Professional Documents
Culture Documents
II.1 Fabrication
Shop drawing and Standart Diameter and lenght of cutting not less than Sigmat and
II.1.1 Cut of Rebar Be messured ± 10mm Witness Start to work SPV, QC QC Manager, SM
detail standar detail messuring tape
III.1.1 Cleaning area Clean, no dust, no water, no Visual Client Approval - Witness Start to work - SPV, QC QC Manager
trash
Shop drawing and Standart
III.1.2 Spacer concrete install Be messured Installed in every 80 cm X Y ±50mm Witness Start to work Messuring tape SPV, QC QC Manager
detail
Shop drawing and Standart Diameter, summary, distance, tightening and QC Manager, Cons
III.1.3 Install botom reinforcement Be messured ±20mm Hold point Finish to work Measuring tape SPV, QC
detail extra bar correct with the shop drawing. Manager
Shop drawing and Standart Diameter, summary, distance, tightening and QC Manager, Cons
III.1.4 Install top reinforcement Be messured ±20mm Hold point Finish to work Measuring tape SPV, QC
detail extra bar correct with the shop drawing. Manager