INSPECTION TEST PLAN (ITP)

INSPECTION TEST PLAN (ITP)

Customer: Ministry of Defense INSPECTION AND TEST PLAN for


Contract Number: 445/11 Work area:
Contract/Project Name:
‫ﻋﻘد ﺗﺣﺳﯾن وﺗطوﯾر ﻋﻣﺎﺋر اﻟﺿﺑﺎط واﻷﻓراد ﺑﻘﺎﻋدة اﻟﻣﻠك ﻓﯾﺻل‬
‫اﻟﺑﺣرﯾﺔ ﺑﺟدة‬
Ref Operation or stage of work Stage/ Records Requirement/ Inspection/ test procedure Inspection *what/who
Description Characteristics frequency standard/ Employee Service provider
specification

*W = Witness Point; H = Hold Point; H(A) = Inspection/Test by Authority; U(C) = Inspection/Test by Consultant; S = Surveillance or monitoring; X = Self inspection by
performer of work.
Checklist Samples

Location/
BUILDING: Floor: Date: / /

Points to be check Concrete Works Remarks

Aphalt Layer
Removal 25% √

Waste 10% √
Disposal

Asphalt Compaction
10% √
Works & Leveling
100%
MC1
Spray 20% √

Asphalt
Spread 30% √

3rd Party
5%
Tests √

INTSTRUCTIONS

DATE

DATE

DATE

DATE

Work Inspection By : Contractor Engineer Consultant Engineer


Location/
BUILDING: Floor: Date: / /

Points to be check Roof Remarks

Curstones 20% √

Interlocking
Tiles 20% √

Traffic Plates 10% √


Landscaping 100%
Works Cleaning of
Sites & Furniture 15% √

Car Parking
Awnings
15% √

Sidewalks 20% √

INTSTRUCTIONS

DATE

DATE

DATE

DATE

Work Inspection By : Contractor Engineer Consultant Engineer


Location/
BUILDING: Floor: Date: / /2021

Points to be check Roof Remarks

Demolition 10% √

Foam
25% √
Concrete

Membrane 25% √
Roof
100%
Insulation Thermal
10% √
Insulation
Geotextile
20% √
& Tiling

Skirting 10% √

INTSTRUCTIONS

DATE

DATE

DATE

DATE

Work Inspection By : Contractor Engineer Consultant Engineer


Location/
BUILDING: Floor: Date: / /2021

Points to be check Roof Remarks

Floor Removal 10% √

Sanitary
Fixture 25% √
removal

Bathroom
Insulation 25% √
Bathrooms
100%
Insulation Bathroom
Flooring 10% √

Wall Cladding 20% √

Testing of piping
10% √

INTSTRUCTIONS

DATE

DATE

DATE

DATE

Work Inspection By : Contractor Engineer Consultant Engineer


Location/
BUILDING: Floor: Date: / /2021

Points to be check Roof Remarks

Surface
5% √
prep.

Coating 30% √
Internal 100%
Painting
Painting 60% √

Curing 5% √

INTSTRUCTIONS

DATE

DATE

DATE

DATE

Work Inspection By : Contractor Engineer Consultant Engineer


Location/
BUILDING: Floor: Date: / /2021

Points to be check Roof Remarks

Scaffolding 10% √

Preparation 30% √
External
100%
Painting
Base Layer 25% √

Final Layer 35% √

INTSTRUCTIONS

DATE

DATE

DATE

DATE

Work Inspection By : Contractor Engineer Consultant Engineer


Location/
BUILDING: Floor: Date: / /2021

Points to be check Roof Remarks

Sanitary Fixtures 10% √

Water Heaters 30% √


Internal
Mechanical 100%
Works Pipe & Drain
Connections 25% √

Electrical
Outlet 35% √
Connections

INTSTRUCTIONS

DATE

DATE

DATE

DATE

Work Inspection By : Contractor Engineer Consultant Engineer