JOB CARD
DAICEC FOR VANITY COUNTER
Rev. No. 00
Page 01 of 01
Safety: Check safety precautions/ Proper Accessibility/ Safe Working area/ Effective use of PPE's
1.908.2.1 3 As Per HIRA
(Evaluate and Write 1 to 5)
Clearance: MEP clearance shall be taken prior to start of work. (Write 1 for confirming and 0 for Shall be taken from concerned
1.908.2.2 3
non confirmng) department
Installation/Checking of Level & Marking: Check for installation as per shop drawing.
1.908.2.3 2 As Per Site Requirement
(Evaluate and Write 1 to 5)
Fixing of G.S Bracket: Ensure that G.S. bracket at work place size & shape are as per shop
1.908.3.1 3 No Devition
drawing. (Evaluate and Write 1 to 5)
Aluminium frame work: Ensure that aluminium frame to be making and fixing detail as per shop As per shop drawing
1.908.3.2 2
drawing (Evaluate and Write 1 to 5)
Stone protection: Ensure that the stone impreganator shall be applied before fixing of stone.
1.908.3.3 2 No Dilution
(Evaluate and Write 1 to 5)
plywood & stone fixing: Ensure that once entire frame work completely install make the all MEP
1.908.3.4 2 As Per Site Requirement
Cutout has done in plywood and stone . (Evaluate and Write 1 to 5)
POST CHECK
1.908.4.1 Line & Level: Check for line & level within tollerance limit . (Evaluate and Write 1 to 5) 2 ±3 mm in 3 meter
1.908.4.2 MEP Cutouts: Check for all cutouts as per Shop Drawing. (Evaluate and Write 1 to 5) 2 As Per Site Requirement
1.908.4.3 Final Surface: Check for Edges polish and joint sealent uniformility. (Evaluate and Write 1 to 5) 2 No Devition
Stone protection: Ensure that the stone Stain resistance sealer shall be applied after fixing of stone.
1.908.4.4 2 No Dilution
(Evaluate and Write 1 to 5)
Overall workmanship
No Objection by the Samsung C&T's Representative shall not relieve SIL of its obligation to complete all the work in accordance with Contract Documents.
Comments: