.2 Search of Person and Vehicles
7.6.3 Material management
Material Onsite
Material Offsite
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 5 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
7.6.4 Drugs, Firearms, and offensive weapons
8 EMERGENCY RESPONSE
8.1 Emergency Response Principles
9 ROLES AND RESPONSIBILITIES
9.1.1 Responsibilities Overview
9.1.2 H3SE Manager
9.1.2.1 Key Responsabilités
10 PLAN IMPLEMENTATION AND MAINTAINENCE
10.1 Security Master Planning
10.2 Reviews
10.3 Training and Maintenance Schedule
Performance Requirement
Performance Requirement
10.4 Plan Review
Performance Requirement
10.5 Investigating and Reporting
Performance Requirement
10.6 Security and Task Matrix
11 PERSONNEL SECURITY
11.1 Security Awareness
Performance Requirement
Security Alerts and Warnings
11.2 Journey Management
11.2.1 In-Country Travel
Performance Requirement
12 INFORMATION SECURITY
Data sticks
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 6 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
12.1.1 Identification Cards
ID card Issue and Recall
Visitor ID Cards
Lost or Stolen Cards
12.1.2 Keys and Locks
Performance Requirement
Key Register
Issue and Recall
Key Cabinet
Key Copying
Key Custody
Lost or Stolen
13 ALERT LEVELS & TRIGGERS
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 7 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
14 APPENDIX 1 TRAINING AND MAINTENANCE SCHEDULE
15 APPENDIX 2 SECURITY MANAGEMENT TASK MATRIX
16 APPENDIX 3 SECURITY REGISTERS
Security/Equipment Issue Register
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 8 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
17 APPENDIX 4 CORRECTIVE ACTIONS REQUEST
18 CORRECTIVE ACTION REGISTER
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 9 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
19 APPENDIX 5 SECURITY INCIDENT REPORT
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.
Document Number:
EACOP ECW Security Management Plan Revision: Step:
Rev. Date:
Doc. Type: PLN Discipline: SEC Phase: DE Class: 1 Page 10 of 10
CONTRACTOR Doc No.: System / Subsystem: NN Equipment Type: NA
This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.