Professional Documents
Culture Documents
Construction
Earth Works 9 Weight % Comp
Excavation 5 100%
Piles 2 100%
Loose Concrete 0.25 100%
Drainage Works 0.25 100%
Foundation Wall 0.25 0%
Water Isolation 0.75 0%
Protection concrete 0.5 0%
9
Prefabricated Production 15
Columns 4 25%
Beams 2 20%
Floors 7 35%
Roof Elements 2 0%
15
Structural Works 20
Anchors 0.25 0%
Foundation Steel Works 3 0%
Fittings in Foundation 0.25 0%
Foundation Concrete 0.5 0%
Columns Erection 3 0%
Level -6.65/-3.50 Rf concrete wall 2 0%
Level -6.65 topping Concrete 10 cm 0.75 0%
Level -3.50 Double TT and Beams 0.75 0%
Level -3.50/-0.00 Rf concrete wall 2 0%
Level -3.50 Topping Concrete 8 cm 0.75 0%
Level +8.80 Double TT and Beams 0.75 0%
Prefabricated Roof Structure 2 0%
Level +5.00 Double TT and Beams 0.75 0%
Level -+0.00 Double TT and Beams 0.75 0%
Level +8.80 Topping Concrete 8 cm 0.25 0%
Level +5.00 Topping Concrete 8 cm 0.75 0%
Level -0.00 Topping Concrete 8 cm 0.75 0%
Vertical water isolation 0.75 0%
20
Architectural Works 27
Terrace Roof 1 0%
Roof Construction & Covering 5 0%
Syphonic System 1 0%
Façade Covering 5 0%
Interior Walls 2 0%
Plastering and Grouting 1 0%
Thermal Insulation 1 0%
Doors and Windows 3 0%
Floor Coverings 2 0%
Paint works 3 0%
Carpet floors 2 0%
Fixed Furniture & Equipment 1 0%
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 0%
100
11.35
7.50
5.00 hakedişe tamamı girdi. 02.04 tarihinde tamamlandı
2.00 30.03 tarihinde başlık kirişiyle birlikte tamamlandı.
0.25 hakedişe tamamı girdi. 03.04 tarihinde tamamlandı
0.25 hakedişe tamamı girdi. 02.04 tarihinde tamamlandı
0.00 hakedişe girmedi. 30-03-03.04 tarihinde tamamlandı.
0.00 hakedişe girmedi. 01.04 tarihinde başlandı.
0.00 hakedişe girmedi. 03.04 tarihinde başlandı.
3.85
1.00
0.40
2.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Tarih : 08 Nisan Physical % Completed = 13.61
Construction
Earth Works 9 Weight % Comp 8.65
Excavation 5 100% 5.00
Piles 2 100% 2.00
Loose Concrete 0.25 100% 0.25
Drainage Works 0.25 100% 0.25
Foundation Wall 0.25 100% 0.25
Water Isolation 0.75 80% 0.60
Protection concrete 0.5 60% 0.30
9
Prefabricated Production 15 4.36
Columns 4 31% 1.24
Beams 2 23% 0.46
Floors 7 38% 2.66
Roof Elements 2 0% 0.00
15
Structural Works 20 0.60
Anchors 0.25 0% 0.00
Foundation Steel Works 3 20% 0.60
Fittings in Foundation 0.25 0% 0.00
Foundation Concrete 0.5 0% 0.00
Columns Erection 3 0% 0.00
Level -6.65/-3.50 Rf concrete wall 2 0% 0.00
Level -6.65 topping Concrete 10 cm 0.75 0% 0.00
Level -3.50 Double TT and Beams 0.75 0% 0.00
Level -3.50/-0.00 Rf concrete wall 2 0% 0.00
Level -3.50 Topping Concrete 8 cm 0.75 0% 0.00
Level +8.80 Double TT and Beams 0.75 0% 0.00
Prefabricated Roof Structure 2 0% 0.00
Level +5.00 Double TT and Beams 0.75 0% 0.00
Level -+0.00 Double TT and Beams 0.75 0% 0.00
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 0% 0.00
20
Architectural Works 27 0.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 0% 0.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 0%
100
Radye temel demir hazırlık işleri için
Tarih : 12 Nisan Physical % Completed = 16.01
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00
Piles 2 100% 2.00
Loose Concrete 0.25 100% 0.25
Drainage Works 0.25 100% 0.25
Foundation Wall 0.25 100% 0.25
Water Isolation 0.75 100% 0.75
Protection concrete 0.5 100% 0.50
9
Prefabricated Production 15 6.01
Columns 4 43% 1.72
Beams 2 43% 0.86
Floors 7 49% 3.43
Roof Elements 2 0% 0.00
15
Structural Works 20 1.00
Anchors 0.25 40% 0.10
Foundation Steel Works 3 30% 0.90
Fittings in Foundation 0.25 0% 0.00
Foundation Concrete 0.5 0% 0.00
Columns Erection 3 0% 0.00
Level -6.65/-3.50 Rf concrete wall 2 0% 0.00
Level -6.65 topping Concrete 10 cm 0.75 0% 0.00
Level -3.50 Double TT and Beams 0.75 0% 0.00
Level -3.50/-0.00 Rf concrete wall 2 0% 0.00
Level -3.50 Topping Concrete 8 cm 0.75 0% 0.00
Level +8.80 Double TT and Beams 0.75 0% 0.00
Prefabricated Roof Structure 2 0% 0.00
Level +5.00 Double TT and Beams 0.75 0% 0.00
Level -+0.00 Double TT and Beams 0.75 0% 0.00
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 0% 0.00
20
Architectural Works 27 0.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 0% 0.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 0%
100
sahaya getirilmesi + noktalarının çakılması + montaja başlanması
temel demirlerinin hazırlanması + asansör çukuru demirlerinin döşenmesi
Tarih : 20 Nisan Physical % Completed =
Construction
Earth Works 9 Weight % Comp
Excavation 5 100%
Piles 2 100%
Loose Concrete 0.25 100%
Drainage Works 0.25 100%
Foundation Wall 0.25 100%
Water Isolation 0.75 100%
Protection concrete 0.5 100%
9
Prefabricated Production 15
Columns 4 55%
Beams 2 54%
Floors 7 55%
Roof Elements (aşık) 1.5 65%
Roof Elements (trapez) 0.2 17%
Roof Elements (oluk) 0.3 0%
15
Structural Works 20
Anchors 0.25 100%
Foundation Steel Works 3 70%
Fittings in Foundation 0.25 15%
Foundation Concrete 0.5 0%
Columns Erection 3 0%
Level -6.65/-3.50 Rf concrete wall 2 0%
Level -6.65 topping Concrete 10 cm 0.75 0%
Level -3.50 Double TT and Beams 0.75 0%
Level -3.50/-0.00 Rf concrete wall 2 0%
Level -3.50 Topping Concrete 8 cm 0.75 0%
Level +8.80 Double TT and Beams 0.75 0%
Prefabricated Roof Structure 2 0%
Level +5.00 Double TT and Beams 0.75 0%
Level -+0.00 Double TT and Beams 0.75 0%
Level +8.80 Topping Concrete 8 cm 0.25 0%
Level +5.00 Topping Concrete 8 cm 0.75 0%
Level -0.00 Topping Concrete 8 cm 0.75 0%
Vertical water isolation 0.75 0%
20
Architectural Works 27
Terrace Roof 1 0%
Roof Construction & Covering 5 0%
Syphonic System 1 0%
Façade Covering 5 0%
Interior Walls 2 0%
Plastering and Grouting 1 0%
Thermal Insulation 1 0%
Doors and Windows 3 0%
Floor Coverings 2 0%
Paint works 3 0%
Carpet floors 2 0%
Fixed Furniture & Equipment 1 0%
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 0%
100
19.57
9.00
5.00
2.00
0.25
0.25
0.25
0.75
0.50
8.18
2.22
1.07
3.88
0.98
0.03
0.00
2.39
0.25
2.10
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Date : 27April 2009 Physical % Completed = 23.35
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00
Piles 2 100% 2.00
Loose Concrete 0.25 100% 0.25
Drainage Works 0.25 100% 0.25
Foundation Wall 0.25 100% 0.25
Water Isolation 0.75 100% 0.75
Protection concrete 0.5 100% 0.50
9
Prefabricated Production 15 10.05
Columns 4 69% 2.77
Beams 2 62% 1.25
Floors 7 64% 4.50
Roof Elements (purlin) 1.5 98% 1.47
Roof Elements (truss) 0.2 33% 0.07
Roof Elements (gutter) 0.3 0% 0.00
15
Structural Works 20 4.30
Anchors 0.25 100% 0.25
Foundation Steel Works 3 100% 3.00
Fittings in Foundation 0.25 100% 0.25
Foundation Concrete 0.5 100% 0.50
Columns Erection 3 10% 0.30
Level -6.65/-3.50 Rf concrete wall 2 0% 0.00
Level -6.65 topping Concrete 10 cm 0.75 0% 0.00
Level -3.50 Double TT and Beams 0.75 0% 0.00
Level -3.50/-0.00 Rf concrete wall 2 0% 0.00
Level -3.50 Topping Concrete 8 cm 0.75 0% 0.00
Level +8.80 Double TT and Beams 0.75 0% 0.00
Prefabricated Roof Structure 2 0% 0.00
Level +5.00 Double TT and Beams 0.75 0% 0.00
Level -+0.00 Double TT and Beams 0.75 0% 0.00
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 0% 0.00
20
Architectural Works 27 0.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 0% 0.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 0%
100
Date : 27 April 2009
100
Date : 04 May 2009 Physical % Completed = 27.24
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00
Piles 2 100% 2.00
Loose Concrete 0.25 100% 0.25
Drainage Works 0.25 100% 0.25
Foundation Wall 0.25 100% 0.25
Water Isolation 0.75 100% 0.75
Protection concrete 0.5 100% 0.50
9
Prefabricated Production 15 11.20
Columns 4 82% 3.26
Beams 2 70% 1.41
Floors 7 71% 4.98
Roof Elements (purlin) 1.5 98% 1.47
Roof Elements (truss) 0.2 39% 0.08
Roof Elements (gutter) 0.3 0% 0.00
15
Structural Works 20 7.04
Anchors 0.25 100% 0.25
Foundation Steel Works 3 100% 3.00
Fittings in Foundation 0.25 100% 0.25
Foundation Concrete 0.5 100% 0.50
Columns Erection 3 70% 2.10
Level -6.65/-3.50 Rf concrete wall 2 45% 0.90
Level -6.65 topping Concrete 10 cm 0.75 0% 0.00
Level -3.50 Double TT and Beams 0.75 5% 0.04
Level -3.50/-0.00 Rf concrete wall 2 0% 0.00
Level -3.50 Topping Concrete 8 cm 0.75 0% 0.00
Level +8.80 Double TT and Beams 0.75 0% 0.00
Prefabricated Roof Structure 2 0% 0.00
Level +5.00 Double TT and Beams 0.75 0% 0.00
Level -+0.00 Double TT and Beams 0.75 0% 0.00
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 0% 0.00
20
Architectural Works 27 0.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 0% 0.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 0%
100
Date : 04 May 2009
100
Date : 11 May 2009 Physical % Completed = 30.27
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 12.74
Columns 4 94% 3.75
Beams 2 82% 1.65
Floors 7 79% 5.56
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 61% 0.12
Roof Elements (gutter) 0.3 50% 0.15
15
Structural Works 20 8.54
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 80% 2.40
Level -6.65/-3.50 Rf concrete wall 2 90% 1.80
Level -6.65 topping Concrete 10 cm 0.75 0% 0.00
Level -3.50 Double TT and Beams 0.75 15% 0.11
Level -3.50/-0.00 Rf concrete wall 2 0% 0.00
Level -3.50 Topping Concrete 8 cm 0.75 0% 0.00
Level +8.80 Double TT and Beams 0.75 0% 0.00
Prefabricated Roof Structure 2 0% 0.00
Level +5.00 Double TT and Beams 0.75 0% 0.00
Level -+0.00 Double TT and Beams 0.75 0% 0.00
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 30% 0.23
20
Architectural Works 27 0.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 0% 0.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 10%
100
Date : 11 May 2009
100
Date : 18 May 2009 Physical % Completed = 33.00
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 13.93
Columns 4 100% 4.00 ü
Beams 2 94% 1.88
Floors 7 87% 6.09
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 83% 0.17
Roof Elements (gutter) 0.3 95% 0.29
15
Structural Works 20 10.08
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 80% 2.40
Level -6.65/-3.50 Rf concrete wall 2 95% 1.90
Level -6.65 topping Concrete 10 cm 0.75 0% 0.00
Level -3.50 Double TT and Beams 0.75 30% 0.23
Level -3.50/-0.00 Rf concrete wall 2 55% 1.10
Level -3.50 Topping Concrete 8 cm 0.75 0% 0.00
Level +8.80 Double TT and Beams 0.75 0% 0.00
Prefabricated Roof Structure 2 0% 0.00
Level +5.00 Double TT and Beams 0.75 0% 0.00
Level -+0.00 Double TT and Beams 0.75 0% 0.00
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 60% 0.45
20
Architectural Works 27 0.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 0% 0.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 20%
100
Date : 18 May 2009
100
Date : 25 May 2009 Physical % Completed = 36.40
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 14.62
Columns 4 100% 4.00 ü
Beams 2 99% 1.98
Floors 7 95% 6.64
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 12.79
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 85% 2.55
Level -6.65/-3.50 Rf concrete wall 2 98% 1.96
Level -6.65 topping Concrete 10 cm 0.75 0% 0.00
Level -3.50 Double TT and Beams 0.75 57% 0.43
Level -3.50/-0.00 Rf concrete wall 2 98% 1.96
Level -3.50 Topping Concrete 8 cm 0.75 0% 0.00
Level +8.80 Double TT and Beams 0.75 22% 0.17
Prefabricated Roof Structure 2 23% 0.46
Level +5.00 Double TT and Beams 0.75 45% 0.33
Level -+0.00 Double TT and Beams 0.75 43% 0.33
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 80% 0.60
20
Architectural Works 27 0.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 0% 0.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 60%
100
Date : 25 May 2009
100
Date : 01 June 2009 Physical % Completed = 39.40
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 14.89
Columns 4 100% 4.00 ü
Beams 2 99% 1.98
Floors 7 99% 6.91
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 14.76
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 93% 2.78
Level -6.65/-3.50 Rf concrete wall 2 98% 1.96
Level -6.65 topping Concrete 10 cm 0.75 25% 0.19
Level -3.50 Double TT and Beams 0.75 71% 0.53
Level -3.50/-0.00 Rf concrete wall 2 98% 1.96
Level -3.50 Topping Concrete 8 cm 0.75 40% 0.30
Level +8.80 Double TT and Beams 0.75 80% 0.60
Prefabricated Roof Structure 2 42% 0.84
Level +5.00 Double TT and Beams 0.75 65% 0.49
Level -+0.00 Double TT and Beams 0.75 60% 0.45
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 0% 0.00
Vertical water isolation 0.75 90% 0.68
20
Architectural Works 27 0.75
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 15% 0.75
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 70%
100
Date : 01 June 2009
100
Date : 08 June 2009 Physical % Completed = 42.94
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 16.94
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 97% 2.91
Level -6.65/-3.50 Rf concrete wall 2 99% 1.98
Level -6.65 topping Concrete 10 cm 0.75 55% 0.41
Level -3.50 Double TT and Beams 0.75 83% 0.62
Level -3.50/-0.00 Rf concrete wall 2 99% 1.98
Level -3.50 Topping Concrete 8 cm 0.75 55% 0.41
Level +8.80 Double TT and Beams 0.75 96% 0.72
Prefabricated Roof Structure 2 77% 1.53
Level +5.00 Double TT and Beams 0.75 83% 0.62
Level -+0.00 Double TT and Beams 0.75 83% 0.63
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 55% 0.41
Vertical water isolation 0.75 95% 0.71
20
Architectural Works 27 2.00
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 40% 2.00
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 80%
100
Date : 08 June 2009
100
Date : 15 June 2009 Physical % Completed = 44.06
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 17.81
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 99% 1.98
Level -6.65 topping Concrete 10 cm 0.75 90% 0.68
Level -3.50 Double TT and Beams 0.75 94% 0.71
Level -3.50/-0.00 Rf concrete wall 2 99% 1.98
Level -3.50 Topping Concrete 8 cm 0.75 75% 0.56
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 77% 1.53
Level +5.00 Double TT and Beams 0.75 94% 0.71
Level -+0.00 Double TT and Beams 0.75 91% 0.68
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 0% 0.00
Level -0.00 Topping Concrete 8 cm 0.75 70% 0.53
Vertical water isolation 0.75 95% 0.71
20
Architectural Works 27 2.25
Terrace Roof 1 0% 0.00
Roof Construction & Covering 5 0% 0.00
Syphonic System 1 0% 0.00
Façade Covering 5 45% 2.25
Interior Walls 2 0% 0.00
Plastering and Grouting 1 0% 0.00
Thermal Insulation 1 0% 0.00
Doors and Windows 3 0% 0.00
Floor Coverings 2 0% 0.00
Paint works 3 0% 0.00
Carpet floors 2 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 80%
100
Date : 15 June 2009
100
Date : 22 June 2009 Physical % Completed = 48.53
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 19.23
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 80% 0.60
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 0% 0.00
Level +5.00 Topping Concrete 8 cm 0.75 70% 0.53
Level -0.00 Topping Concrete 8 cm 0.75 80% 0.60
Vertical water isolation 0.75 100% 0.75
20
Architectural Works 27 5.30
Terrace Roof 0.75 0% 0.00
Roof Construction & Covering 5 40% 2.00
Façade Covering 5 45% 2.25
Level -6.65 interior walls 0.5 40% 0.20
Level -3.50 interior walls 0.5 20% 0.10
Level ±0.00 interior walls 1 0% 0.00
Level +5.00 interior walls 1 0% 0.00
Level -6.65 plastering and grouting 0.2 0% 0.00
Level -3.50 plastering and grouting 0.2 0% 0.00
Level ±0.00 plastering and grouting 0.2 0% 0.00
Level +5.00 plastering and grouting 0.2 0% 0.00
Staircases grouting 0.2 0% 0.00
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 0% 0.00
Ceiling and Suspended Ceiling works (Level -6.65) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level ±0.00) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level +5.00) 0.5 0% 0.00
Paint works 3 0% 0.00
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 70% 0.35
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 0%
Backfill+Environment Works 2 85%
100
Date : 22 June 2009
100
Date : 29 June 2009 Physical % Completed = 53.15
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 20.00
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 100% 0.25 ü
Level +5.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level -0.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Vertical water isolation 0.75 100% 0.75 ü
20
Architectural Works 27 9.15
Terrace Roof 0.75 0% 0.00
Roof Construction & Covering 5 90% 4.50
Façade Covering 5 45% 2.25
Level -6.65 interior walls 0.5 90% 0.45
Level -3.50 interior walls 0.5 90% 0.45
Level ±0.00 interior walls 1 70% 0.70
Level +5.00 interior walls 1 0% 0.00
Level -6.65 plastering and grouting 0.2 0% 0.00
Level -3.50 plastering and grouting 0.2 0% 0.00
Level ±0.00 plastering and grouting 0.2 0% 0.00
Level +5.00 plastering and grouting 0.2 0% 0.00
Staircases grouting 0.2 0% 0.00
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 0% 0.00
Ceiling and Suspended Ceiling works (Level -6.65) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level ±0.00) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level +5.00) 0.5 0% 0.00
Paint works 3 0% 0.00
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 80% 0.40
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 0%
Mechanical Works 13 5%
Backfill+Environment Works 2 85%
100
Date : 29 June 2009
100
Date : 06 July 2009 Physical % Completed = 54.15
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 20.00
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 100% 0.25 ü
Level +5.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level -0.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Vertical water isolation 0.75 100% 0.75 ü
20
Architectural Works 27 10.15
Terrace Roof 0.75 65% 0.49
Roof Construction & Covering 5 95% 4.75
Façade Covering 5 45% 2.25
Level -6.65 interior walls 0.5 90% 0.45
Level -3.50 interior walls 0.5 90% 0.45
Level ±0.00 interior walls 1 90% 0.90
Level +5.00 interior walls 1 0% 0.00
Level -6.65 plastering and grouting 0.2 30% 0.06
Level -3.50 plastering and grouting 0.2 0% 0.00
Level ±0.00 plastering and grouting 0.2 0% 0.00
Level +5.00 plastering and grouting 0.2 0% 0.00
Staircases grouting 0.2 0% 0.00
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 0% 0.00
Ceiling and Suspended Ceiling works (Level -6.65) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level ±0.00) 0.5 0% 0.00
Ceiling and Suspended Ceiling works (Level +5.00) 0.5 0% 0.00
Paint works 3 0% 0.00
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 80% 0.40
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 10%
Mechanical Works 13 10%
Backfill+Environment Works 2 85%
100
Date : 06 July 2009
100
Date : 09 July 2009 Physical % Completed = 60.71
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 20.00
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 100% 0.25 ü
Level +5.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level -0.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Vertical water isolation 0.75 100% 0.75 ü
20
Architectural Works 27 10.96
Terrace Roof 0.75 80% 0.60
Roof Construction & Covering 5 95% 4.75
Façade Covering 5 50% 2.50
Level -6.65 interior walls 0.5 95% 0.48
Level -3.50 interior walls 0.5 95% 0.48
Level ±0.00 interior walls 1 95% 0.95
Level +5.00 interior walls 1 0% 0.00
Level -6.65 plastering and grouting 0.2 80% 0.16
Level -3.50 plastering and grouting 0.2 50% 0.10
Level ±0.00 plastering and grouting 0.2 0% 0.00
Level +5.00 plastering and grouting 0.2 0% 0.00
Staircases grouting 0.2 0% 0.00
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 0% 0.00
Ceiling and Suspended Ceiling works (Level -6.65) 0.25 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.75 20% 0.15
Ceiling and Suspended Ceiling works (Level ±0.00) 0.25 0% 0.00
Ceiling and Suspended Ceiling works (Level +5.00) 0.75 0% 0.00
Paint works 3 0% 0.00
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 80% 0.40
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 15% 2.10
Mechanical Works 13 15% 1.95
Backfill+Environment Works 2 85% 1.70
100
Date : 09 July 2009
100
Date : 13 July 2009 Physical % Completed = 64.67
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 20.00
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 100% 0.25 ü
Level +5.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level -0.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Vertical water isolation 0.75 100% 0.75 ü
20
Architectural Works 27 12.97
Terrace Roof 0.75 100% 0.75 ü
Roof Construction & Covering 5 95% 4.75
Façade Covering 5 70% 3.50
Level -6.65 interior walls 0.5 100% 0.50 ü
Level -3.50 interior walls 0.5 95% 0.48
Level ±0.00 interior walls 1 100% 1.00 ü
Level +5.00 interior walls 1 20% 0.20
Level -6.65 plastering and grouting 0.2 80% 0.16
Level -3.50 plastering and grouting 0.2 80% 0.16
Level ±0.00 plastering and grouting 0.2 0% 0.00
Level +5.00 plastering and grouting 0.2 0% 0.00
Staircases grouting 0.2 25% 0.05
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 0% 0.00
Ceiling and Suspended Ceiling works (Level -6.65) 0.25 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.75 70% 0.53
Ceiling and Suspended Ceiling works (Level ±0.00) 0.25 40% 0.10
Ceiling and Suspended Ceiling works (Level +5.00) 0.75 0% 0.00
Paint works 3 0% 0.00
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 80% 0.40
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 15% 2.10
Mechanical Works 13 30% 3.90
Backfill+Environment Works 2 85% 1.70
100
Date : 13 July 2009
100
Date : 20 July 2009 Physical % Completed = 68.22
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 20.00
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 100% 0.25 ü
Level +5.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level -0.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Vertical water isolation 0.75 100% 0.75 ü
20
Architectural Works 27 14.52
Terrace Roof 0.75 100% 0.75 ü
Roof Construction & Covering 5 95% 4.75
Façade Covering 5 80% 4.00
Level -6.65 interior walls 0.5 100% 0.50 ü
Level -3.50 interior walls 0.5 100% 0.50 ü
Level ±0.00 interior walls 1 100% 1.00 ü
Level +5.00 interior walls 1 50% 0.50
Level -6.65 plastering and grouting 0.2 90% 0.18
Level -3.50 plastering and grouting 0.2 90% 0.18
Level ±0.00 plastering and grouting 0.2 70% 0.14
Level +5.00 plastering and grouting 0.2 0% 0.00
Staircases grouting 0.2 45% 0.09
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 0% 0.00
Ceiling and Suspended Ceiling works (Level -6.65) 0.25 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.75 90% 0.68
Ceiling and Suspended Ceiling works (Level ±0.00) 0.25 60% 0.15
Ceiling and Suspended Ceiling works (Level +5.00) 0.75 0% 0.00
Paint works 3 10% 0.30
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 80% 0.40
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 20% 2.80
Mechanical Works 13 40% 5.20
Backfill+Environment Works 2 85% 1.70
100
Date : 20 July 2009
100
Date : 27 July 2009 Physical % Completed = 72.32
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 20.00
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 100% 0.25 ü
Level +5.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level -0.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Vertical water isolation 0.75 100% 0.75 ü
20
Architectural Works 27 15.92
Terrace Roof 0.75 100% 0.75 ü
Roof Construction & Covering 5 95% 4.75
Façade Covering 5 85% 4.25
Level -6.65 interior walls 0.5 100% 0.50 ü
Level -3.50 interior walls 0.5 100% 0.50 ü
Level ±0.00 interior walls 1 100% 1.00 ü
Level +5.00 interior walls 1 90% 0.90
Level -6.65 plastering and grouting 0.2 100% 0.20
Level -3.50 plastering and grouting 0.2 98% 0.20
Level ±0.00 plastering and grouting 0.2 80% 0.16
Level +5.00 plastering and grouting 0.2 0% 0.00
Staircases grouting 0.2 55% 0.11
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 0% 0.00
Ceiling and Suspended Ceiling works (Level -6.65) 0.25 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.75 95% 0.71
Ceiling and Suspended Ceiling works (Level ±0.00) 0.25 75% 0.19
Ceiling and Suspended Ceiling works (Level +5.00) 0.75 0% 0.00
Paint works 3 30% 0.90
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 80% 0.40
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 30% 4.20
Mechanical Works 13 50% 6.50
Backfill+Environment Works 2 85% 1.70
100
Date : 27 July 2009
100
Date : 03 August 2009 Physical % Completed = 76.95
Construction
Earth Works 9 Weight % Comp 9.00
Excavation 5 100% 5.00 ü
Piles 2 100% 2.00 ü
Loose Concrete 0.25 100% 0.25 ü
Drainage Works 0.25 100% 0.25 ü
Foundation Wall 0.25 100% 0.25 ü
Water Isolation 0.75 100% 0.75 ü
Protection concrete 0.5 100% 0.50 ü
9
Prefabricated Production 15 15.00
Columns 4 100% 4.00 ü
Beams 2 100% 2.00 ü
Floors 7 100% 7.00 ü
Roof Elements (purlin) 1.5 100% 1.50 ü
Roof Elements (truss) 0.2 100% 0.20 ü
Roof Elements (gutter) 0.3 100% 0.30 ü
15
Structural Works 20 20.00
Anchors 0.25 100% 0.25 ü
Foundation Steel Works 3 100% 3.00 ü
Fittings in Foundation 0.25 100% 0.25 ü
Foundation Concrete 0.5 100% 0.50 ü
Columns Erection 3 100% 3.00 ü
Level -6.65/-3.50 Rf concrete wall 2 100% 2.00 ü
Level -6.65 topping Concrete 10 cm 0.75 100% 0.75 ü
Level -3.50 Double TT and Beams 0.75 100% 0.75 ü
Level -3.50/-0.00 Rf concrete wall 2 100% 2.00 ü
Level -3.50 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level +8.80 Double TT and Beams 0.75 100% 0.75 ü
Prefabricated Roof Structure 2 100% 2.00 ü
Level +5.00 Double TT and Beams 0.75 100% 0.75 ü
Level -+0.00 Double TT and Beams 0.75 100% 0.75 ü
Level +8.80 Topping Concrete 8 cm 0.25 100% 0.25 ü
Level +5.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Level -0.00 Topping Concrete 8 cm 0.75 100% 0.75 ü
Vertical water isolation 0.75 100% 0.75 ü
20
Architectural Works 27 17.85
Terrace Roof 0.75 100% 0.75 ü
Roof Construction & Covering 5 100% 5.00 ü
Façade Covering 5 90% 4.50 ü
Level -6.65 interior walls 0.5 100% 0.50 ü
Level -3.50 interior walls 0.5 100% 0.50 ü
Level ±0.00 interior walls 1 100% 1.00 ü
Level +5.00 interior walls 1 100% 1.00 ü
Level -6.65 plastering and grouting 0.2 100% 0.20 ü
Level -3.50 plastering and grouting 0.2 100% 0.20 ü
Level ±0.00 plastering and grouting 0.2 90% 0.18
Level +5.00 plastering and grouting 0.2 40% 0.08
Staircases grouting 0.2 70% 0.14
Staircases epoxy covering 0.25 0% 0.00
Doors and Windows 3 30% 0.90
Ceiling and Suspended Ceiling works (Level -6.65) 0.25 0% 0.00
Ceiling and Suspended Ceiling works (Level -3.50) 0.75 95% 0.71
Ceiling and Suspended Ceiling works (Level ±0.00) 0.25 75% 0.19
Ceiling and Suspended Ceiling works (Level +5.00) 0.75 0% 0.00
Paint works 3 40% 1.20
Level -6.65 floor coverings 0.5 80% 0.40
Level -3.50 floor coverings 0.5 80% 0.40
Level ±0.00 carpet flooring 1 0% 0.00
Level +5.00 carpet flooring 1 0% 0.00
Fixed Furniture & Equipment 1 0% 0.00
27
Electrical Works 14 40% 5.60
Mechanical Works 13 60% 7.80
Backfill+Environment Works 2 85% 1.70
100
Date : 03 August 2009