Professional Documents
Culture Documents
LGG Gcash
LGG Gcash
DWV
1. ______ – hole in the ground curbed with stones, bricks etc. (obsolete)
2. ________ – concrete sealed vault with wooden shelter (obsolete)
3. Septic Tank
4. ________ – consisting of STP
3. Storm Drain
· Location of Septic Tank: ______ from the outside wall, _____ away from any source of water supply.
For copper pipe, cutting is done by using 24-teeth per inch (heavy pipes) and 32-
teeth per inch(thinner). NEVER allow the fluxed joint to stand for more than 3
hours before soldering.
For plastic pipe,(1) joining by ______. (2) Insert and make a quarter
turn(1/4) and turning should not be more than 30sec. (3) 2 hours before
testing the line under pressure. (4) 15-20hrs permit to use of the line.