Project : DOWELL TOWER RESIDENCES

Subject : Project Balance of Works


Date :March 21, 2023

PLUMBING BALANCE OF WORK PER FLOOR

FLOORS LOCATION % Accomplished BALANCE OF WORK REASON OF DELAY


80% water line waiting for IBeam
80% sanitary line waiting for IBeam
Basement Toilet
0% toilet fixtures waiting for IBeam
0% water heater basement no delivery
Toilet 0% toilet fixtures waiting for door
GF
Sidewalk 50% sewer connection tapping to main collector
2nd Food Court 0% toilet fixtures finishes installed
3rd Parking 0% hose bib no delivery
Parking 0% hose bib no delivery
4th
Parking 0% hose bib no delivery
5th Parking 0% hose bib no delivery
Parking 0% hose bib no delivery
6th
Parking 0% hose bib no delivery
7th Parking 0% hose bib no delivery
Parking 0% hose bib no delivery
8th
Parking 0% hose bib no delivery
9th Parking 0% hose bib no delivery
Parking 0% hose bib no delivery
10th
Parking 0% hose bib no delivery
11th Parking 0% hose bib no delivery
0% toilet fixtures waiting for door
14th Toilet 0% water heater no delivery
0% plumbing fixtures waiting for door
0% faucet not installed
31st Units
0% grease trap not installed
0% faucet not installed
32nd Units 0% kitchen sink and faucet prob with real living
0% grease trap prob with real living
0% faucet prob with real living
33rd Units 50% lavatory prob with real living
0% grease trap prob with real living
0% water line waiting for final layout
0% sanitary line waiting for final layout
34th Penthouse 0% toilet fixtures waiting for final layout
0% water heater waiting for final layout
0% plumbing fixtures waiting for final layout
80% booster pump testing
70% deck drain delivered, for installation
Roof Deck RD
90% water tank testing
90% water line testing
ALL Testing 0% Water Heater Testing no working