COTTAGE HOLDINGS SDN. BHD.

STANDARDS
MALAYEIK
(Company No. 16593-D)
1st Floor, Lot 327, Section 10, Jalan Rubber, 93400 Kuching. KGS Qs 18042014 CB 15

P.O. Box B No. 59, Satok Post Office, 93860 Kuching. Sarawak. Comply with: MS IS0 9001
Tel: 082-232739 Fax: 082-251831 Comply with: ISO 9001
Email: bidayuh@yaho0.com Certificate No: 110136

Ruj. Tuan: PWD/NRO/BLG/B036/2021/CC ()


Ruj. Kami: CHSB/PWD-B036(SK-SSS)/2021 (112)

22 March, 2022

Regional Manager
Northern Regional Office, JKR Sarawak
Lot 3509, Plot 3, Tower 1, Al-Bayt Square
Pusat Komersial Kompleks Islam
KM4, Jalan Pujut/Miri
98000 Miri, Sarawak.
Tel: 085-442221, Building Section
Fax: 085-442229

Dear Sir

T/347/09/2020
cONTRACT NO.: PWD/HO/B036/2021
SEKOLAH KRTIKAL BAGI SABAH DAN SARAWAK - CADANGAN PEMBINAAN BANGUNAN
GANTIAN PENUH BILIK DARJAH, BANGUNAN PENTADBIRAN, MAKMAL, RUMAH GURU DAN
KEMUDAHAN LAIN
RE: REALIGNMENT / RELOCATION OF CLASS FQUARTERS BEHIND RTP HALL

We kindly refer to your letter (Ref No.: PWD/NRO/BLG/B036/2021/GC[75) dated 10th January
2022 in response to our letter (Ref. No: CHSB/PWD-B036(SK-Sss)/2021(61) dated 8th
November 2021. We also refer to your letter to JPNS and their subsequent reply regarding
the above subject matter.

We would like to submit herewith our proposed layout for the Class F Quarters behind said
hall for your approval.

Apart from the 'Class FF Quarters proposed layout, we also include herewith the;

1. Re-alignment/ Shifting the access road parallel to existing Hall's structure to avoid
clashing with existing structure (Electric Pole, Pra-sekolah's fencing & Playground
area).
2. Drainage to follow the shifting of the road, while the direction of its flow to suit site
condition; which is discrepant from your Dwg Site Plan no.: B/J/SK/714/s/02. Kindly
refer to photo on Note no 3. for clearer assessment.
3. Relocation of the concrete crossover (serve no purpose) from the side of main road
(non-existing road drain refer to photo below) to the new proposed access to
Quarters No. 3 (behind Hall).
Photo 1: Left hand side of the road (facing hall

Photo 2: Right hand side of the road (facing hall)

We hope our explanation is clear and to your satisfaction. We humbly seek your kind approval
and further instructions on the matter as we wish to move forward as soonest possible.

Thank you.

Yours faithfully Acknowledgement of Receipt:

O L D

Sl162593-D)
2KUCHNG
*************************** *** *

ROYSON FE ANAKR`LAMÓ SAGAH Name:


Managing Director Date:
For COTTAGE HOLDINGS SDN BHD Stamp:

C.C. Ir. Wang Say Kwang, Superintending Officer Representative


Puan Azrina Abdul Rahman, Resident Engineer

Enc.