You are on page 1of 1

SCT/DAIACEC/JC-1.

908
JOB CARD
DAICEC FOR VANITY COUNTER
Rev. No. 00

Page 01 of 01

Sector & Zone: ZONE N ZONE N , N25 Date of Inspection:

Grid and level : BSB02 Time of Inspection:


Measurement Remarks/
CODE CHECK LIST FOR PRE-CONSTRUCTION ACTIVITIES Importance Tolerance/ Requirements
SIL SCT Comments

Safety: Check safety precautions/ Proper Accessibility/ Safe Working area/ Effective use of PPE's
1.908.2.1 3 As Per HIRA
(Evaluate and Write 1 to 5)

Clearance: MEP clearance shall be taken prior to start of work. (Write 1 for confirming and 0 for Shall be taken from concerned
1.908.2.2 3
non confirmng) department

Installation/Checking of Level & Marking: Check for installation as per shop drawing.
1.908.2.3 2 As Per Site Requirement
(Evaluate and Write 1 to 5)

SIL Samsung C&T

Construction Representative QA/QC Engineer Construction Representative QA/QC Engineer


CODE CHECK LIST FOR DURING-CONSTRUCTION ACTIVITIES

Fixing of G.S Bracket: Ensure that G.S. bracket at work place size & shape are as per shop
1.908.3.1 3 No Devition
drawing. (Evaluate and Write 1 to 5)

Aluminium frame work: Ensure that aluminium frame to be making and fixing detail as per shop As per shop drawing
1.908.3.2 2
drawing (Evaluate and Write 1 to 5)

Stone protection: Ensure that the stone impreganator shall be applied before fixing of stone.
1.908.3.3 2 No Dilution
(Evaluate and Write 1 to 5)

plywood & stone fixing: Ensure that once entire frame work completely install make the all MEP
1.908.3.4 2 As Per Site Requirement
Cutout has done in plywood and stone . (Evaluate and Write 1 to 5)

SIL Samsung C&T

Construction Representative QA/QC Engineer Construction Representative QA/QC Engineer

POST CHECK

1.908.4.1 Line & Level: Check for line & level within tollerance limit . (Evaluate and Write 1 to 5) 2 ±3 mm in 3 meter

1.908.4.2 MEP Cutouts: Check for all cutouts as per Shop Drawing. (Evaluate and Write 1 to 5) 2 As Per Site Requirement

1.908.4.3 Final Surface: Check for Edges polish and joint sealent uniformility. (Evaluate and Write 1 to 5) 2 No Devition

Stone protection: Ensure that the stone Stain resistance sealer shall be applied after fixing of stone.
1.908.4.4 2 No Dilution
(Evaluate and Write 1 to 5)

Overall workmanship

No Objection by the Samsung C&T's Representative shall not relieve SIL of its obligation to complete all the work in accordance with Contract Documents.

Action date to be mentioned for rectification of the defects in the PCC -

Comments:

SIL Samsung C&T

Construction Representative QA/QC Engineer Construction Representative QA/QC Engineer