[PROJECT]

BQ PROGRESS CHECK LIST

Overall Percentage
Completion
No. Title Start Date Completion Complete
Date
Date %

1 Site Work 10%


2 Excavation 10%
3 Landscaping etc
4 Concrete Works 20%
5 Pour Concrete 20%
6 Reinforcement etc
7 Masonry 0%
8 Walls and Piers 0%
9 Reinforcement etc 0%
10 Metalwork 10%
11 Structural Metalwork 10%
12 Non Structural Metalwork etc
13 Woodwork 10%
14 Structural Timbers 10%
15 Ironmongery etc
16 Thermal and Moisture Protection 10%
17 Coverings and linings 10%
18 Ceiling Finishes
19 Doors and Windows 10%
20 Doors 20%
21 Windows etc
22 Finishes
23 Backgrounds 10%
24 Decorations etc 10%
25 Accessories
26 Partitions etc 10%
27 Equipment
28 Generally etc 10%
29 Furnishings
30 Generally etc 10%
31 Special Construction
32 Generally etc 10%
33 Conveying Systems
34 Generally etc 10%
35 Mechanical Engineering Installations
36 Generally etc 10%
37 Electrical Engineering Installations
38 Generally etc 10%