PROJECT : 2 UNIT, 3 STOREY RESIDENCES

LOCATION : VICTORIA PLACE SUBD., MALABON CITY


OWNER : MRS. MARY ANN TAN

UNIT 1 - MONITORING ACTIVITY FORM


UNIT 1 - BEDROOM 1 T&B
MARCH 10-15, 2
ITEM NO. PARTICULAR 1st 2nd 3rd 4th 5th
STATUS STATUS STATUS STATUS
day day day day day
I ARCHITECTURAL WORKS
1 MASONRY & PLASTRING
1a CHB Installation 90.0%
1b Plastering Works 75.0%
1c Linear Meter 80.0%
1d Topping Works 0.0%
1e Coring Works 0.0%
2 CEILING WORKS
2a Furring and Carrying 0.0%
2b Hanger Rod & Support 0.0%
2c Ceiling Board 0.0%
2d Manhole 0.0%
3 SASH WORKS & HARDWARE
3a Installation of door jamb 0.0%
3b Installation of door 0.0%
3c Installation of door casing 0.0%
3d Installation of window casing 0.0%
3e Installation of door lockset 0.0%
3f Installation of door stopper
4 WINDOW & GLASS DOOR 0.0%
4a Installation of Window 0.0%
4b Sealant 0.0%
4c Installation of window handle 0.0%
5 PAINTING WORKS
5a Ceiling 0.0%
5b Walls 0.0%
5c Door jamb 0.0%
5d Door 0.0%
5e Door casing 0.0%
5f Window casing 0.0%
6 WATERPROOFING WORKS
6a Chipping/cleaning 0.0%
6b Primer 0.0%
6c First coat 0.0%
6d Top coat 0.0%
6f Flood test 0.0%
7 WALL TILES
7a Layout 0.0%
7b Installation of tiles 0.0%
7c Grouting 0.0%
7d Cleaning 0.0%
8 FLOOR TILES
6a Layout 0.0%
8b Installation of tiles 0.0%
8c Grouting 0.0%
8d Treashold 0.0%
8e Cleaning 0.0%
9 OTHERS
9a Face mirror 0.0%
9b Shower enclosure 0.0%
9c Closet Modular cabinet 0.0%
9d Lavatory cabinet 0.0%
9e Countertop finish 0.0%
II ELECTRICAL WORKS
10 BOX SETTING
10a Box setting for lighting 30.0%
10b Box setting for outlets 30.0%
10c Box setting for switches 30.0%
11 CONDUITS
11a Conduit for lighting 30.0%
11b Counduit for oulets 30.0%
11c Conduit for switches 0.0%
12 WIRES AND CABLES
12a Wiring for lighting 0.0%
12b Wiring for Outles 0.0%
12c Wiring for switches 0.0%
13 WIRING DEVICES
13a Wiring device for oulets 0.0%
13b Wiring device for swithes 0.0%
13c Megger testing 0.0%
14 PLATE COVER
14a Plate cover for outlets 0.0%
14b Plate cover for switches 0.0%
III MECHANICAL WORKS
15 EXHAUST FAN
15a Installation of pipe line 0.0%
15b Hanger and support 0.0%
15c Installation of flexible pipes 0.0%
15d Installation of exhaust fan 0.0%
15e Installation of end cap 0.0%
15f Testing operational 0.0%
IV PLUMBING WORKS
16 SEWER LINE
16a Sewer line 0.0%
16b Soil stack 0.0%
16c Vent pipes 0.0%
16d Hanger and support 0.0%
16e Testing 0.0%
17 WATERLINE
17a Cold water line 0.0%
17b Hot water line 0.0%
17c CWL riser 0.0%
17d Hanger and support 0.0%
17e Testing 0.0%
18 VALVES AND ACCESSORIES
18a Gate valve 0.0%
18b Floor drain 0.0%
18c Cleanout 0.0%
18d Gutter drain 0.0%
19 FIXTURES
19a Installation of watercloset 0.0%
19b Installation of lavatory 0.0%
19c Installation of Bidet 0.0%
19d Installation of waterheater 0.0%
19e Installation of shower valve 0.0%
19f Installation of shoer head 0.0%
19g Installation of telephone bidet 0.0%
19h Installation of faucet 0.0%
19i Installation of tissue holder 0.0%
19j Installation of soap holder 0.0%

Prepared by

Ar. Vicente Mias


Date

Checked by
Engr.. Jecyrill Cabangon
Date

Noted By

Ar. Jessie M. Bernardo


Date
ACTIVITY FORM
OM 1 T&B
MARCH 10-15, 2020
6th 7th 1 week
STATUS STATUS STATUS STATUS REMARKS
day day ACCOM.
PROJECT : 2 UNIT, 3 STOREY RESIDENCES
LOCATION : VICTORIA PLACE SUBD., MALABON CITY
OWNER : MRS. MARY ANN TAN

UNIT 1 - MONITORING ACTIVITY FORM


UNIT 1 - BEDROOM 2 T&B
MARCH 10-15, 2
ITEM NO. PARTICULAR 1st 2nd 3rd 4th 5th
STATUS STATUS STATUS STATUS
day day day day day
I ARCHITECTURAL WORKS
1 MASONRY & PLASTRING
1a CHB Installation 90.0%
1b Plastering Works 75.0%
1c Linear Meter 80.0%
1d Topping Works 0.0%
1e Coring Works 0.0%
2 CEILING WORKS
2a Furring and Carrying 0.0%
2b Hanger Rod & Support 0.0%
2c Ceiling Board 0.0%
2d Manhole 0.0%
3 SASH WORKS & HARDWARE
3a Installation of door jamb 0.0%
3b Installation of door 0.0%
3c Installation of door casing 0.0%
3d Installation of window casing 0.0%
3e Installation of door lockset 0.0%
3f Installation of door stopper
4 WINDOW & GLASS DOOR 0.0%
4a Installation of Window 0.0%
4b Sealant 0.0%
4c Installation of window handle 0.0%
5 PAINTING WORKS
5a Ceiling 0.0%
5b Walls 0.0%
5c Door jamb 0.0%
5d Door 0.0%
5e Door casing 0.0%
5f Window casing 0.0%
6 WATERPROOFING WORKS
6a Chipping/cleaning 0.0%
6b Primer 0.0%
6c First coat 0.0%
6d Top coat 0.0%
6f Flood test 0.0%
7 WALL TILES
7a Layout 0.0%
7b Installation of tiles 0.0%
7c Grouting 0.0%
7d Cleaning 0.0%
8 FLOOR TILES
6a Layout 0.0%
8b Installation of tiles 0.0%
8c Grouting 0.0%
8d Treashold 0.0%
8e Cleaning 0.0%
9 OTHERS
9a Face mirror 0.0%
9b Shower enclosure 0.0%
9c Closet Modular cabinet 0.0%
9d Lavatory cabinet 0.0%
9e Countertop finish 0.0%
II ELECTRICAL WORKS
10 BOX SETTING
10a Box setting for lighting 30.0%
10b Box setting for outlets 30.0%
10c Box setting for switches 30.0%
11 CONDUITS
11a Conduit for lighting 30.0%
11b Counduit for oulets 30.0%
11c Conduit for switches 0.0%
12 WIRES AND CABLES
12a Wiring for lighting 0.0%
12b Wiring for Outles 0.0%
12c Wiring for switches 0.0%
13 WIRING DEVICES
13a Wiring device for oulets 0.0%
13b Wiring device for swithes 0.0%
13c Megger testing 0.0%
14 PLATE COVER
14a Plate cover for outlets 0.0%
14b Plate cover for switches 0.0%
III MECHANICAL WORKS
15 EXHAUST FAN
15a Installation of pipe line 0.0%
15b Hanger and support 0.0%
15c Installation of flexible pipes 0.0%
15d Installation of exhaust fan 0.0%
15e Installation of end cap 0.0%
15f Testing operational 0.0%
IV PLUMBING WORKS
16 SEWER LINE
16a Sewer line 0.0%
16b Soil stack 0.0%
16c Vent pipes 0.0%
16d Hanger and support 0.0%
16e Testing 0.0%
17 WATERLINE
17a Cold water line 0.0%
17b Hot water line 0.0%
17c CWL riser 0.0%
17d Hanger and support 0.0%
17e Testing 0.0%
18 VALVES AND ACCESSORIES
18a Gate valve 0.0%
18b Floor drain 0.0%
18c Cleanout 0.0%
18d Gutter drain 0.0%
19 FIXTURES
19a Installation of watercloset 0.0%
19b Installation of lavatory 0.0%
19c Installation of Bidet 0.0%
19d Installation of waterheater 0.0%
19e Installation of shower valve 0.0%
19f Installation of shoer head 0.0%
19g Installation of telephone bidet 0.0%
19h Installation of faucet 0.0%
19i Installation of tissue holder 0.0%
19j Installation of soap holder 0.0%

Prepared by

Ar. Vicente Mias


Date

Checked by
Engr.. Jecyrill Cabangon
Date

Noted By

Ar. Jessie M. Bernardo


Date
ACTIVITY FORM
OM 2 T&B
MARCH 10-15, 2020
6th 7th 1 week
STATUS STATUS STATUS STATUS REMARKS
day day ACCOM.
PROJECT : 2 UNIT, 3 STOREY RESIDENCES
LOCATION : VICTORIA PLACE SUBD., MALABON CITY
OWNER : MRS. MARY ANN TAN

UNIT 1 - MONITORING ACTIVITY FORM


UNIT 1 - BEDROOM 6 T&B
MARCH 10-15, 2
ITEM NO. PARTICULAR 1st 2nd 3rd 4th 5th
STATUS STATUS STATUS STATUS
day day day day day
I ARCHITECTURAL WORKS
1 MASONRY & PLASTRING
1a CHB Installation 90.0%
1b Plastering Works 75.0%
1c Linear Meter 80.0%
1d Topping Works 0.0%
1e Coring Works 0.0%
2 CEILING WORKS
2a Furring and Carrying 0.0%
2b Hanger Rod & Support 0.0%
2c Ceiling Board 0.0%
2d Manhole 0.0%
3 SASH WORKS & HARDWARE
3a Installation of door jamb 0.0%
3b Installation of door 0.0%
3c Installation of door casing 0.0%
3d Installation of window casing 0.0%
3e Installation of door lockset 0.0%
3f Installation of door stopper
4 WINDOW & GLASS DOOR 0.0%
4a Installation of Window 0.0%
4b Sealant 0.0%
4c Installation of window handle 0.0%
5 PAINTING WORKS
5a Ceiling 0.0%
5b Walls 0.0%
5c Door jamb 0.0%
5d Door 0.0%
5e Door casing 0.0%
5f Window casing 0.0%
6 WATERPROOFING WORKS
6a Chipping/cleaning 0.0%
6b Primer 0.0%
6c First coat 0.0%
6d Top coat 0.0%
6f Flood test 0.0%
7 WALL TILES
7a Layout 0.0%
7b Installation of tiles 0.0%
7c Grouting 0.0%
7d Cleaning 0.0%
8 FLOOR TILES
6a Layout 0.0%
8b Installation of tiles 0.0%
8c Grouting 0.0%
8d Treashold 0.0%
8e Cleaning 0.0%
9 OTHERS
9a Face mirror 0.0%
9b Shower enclosure 0.0%
9c Closet Modular cabinet 0.0%
9d Lavatory cabinet 0.0%
9e Countertop finish 0.0%
II ELECTRICAL WORKS
10 BOX SETTING
10a Box setting for lighting 30.0%
10b Box setting for outlets 30.0%
10c Box setting for switches 30.0%
11 CONDUITS
11a Conduit for lighting 30.0%
11b Counduit for oulets 30.0%
11c Conduit for switches 0.0%
12 WIRES AND CABLES
12a Wiring for lighting 0.0%
12b Wiring for Outles 0.0%
12c Wiring for switches 0.0%
13 WIRING DEVICES
13a Wiring device for oulets 0.0%
13b Wiring device for swithes 0.0%
13c Megger testing 0.0%
14 PLATE COVER
14a Plate cover for outlets 0.0%
14b Plate cover for switches 0.0%
III MECHANICAL WORKS
15 EXHAUST FAN
15a Installation of pipe line 0.0%
15b Hanger and support 0.0%
15c Installation of flexible pipes 0.0%
15d Installation of exhaust fan 0.0%
15e Installation of end cap 0.0%
15f Testing operational 0.0%
IV PLUMBING WORKS
16 SEWER LINE
16a Sewer line 0.0%
16b Soil stack 0.0%
16c Vent pipes 0.0%
16d Hanger and support 0.0%
16e Testing 0.0%
17 WATERLINE
17a Cold water line 0.0%
17b Hot water line 0.0%
17c CWL riser 0.0%
17d Hanger and support 0.0%
17e Testing 0.0%
18 VALVES AND ACCESSORIES
18a Gate valve 0.0%
18b Floor drain 0.0%
18c Cleanout 0.0%
18d Gutter drain 0.0%
19 FIXTURES
19a Installation of watercloset 0.0%
19b Installation of lavatory 0.0%
19c Installation of Bidet 0.0%
19d Installation of waterheater 0.0%
19e Installation of shower valve 0.0%
19f Installation of shoer head 0.0%
19g Installation of telephone bidet 0.0%
19h Installation of faucet 0.0%
19i Installation of tissue holder 0.0%
19j Installation of soap holder 0.0%

Prepared by

Ar. Vicente Mias


Date

Checked by
Engr.. Jecyrill Cabangon
Date

Noted By

Ar. Jessie M. Bernardo


Date
ACTIVITY FORM
OM 6 T&B
MARCH 10-15, 2020
6th 7th 1 week
STATUS STATUS STATUS STATUS REMARKS
day day ACCOM.
PROJECT : 2 UNIT, 3 STOREY RESIDENCES
LOCATION : VICTORIA PLACE SUBD., MALABON CITY
OWNER : MRS. MARY ANN TAN

UNIT 1 - MONITORING ACTIVITY FORM


UNIT 1 - BEDROOM 6 T&B
MARCH 10-15, 2
ITEM NO. PARTICULAR 1st 2nd 3rd 4th 5th
STATUS STATUS STATUS STATUS
day day day day day
I ARCHITECTURAL WORKS
1 MASONRY & PLASTRING
1a CHB Installation 90.0%
1b Plastering Works 75.0%
1c Linear Meter 80.0%
1d Topping Works 0.0%
1e Coring Works 0.0%
2 CEILING WORKS
2a Furring and Carrying 0.0%
2b Hanger Rod & Support 0.0%
2c Ceiling Board 0.0%
2d Manhole 0.0%
3 SASH WORKS & HARDWARE
3a Installation of door jamb 0.0%
3b Installation of door 0.0%
3c Installation of door casing 0.0%
3d Installation of window casing 0.0%
3e Installation of door lockset 0.0%
3f Installation of door stopper
4 WINDOW & GLASS DOOR 0.0%
4a Installation of Window 0.0%
4b Sealant 0.0%
4c Installation of window handle 0.0%
5 PAINTING WORKS
5a Ceiling 0.0%
5b Walls 0.0%
5c Door jamb 0.0%
5d Door 0.0%
5e Door casing 0.0%
5f Window casing 0.0%
6 WATERPROOFING WORKS
6a Chipping/cleaning 0.0%
6b Primer 0.0%
6c First coat 0.0%
6d Top coat 0.0%
6f Flood test 0.0%
7 WALL TILES
7a Layout 0.0%
7b Installation of tiles 0.0%
7c Grouting 0.0%
7d Cleaning 0.0%
8 FLOOR TILES
6a Layout 0.0%
8b Installation of tiles 0.0%
8c Grouting 0.0%
8d Treashold 0.0%
8e Cleaning 0.0%
9 OTHERS
9a Face mirror 0.0%
9b Shower enclosure 0.0%
9c Closet Modular cabinet 0.0%
9d Lavatory cabinet 0.0%
9e Countertop finish 0.0%
II ELECTRICAL WORKS
10 BOX SETTING
10a Box setting for lighting 30.0%
10b Box setting for outlets 30.0%
10c Box setting for switches 30.0%
11 CONDUITS
11a Conduit for lighting 30.0%
11b Counduit for oulets 30.0%
11c Conduit for switches 0.0%
12 WIRES AND CABLES
12a Wiring for lighting 0.0%
12b Wiring for Outles 0.0%
12c Wiring for switches 0.0%
13 WIRING DEVICES
13a Wiring device for oulets 0.0%
13b Wiring device for swithes 0.0%
13c Megger testing 0.0%
14 PLATE COVER
14a Plate cover for outlets 0.0%
14b Plate cover for switches 0.0%
III MECHANICAL WORKS
15 EXHAUST FAN
15a Installation of pipe line 0.0%
15b Hanger and support 0.0%
15c Installation of flexible pipes 0.0%
15d Installation of exhaust fan 0.0%
15e Installation of end cap 0.0%
15f Testing operational 0.0%
IV PLUMBING WORKS
16 SEWER LINE
16a Sewer line 0.0%
16b Soil stack 0.0%
16c Vent pipes 0.0%
16d Hanger and support 0.0%
16e Testing 0.0%
17 WATERLINE
17a Cold water line 0.0%
17b Hot water line 0.0%
17c CWL riser 0.0%
17d Hanger and support 0.0%
17e Testing 0.0%
18 VALVES AND ACCESSORIES
18a Gate valve 0.0%
18b Floor drain 0.0%
18c Cleanout 0.0%
18d Gutter drain 0.0%
19 FIXTURES
19a Installation of watercloset 0.0%
19b Installation of lavatory 0.0%
19c Installation of Bidet 0.0%
19d Installation of waterheater 0.0%
19e Installation of shower valve 0.0%
19f Installation of shoer head 0.0%
19g Installation of telephone bidet 0.0%
19h Installation of faucet 0.0%
19i Installation of tissue holder 0.0%
19j Installation of soap holder 0.0%

Prepared by

Ar. Vicente Mias


Date

Checked by
Engr.. Jecyrill Cabangon
Date

Noted By

Ar. Jessie M. Bernardo


Date
ACTIVITY FORM
OM 6 T&B
MARCH 10-15, 2020
6th 7th 1 week
STATUS STATUS STATUS STATUS REMARKS
day day ACCOM.
PROJECT : 2 UNIT, 3 STOREY RESIDENCES
LOCATION : VICTORIA PLACE SUBD., MALABON CITY
OWNER : MRS. MARY ANN TAN

UNIT 1 - MONITORING ACTIVITY FORM


UNIT 1 - BEDROOM 6 T&B
MARCH 10-15, 2
ITEM NO. PARTICULAR 1st 2nd 3rd 4th 5th
STATUS STATUS STATUS STATUS
day day day day day
I ARCHITECTURAL WORKS
1 MASONRY & PLASTRING
1a CHB Installation 90.0%
1b Plastering Works 75.0%
1c Linear Meter 80.0%
1d Topping Works 0.0%
1e Coring Works 0.0%
2 CEILING WORKS
2a Furring and Carrying 0.0%
2b Hanger Rod & Support 0.0%
2c Ceiling Board 0.0%
2d Manhole 0.0%
3 SASH WORKS & HARDWARE
3a Installation of door jamb 0.0%
3b Installation of door 0.0%
3c Installation of door casing 0.0%
3d Installation of window casing 0.0%
3e Installation of door lockset 0.0%
3f Installation of door stopper
4 WINDOW & GLASS DOOR 0.0%
4a Installation of Window 0.0%
4b Sealant 0.0%
4c Installation of window handle 0.0%
5 PAINTING WORKS
5a Ceiling 0.0%
5b Walls 0.0%
5c Door jamb 0.0%
5d Door 0.0%
5e Door casing 0.0%
5f Window casing 0.0%
6 WATERPROOFING WORKS
6a Chipping/cleaning 0.0%
6b Primer 0.0%
6c First coat 0.0%
6d Top coat 0.0%
6f Flood test 0.0%
7 WALL TILES
7a Layout 0.0%
7b Installation of tiles 0.0%
7c Grouting 0.0%
7d Cleaning 0.0%
8 FLOOR TILES
6a Layout 0.0%
8b Installation of tiles 0.0%
8c Grouting 0.0%
8d Treashold 0.0%
8e Cleaning 0.0%
9 OTHERS
9a Face mirror 0.0%
9b Shower enclosure 0.0%
9c Closet Modular cabinet 0.0%
9d Lavatory cabinet 0.0%
9e Countertop finish 0.0%
II ELECTRICAL WORKS
10 BOX SETTING
10a Box setting for lighting 30.0%
10b Box setting for outlets 30.0%
10c Box setting for switches 30.0%
11 CONDUITS
11a Conduit for lighting 30.0%
11b Counduit for oulets 30.0%
11c Conduit for switches 0.0%
12 WIRES AND CABLES
12a Wiring for lighting 0.0%
12b Wiring for Outles 0.0%
12c Wiring for switches 0.0%
13 WIRING DEVICES
13a Wiring device for oulets 0.0%
13b Wiring device for swithes 0.0%
13c Megger testing 0.0%
14 PLATE COVER
14a Plate cover for outlets 0.0%
14b Plate cover for switches 0.0%
III MECHANICAL WORKS
15 EXHAUST FAN
15a Installation of pipe line 0.0%
15b Hanger and support 0.0%
15c Installation of flexible pipes 0.0%
15d Installation of exhaust fan 0.0%
15e Installation of end cap 0.0%
15f Testing operational 0.0%
IV PLUMBING WORKS
16 SEWER LINE
16a Sewer line 0.0%
16b Soil stack 0.0%
16c Vent pipes 0.0%
16d Hanger and support 0.0%
16e Testing 0.0%
17 WATERLINE
17a Cold water line 0.0%
17b Hot water line 0.0%
17c CWL riser 0.0%
17d Hanger and support 0.0%
17e Testing 0.0%
18 VALVES AND ACCESSORIES
18a Gate valve 0.0%
18b Floor drain 0.0%
18c Cleanout 0.0%
18d Gutter drain 0.0%
19 FIXTURES
19a Installation of watercloset 0.0%
19b Installation of lavatory 0.0%
19c Installation of Bidet 0.0%
19d Installation of waterheater 0.0%
19e Installation of shower valve 0.0%
19f Installation of shoer head 0.0%
19g Installation of telephone bidet 0.0%
19h Installation of faucet 0.0%
19i Installation of tissue holder 0.0%
19j Installation of soap holder 0.0%

Prepared by

Ar. Vicente Mias


Date

Checked by
Engr.. Jecyrill Cabangon
Date

Noted By

Ar. Jessie M. Bernardo


Date
ACTIVITY FORM
OM 6 T&B
MARCH 10-15, 2020
6th 7th 1 week
STATUS STATUS STATUS STATUS REMARKS
day day ACCOM.